FY26-RECON ENV Support Rpl Water System (Kodiak) PN 32248420

Forecast New Requirement Updated

Agency
Solicitation expected
Estimated value
$10,000,000 to $20,000,000
Set-aside
Competitive 8(a)

Forecast facts

Anticipated award
Through
NAICS code
541330 Engineering Services
Place of performance
Kodiak, AK
Forecast number
F2026073649
Points of contact

Forecast details come from DHS's Acquisition Planning Forecast System. Agencies' dates and values are estimates.

About this forecast

The U.S. Coast Guard is procuring an innovative multi-phased design-build environmental remediation solution for Base Kodiak, Alaska under a competitive 8(a) small business set-aside, with solicitation release estimated for December 15, 2026, and award anticipated for February 10, 2027. The scope encompasses feasibility studies for soil reduction, pilot-scale testing of advanced treatment technologies, and final design and installation of a contaminated media segregation pad and permanent soil management facility capable of performing onsite soil treatment. The contractor must assess available treatment technologies and conduct onsite pilot testing to determine effectiveness against listed contaminants of concern, potentially employing more than one treatment technology to address the contaminants.

The estimated contract value ranges from $10 million to $20 million under a Firm Fixed Price definitive contract with a five-year period of performance running from February 10, 2027 through February 9, 2032. All work is performed in Kodiak, Alaska. Mark Ridgway, requirements contact at CEU Juneau, can be reached at mark.s.ridgway@uscg.mil or (571) 607-2874; Cheryl Berry, Small Business Coordinator, is available at cheryl.a.berry@uscg.mil or (206) 815-5287.

Forecast text

The U.S. Coast Guard (USCG) requires an innovative, long-term solution to manage contaminated environmental media at Base Kodiak, Alaska. This program aims to drastically reduce the generation of soil spoils from construction activities and to develop a permanent facility capable of treating contaminated soil.

This Scope of Work (SOW) outlines a multi-phased design-build project. The contractor shall provide a complete solution encompassing initial feasibility studies for soil reduction, pilot-scale testing of advanced treatment technologies, and the final design and installation of a contaminated media segregation pad and permanent soil management facility. The objective is to develop an integrated soil management system with capabilities to perform onsite soil treatment. An assessment of available treatment technologies shall be conducted with an onsite pilot test determining the effectiveness of treating listed contaminants. There will likely be more than one treatment technology needed to treat contaminants of concern (COCs).

On GovTribe