IX-551 (c)

Forecast New Requirement Updated

Agency
Solicitation expected
Not on record
Estimated value
$2,000,000 to $7,500,000
Set-aside
No set-aside

Forecast facts

Anticipated award
Through
NAICS code
336611 Ship Building and Repairing
Place of performance
Bremerton, WA
Forecast number
N4523A-26-RFPREQ-PSNS-0175

Forecast details come from the Navy's Long Range Acquisition Estimates. Agencies' dates and values are estimates.

About this forecast

The Department of the Navy Naval Sea Systems Command Puget Sound Naval Shipyard and Intermediate Maintenance Facility is procuring ship maintenance and preservation services for an asset, with an estimated award date of January 1, 2027. The scope includes hull surface blasting and preservation, installation of new zinc anodes and hardware on the underwater hull, tank opening and gas-freeing operations, partial tank preservation, main deck and 02/03 level deck non-skid system application, pump and valve inspection, and asset delivery coordination, with detailed work requirements specified in the full Statement of Work.

The estimated award value ranges from $2 million to $7.5 million for a four-month performance period at Bremerton, Washington. This full and open competition procurement does not carry a set-aside and requires unclassified facility and personnel clearance; the contracting office is N4523A at Puget Sound Naval Shipyard (PSNS), with award expected in the second quarter of fiscal year 2027.

Forecast text

Coordinate with the Contracting Officer, via the SUPERVISOR to deliver the Asset to the Contractor’s facility. Upon docking the Asset, wash, and clean the exterior surfaces of the Asset. Blast and preserve all exterior hull surfaces, underwater body, freeboard, moon pools and bulwark surfaces of the Asset. Fill, drain, air test, inspect each underwater skeg on the Asset. Accomplish visual inspections of hull and body and all tank/voids. Remove existing and install new zinc anodes and hardware on the underwater hull. Shift the Asset on the blocks to achieve 100 percent preservation of underwater hull. Apply non-skid system to main deck and 02/03 level decks. Accomplish preliminary and final air tests to tanks/voids. Open, pump, ventilate, gas free and clean all tanks. Accomplish partial preservation of Qty (24 EA) tanks. Preserve tank/void manhole covers. Identify distinguishing figures and markings, Remove, clean and reinstall rubber fenders. Open and inspect all pumps and overboard discharge valves. Accomplish visual inspection and final closeout inspection of each tank/void upon completion of all work. Install new manhole gaskets and fasteners. Undock the Asset. Arrange and coordinate the delivery of the Asset back to the Government with the Contracting Officer via the SUPERVISOR. Specific details of all work items and tasks required by this Statement of Work or described in this Scope Overview are included in section 3.0 of this Statement of Work.

On GovTribe

Work this forecast

  • Track it in your pipeline
  • Find teaming partners
  • Similar forecasts
  • Ask GovTribe AI about this forecast