Construct Kingsville, TX US77 Checkpoint

Past New Requirement Updated

Agency
Solicitation expected
Estimated value
$100,000,000 or more
Set-aside
No set-aside

Forecast facts

Anticipated award
Through
NAICS code
236220 Commercial and Institutional Building Construction
Place of performance
Kingsville, TX
Forecast number
F2026073295
Points of contact

Forecast details come from DHS's Acquisition Planning Forecast System. Agencies' dates and values are estimates.

About this forecast

U.S. Customs and Border Protection (CBP) forecasts a new requirement for a design-build replacement of its deficient Border Patrol checkpoint on Highway 77 in Kingsville, Texas, with an estimated solicitation release of 2026-08-10 and an estimated award on 2026-11-30. The project covers a marketing survey for land purchase, a traffic study, leasing necessary Texas Department of Transportation land, site selection and purchase, an environmental assessment, and programming, design, and construction, with the new checkpoint complying with the 2026 U.S. Border Patrol Checkpoint Design Standard (CPDS) and policies as required. The acquisition is a firm fixed price task order off a multiple award IDIQ, with no set-aside used, and the Administration and Facilities Contracting Division (AFCD) is the contracting office for the Administration and Facilities Requirements Office (AFRO).

The minimum estimated award value is $100 million, with an estimated period of performance from 2026-11-30 through 2029-09-01, and the additional information lists an anticipated award date of 2026-11-18. Work is performed in Kingsville, TX 78363, USA, within the Rio Grande Valley sector. Mit Patel is the point of contact (mitesh.patel@cbp.dhs.gov, (214) 701-1734), and David Harrod is the small business coordinator (David.K.Harrod@cbp.dhs.gov, (202) 553-6456).

Forecast text

The purpose of this project is to relocate the existing deficient/inadequate checkpoint on Highway 77 to an adequate site meeting the projected requirements; continue with the marketing survey for land purchase; accomplish a traffic study; confer and lease necessary Texas Department of Transportation (TXDOT) land; select a site, and purchase land for said checkpoint; accomplish an environmental assessment; accomplish programming, design, and construction of said facility.

Design-build a new Border Patrol Checkpoint in the Rio Grande Valley sector, Kingsville, Texas on Highway 77. The new checkpoint shall comply with the 2026 U.S. Border Patrol Checkpoint Design

Standard (CPDS) and policies as required.

Acquisition Strategy: Task Order off of Multiple award IDIQ.

On GovTribe

Work this forecast

  • Track it in your pipeline
  • Find teaming partners
  • Similar forecasts
  • Ask GovTribe AI about this forecast