About this forecast

The Department of Homeland Security US Coast Guard is procuring maintenance and repair services for the Ida Lewis Auditorium at Training Center Cape May through the Design/Build Construction Services II (Regional) contract vehicle via CEU Cleveland, with solicitation release estimated for December 21, 2026 and award anticipated for February 11, 2027. Work includes interior and exterior building repairs, construction of new interior partitions, removal and replacement of low-slope roofing systems, repair of exterior CMU wall assemblies and concrete elements, and removal and replacement of select HVAC equipment including air handlers, boilers, condensers, insulated ductwork, dampers, and associated controls.

The estimated award value ranges from $1 million to $2 million under a Firm Fixed Price contract, with performance scheduled from February 11, 2027 through May 22, 2027 at Cape May, New Jersey. Paul Farnan, Architect at the requirements office, serves as the primary point of contact at (609) 898-6316 or paul.c.farnan@uscg.mil; Robert Spangler, Contracting Officer at CEU Cleveland, may be reached at (571) 610-7286 or robert.t.spangler@uscg.mil.

Forecast text

The scope of work generally consists of interior and exterior repairs to the building structure/envelope, construction of new interior partitions, removal and replacement of low-slope roofing systems, as well as the removal and replacement of select HVAC equipment at the Ida Lewis Auditorium at Training Center Cape May. Work includes, but is not limited to:

- The repair of exterior CMU wall assembly;

- The repair of exterior concrete ramp and stairs, including tile finish;

- The construction of new interior partitions; including the installation of interior doors;

- The removal of exiting EPDM roofing system, and the installation of new modified bituminous roofing system;

- The removal of existing air handlers, boilers, condensers, insulated ductwork, dampers, and associated controls; and the installation of new air handlers, boilers, condensers, insulated ductwork, dampers, and associated controls.