Design and Construct New Border Patrol Station in Rio Grande City, TX
Past New Requirement Updated
- Agency
-
Customs and Border Protection
Department of Homeland Security
- Solicitation expected
- Estimated value
- $100,000,000 or more
- Set-aside
- No set-aside
Forecast facts
- Anticipated award
- Through
- NAICS code
- 236220 Commercial and Institutional Building Construction
- Place of performance
- Rio Grande City, TX
- Forecast number
- F2026073406
- Points of contact
-
- Chris Anzaldua christopher.a.anzaldua@associates.cbp.dhs.gov (956) 999-9999
Forecast details come from DHS's Acquisition Planning Forecast System. Agencies' dates and values are estimates.
About this forecast
U.S. Customs and Border Protection is procuring design and construction of a new Border Patrol Station in Rio Grande City, Texas under the CBP Multiple Award Design-Build IDIQ, with solicitation release scheduled for July 1, 2026 and award anticipated October 15, 2026. The scope includes demolition of the existing station, acquisition of adjacent privately-owned land, construction of a modern facility to accommodate 538 staff members, and decommissioning of existing facilities after CBP vacates. The existing station must remain operational throughout construction, and the contractor must submit a detailed construction sequencing and staging plan for CBP approval prior to commencing work.
The estimated award value is $100 million, with performance extending from October 15, 2026 through September 1, 2029. Work is performed in Rio Grande City, Texas. Chris Anzaldua, Administration and Facilities Contracting Division, serves as the primary point of contact at christopher.a.anzaldua@associates.cbp.dhs.gov or (956) 999-9999.
Forecast text
Design and construction of a new Border Patrol Station (BPS) to be located on the existing BPS site in Rio Grande City, Texas. Demolish of existing facilities will be required. Acquisition of adjacent privately-owned land is required to supplement the area required to construct the new station and an additional ingress/egress roadway (per USBP design requirements). A new station is required to support 538 staff (includes 505 agents). The existing station, built around 2000, was originally designed and constructed for 125 agents. The Contractor’s design and build shall comply with the requirements listed in Scope of Work (SOW) including the Compliance Documents in the SOW. The existing BPS shall remain operational throughout the construction and commissioning of the new facility. The Contractor shall submit a construction sequencing and staging plan detailing the transition to the new facility and continued operations, as well as measures to facilitate traffic during construction, for CBP’s review and approval prior to the start of construction. The Contractor shall decommission and dispose of the existing BPS facilities per federal requirements after the USBP has vacated the existing facilities. The Contractor shall conduct a visual site visit to assess site conditions, constraints, and topography. This visit will ensure the Contractor fully understands the operational environment and is able to provide an informed response to the Request for Proposal (RFP).
Acquisition Strategy: This requirement will be competed against the U.S. Customs and Border Protection Multiple Award Design-Build IDIQ.
On GovTribe
Work this forecast
- Track it in your pipeline
- Find teaming partners
- Similar forecasts
- Ask GovTribe AI about this forecast