CARL - 12217 - Hurricane HELENE - Install Permanent Footbridge on the Front Lake Trail
Forecast New Requirement Updated
- Agency
-
Department of the Interior
- Solicitation expected
- Estimated value
- $500,000 to $999,000
- Set-aside
- No set-aside
Forecast facts
- Anticipated award
- Not on record
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- NC
- Forecast number
- 50290
- Points of contact
-
- Ashley R Pipkin ashley_pipkin@nps.gov
Forecast details come from the GSA Acquisition Gateway. Agencies' dates and values are estimates.
About this forecast
The Department of the Interior National Park Service is procuring the design and construction of a permanent elevated pedestrian footbridge approximately 110 feet in length to replace two bridges destroyed by Hurricane Helene on the Front Lake Trail in North Carolina. The new single-span structure will be engineered and built to cross the impacted area where Helene's flooding eroded the central island that previously supported two independent bridges. Solicitation is estimated for release January 31, 2027.
The estimated award value ranges from $500,000 to $999,000. Place of performance is North Carolina. Ashley R Pipkin, Outdoor Recreation Planner at the National Park Service, is the point of contact (ashley_pipkin@nps.gov).
Forecast text
Two footbridges destroyed by the Helene will be permanently replaced with a single elevated pedestrian bridge, approximately 110 feet in length. The new structure will span the entire impacted area where Hurricane Helene’s flooding eroded the small central island that previously supported the two independent bridges. The permanent bridge will be designed and constructed through contract.