25R0009- Award - Deck and Hatch Assembly (C)

Past New Requirement Updated

Agency
Solicitation expected
Estimated value
$7,500,000 to $50,000,000
Set-aside
No set-aside

Forecast facts

Anticipated award
NAICS code
332999 All Other Miscellaneous Fabricated Metal Product Manufacturing
Place of performance
Port Hueneme, CA
Forecast number
N63394-25-RFPREQ-PHD-E03-0211

Forecast details come from the Navy's Long Range Acquisition Estimates. Agencies' dates and values are estimates.

About this forecast

The Naval Surface Warfare Center Port Hueneme Division is procuring Deck and Hatch Assembly components for the MK 41 Vertical Launching System, a safety-critical upper assembly containing eight cell hatches and one uptake hatch with mechanical opening systems and a module deluge system for hazard mitigation. The assembly requires precise alignment with other VLS module components and becomes part of ship structure when installed in combatants. Solicitation is estimated to release 2026-07-01, with award targeted for 2027-01-01.

The estimated award value ranges from $7.5 million to $50 million under a fixed-price "C" type contract using competitive procurement. Performance takes place at Port Hueneme, California. Facilities clearance to the Secret level and personnel clearance to the Secret level are required. The contracting office is NSWCPHD (UIC N63394), with the requirement office at PHD-E03.

Forecast text

The Naval Surface Warfare Center, Port Hueneme Division (NSWC PHD) is required to procure the Deck and Hatch Assembly (Assy) for Vertical Launching System (VLS). Deck and Hatch Assembly is the upper part of a MK 41 VLS module which contains eight (8) Cell Hatches and one (1) Uptake Hatch along with the mechanical parts necessary to open them. Deck and hatches assembly is a safety critical component of MK 41 Vertical Launch System (VLS). When MK 41 VLS is installed in the combatant, Deck and Hatch Assembly becomes a part of ship structure. It also includes the Module Deluge System to mitigate hazards in the Module in the event of a mishap. It contains the framework necessary to attach to other MK 41 VLS module components (uptake sections and plenum) which must be precisely aligned.

On GovTribe

Work this forecast

  • Track it in your pipeline
  • Find teaming partners
  • Similar forecasts
  • Ask GovTribe AI about this forecast