Electric Panel Motor Center Replacement
Past New Requirement Updated
- Agency
-
Federal Emergency Management Agency
Department of Homeland Security
- Solicitation expected
- Estimated value
- $500,000 to $1,000,000
- Set-aside
- Total Small Business
Forecast facts
- Anticipated award
- Through
- NAICS code
- 221122 Electric Power Distribution
- Place of performance
- Denton, TX
- Forecast number
- F2026074166
- Points of contact
-
- Raymond Hixon raymond.hixonj@fema.dhs.gov (940) 898-5345
- Everett Mathis everett.mathis@fema.dhs.gov (940) 231-2784
Forecast details come from DHS's Acquisition Planning Forecast System. Agencies' dates and values are estimates.
About this forecast
The Federal Emergency Management Agency is procuring replacement of an Electric Motor Control Center (Electrical Main Panel) at its Denton, Texas facility under a Total Small Business set-aside, firm fixed price contract through the Building Maintenance and Operations FSSI vehicle. The existing panel, installed in 1962 and documented as significantly deteriorated in Facility Condition Assessments conducted in 2014, 2018, and 2022, presents operational and safety risks due to limited spare parts availability and performance below minimum standards. The solicitation released on August 5, 2026, with award anticipated for September 20, 2026.
The estimated award value ranges from $500,000 to $1,000,000, with performance scheduled through January 20, 2027, at the FEMA facility in Denton, Texas. Raymond Hixon (Requirements Contact) is available at raymond.hixonj@fema.dhs.gov or (940) 898-5345, and Everett Mathis (Contracting Officer's Representative) is available at everett.mathis@fema.dhs.gov or (940) 231-2784.
Forecast text
The Electric Motor Control Center (Electrical Main Panel), installed in 1962, is a vital infrastructure component for the facility’s daily operations. Facility Condition Assessments conducted in 2014, 2018, and 2022 have documented significant material deterioration, increased risk of system failure, and limited availability of replacement parts. The panel is currently operating marginally, struggling to meet minimum standards, and is expected to decline further, threatening operational continuity and safety