Incinerator Replacement at eight (8) Land Ports of Entry

Past New Requirement Updated

Agency
Solicitation expected
Estimated value
$2,000,000 to $5,000,000
Set-aside
Competitive 8(a)

Forecast facts

Anticipated award
Through
NAICS code
238210 Electrical Contractors and Other Wiring Installation Contractors
Place of performance
Throughout Ports of Entry
Forecast number
F2026074476
Points of contact

Forecast details come from DHS's Acquisition Planning Forecast System. Agencies' dates and values are estimates.

About this forecast

The Department of Homeland Security Customs and Border Protection is procuring replacement of eight incinerators at various U.S. Ports of Entry under a competitive 8(a) set-aside, Firm Fixed Price contract awarded under Other Transaction Authority. The replacements address disposition of regulated international waste and Quarantine Material Interceptions mandated by 7 and 9 CFR; the existing incinerator fleet has exceeded its operational lifespan and incurs unsustainable maintenance costs and extended downtime. Solicitation release is estimated for August 17, 2026, with award anticipated for September 21, 2026.

The estimated award value ranges from $2 million to $5 million, with performance scheduled from September 21, 2026 through September 20, 2027 across multiple ports of entry throughout the United States. Elizabeth M. Conner (elizabeth.m.conner@cbp.dhs.gov, 802-272-1568) serves as the requirements contact, and David K. Harrod (David.K.Harrod@cbp.dhs.gov, 202-553-6456) is the Small Business Coordinator.

Forecast text

The U.S. Customs and Border Protection (CBP), Office of Field Operations (OFO) Agriculture Specialists (AS) are responsible for the disposition of regulated international waste and Quarantine Material Interceptions (QMI), as mandated by 7 and 9 Code of Federal Regulations (CFR). To enhance this critical function, CBP is initiating the replacement of eight (8) incinerators situated at various Ports of Entry (POEs). The existing incinerator fleet has exceeded its operational lifespan, leading to unsustainable maintenance and repair costs, coupled with extensive periods of inoperability.

Acquisition Strategy: intend to award 8(a)

On GovTribe

Work this forecast

  • Track it in your pipeline
  • Find teaming partners
  • Similar forecasts
  • Ask GovTribe AI about this forecast