Demolition of Wildfire-Damaged Buildings

Forecast New Requirement Updated

Agency
Solicitation expected
Estimated value
$500,000 to $999,000
Set-aside
No set-aside

Forecast facts

Anticipated award
Not on record
NAICS code
236220 Commercial and Institutional Building Construction
Place of performance
WA
Forecast number
51613
Points of contact

Forecast details come from the GSA Acquisition Gateway. Agencies' dates and values are estimates.

About this forecast

The Department of the Interior's Bureau of Indian Affairs, Yakama Agency Forestry is soliciting demolition and site restoration services for two wildfire-damaged buildings that have collapsed at 151 Rodeo Drive, Harrah, Washington 98952, with an estimated solicitation release date of December 31, 2026. The contractor will perform hazardous-material characterization, removal and lawful disposal of fire debris and building materials, protection and securing of reusable utilities, backfilling, rough grading, and provide required disposal and closeout documentation, with work to be completed within 60 calendar days after Notice to Proceed and operations limited to 6:00 a.m. to 6:00 p.m. due to proximity to residences.

The estimated award value ranges from $500,000 to $999,000 under a firm fixed-price definitive contract with no set-aside applied. Work is performed at the Harrah, Washington location, and Christopher McClure (christopher.mcclure@bia.gov) serves as the point of contact at the Bureau of Indian Affairs.

Forecast text

The Bureau of Indian Affairs, Yakama Agency Forestry anticipates an FY27 requirement for demolition and site restoration at 151 Rodeo Drive, Harrah, Washington 98952. The acquisition will address two wildfire-damaged buildings that have collapsed and require removal. The contractor will be responsible for hazardous-material characterization; removal and lawful disposal of fire debris, building materials, concrete slabs and foundations, and associated concrete features; protection and securing of utilities intended for future reuse; backfilling of excavated areas; rough grading; and providing required disposal and closeout documentation. If regulated materials are identified through characterization, associated removal will be handled through separately priced items.

The purpose of the requirement is to remove the fire-damaged structures and leave the affected areas clean, stable, and suitable for future use by BIA Yakama Agency Forestry. Work is expected to be completed within 60 calendar days after Notice to Proceed, with contractor operations limited to 6:00 a.m. to 6:00 p.m. due to nearby residences. This is to be a new contract.

On GovTribe

Work this forecast

  • Track it in your pipeline
  • Find teaming partners
  • Similar forecasts
  • Ask GovTribe AI about this forecast