FY26 Cheoah East Ranger District Ditch Culvert Replacements and Road Reconditioning

Past New Requirement Updated

Agency
Solicitation expected
Estimated value
$2,000,000 to $4,900,000
Set-aside
No set-aside

Forecast facts

Anticipated award
NAICS code
237310 Highway, Street, and Bridge Construction
Forecast number
46484
Points of contact

Forecast details come from the GSA Acquisition Gateway. Agencies' dates and values are estimates.

About this forecast

The Department of Agriculture is seeking a contractor to perform ditch culvert replacements and road reconditioning work on the East Roads of the Cheoah Ranger District. The scope of work includes installation of 24-inch aluminized corrugated metal ditch relief pipes, removal and disposal of existing culverts, ditch reshaping for positive drainage, rip-rap installation for outlet structures, and sediment and erosion control measures including sediment traps, lined ditches, drop inlets, catch basins, and headwalls, along with road elevation alterations, excavation, and backfill. The solicitation is estimated to be released on September 30, 2026, with an estimated award date of June 30, 2026.

The estimated contract value ranges from $2,000,000 to $4,900,000, with a basic exercised value of $4,072,831. This full and open competition contract will be awarded as a purchase order and performed on government land within the Cheoah Ranger District in Region 08. Interested contractors should contact the United States Department of Agriculture Small Business office at sm.fs.smallbusiness@usda.gov for additional information regarding this Highway, Street, and Bridge Construction opportunity.

Forecast text

Project located on East Roads of the Cheoah Ranger District. The road reconditioning ditch relief culvert installations/replacements contract will include all associated work related to the installation of 24 inch aluminized corrugated metal ditch relief pipes (CMP) removal and disposal of existing culverts off government land reshaping/reforming ditches for positive drainage rip-rap for outlet structures and sediment and erosion control sediment traps lined ditches drop inlets catch basins flanged culvert inlets headwalls road elevation alterations excavation and backfill

On GovTribe

Work this forecast

  • Track it in your pipeline
  • Find teaming partners
  • Similar forecasts
  • Ask GovTribe AI about this forecast