32059865: Repair Pier Electrical at Base Alameda - Phase 2: Construction

Forecast New Requirement Updated

Agency
Solicitation expected
Estimated value
$1,000,000 to $2,000,000
Set-aside
Service-Disabled Veteran-Owned Small Business

Forecast facts

Anticipated award
Through
NAICS code
237990 Other Heavy and Civil Engineering Construction
Place of performance
Alameda, CA
Forecast number
F2026074921
Points of contact

Forecast details come from DHS's Acquisition Planning Forecast System. Agencies' dates and values are estimates.

About this forecast

The U.S. Coast Guard is procuring phase 2 construction services to repair and recapitalize pier electrical distribution at USCG Base Alameda under a Service-Disabled Veteran-Owned Small Business set-aside, with solicitation estimated for release June 1, 2027 and award July 1, 2027. The contractor shall provide all labor, management, materials, and equipment to replace failing electrical feeders, raceways, and conduit systems and to complete replacement and restoration of power module three following fire damage, with project options and bid alternates including circuit breaker retrofits and complete switchgear and switchboard replacement to deliver a safe, code-compliant, and reliable shore power distribution system.

The estimated award value ranges from $1 million to $2 million under a firm fixed-price contract, with performance scheduled from July 1, 2027 through September 30, 2027 at USCG Base Alameda, California. CEU Oakland is the contracting office procuring through the Design/Build Construction Services II (Regional) (RMACC II) vehicle. Tony Flores, Contracting Specialist, serves as the requirements contact at tony.l.flores@uscg.mil or (571) 607-1071; Samantha Watts, SBS Coordinator, may also be reached at samantha.c.watts1@uscg.mil or (571) 607-1651.

Forecast text

The Contractor shall provide all labor, management, materials, and equipment required to execute phase (2) construction for the repair and recapitalization of pier electrical distribution at USCG Base Alameda. The base requirement encompasses the replacement of failing electrical feeders, raceways, and conduit systems, as well as the complete replacement and restoration of power module three following fire damage. Project options and bid alternates include circuit breaker retrofits and complete switchgear and switchboard replacement to deliver a safe, code-compliant, and reliable shore power distribution system.

On GovTribe

Work this forecast

  • Track it in your pipeline
  • Find teaming partners
  • Similar forecasts