FY26 Grandfather West Ranger District Ditch Culvert Replacements and Road Reconditioning

Past New Requirement Updated

Agency
Solicitation expected
Estimated value
$5,000,000 to $9,900,000
Set-aside
No set-aside

Forecast facts

Anticipated award
NAICS code
237310 Highway, Street, and Bridge Construction
Forecast number
46458
Points of contact

Forecast details come from the GSA Acquisition Gateway. Agencies' dates and values are estimates.

About this forecast

The Department of Agriculture is seeking a contractor for the FY26 Grandfather West Ranger District Ditch Culvert Replacements and Road Reconditioning project located on the West Roads of the Grandfather Ranger District. The contract encompasses the installation and replacement of 24-inch aluminized corrugated metal ditch relief pipes (CMP), removal and disposal of existing culverts, ditch reshaping and reforming for positive drainage, rip-rap installation for outlet structures, and sediment and erosion control measures including sediment traps, lined ditches, drop inlets, catch basins, and flanged culvert inlets. The project also involves headwall construction, road elevation alterations, excavation, and backfill work, with solicitation expected to be released on September 30, 2026, and contract award anticipated on June 30, 2026.

The estimated award value ranges from $5,000,000 to $9,900,000, with a basic exercised value of $8,379,919. This project falls under NAICS code 237310 (Highway, Street, and Bridge Construction) and will be awarded through full and open competition as a purchase order. Interested parties should contact the United States Department of Agriculture's Small Business office at sm.fs.smallbusiness@usda.gov, with the project located within Region 08, Unit 0811 of the Forest Service.

Forecast text

Project located on West Roads of the Grandfather Ranger District. The road reconditioning ditch relief culvert installations/replacements contract will include all associated work related to the installation of 24 inch aluminized corrugated metal ditch relief pipes (CMP) removal and disposal of existing culverts off government land reshaping/reforming ditches for positive drainage rip-rap for outlet structures and sediment and erosion control sediment traps lined ditches drop inlets catch basins flanged culvert inlets headwalls road elevation alterations excavation and backfill

On GovTribe

Work this forecast

  • Track it in your pipeline
  • Find teaming partners
  • Similar forecasts
  • Ask GovTribe AI about this forecast