24636393: FY27 CPOP Repair Base Alameda Fire Alarm System Phase 1
Forecast New Requirement Updated
- Agency
-
Coast Guard
Department of Homeland Security
- Solicitation expected
- Estimated value
- $2,000,000 to $5,000,000
- Set-aside
- Service-Disabled Veteran-Owned Small Business
Forecast facts
- Anticipated award
- Through
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- Place of performance
- Alameda, CA
- Forecast number
- F2026074920
- Points of contact
-
- Tony Flores tony.l.flores@uscg.mil (571) 607-1071
Forecast details come from DHS's Acquisition Planning Forecast System. Agencies' dates and values are estimates.
About this forecast
The U.S. Coast Guard is procuring phase one of a three-phase fire alarm recapitalization at Coast Guard Base Alameda under a Service-Disabled Veteran-Owned Small Business set-aside, with solicitation release targeted for June 1, 2027 and award anticipated by July 1, 2027. The contractor shall provide all labor, materials, and equipment to remove obsolete fire alarm systems and to design, install, test, and commission a unified addressable fire detection, alarm, and notification system with modern notification devices and control unit integration in Historic District Buildings 3, 14, 15, 16, 18, 21, and 22. The requirement falls under NAICS 237990, Other Heavy and Civil Engineering Construction, and is sponsored by the Department of Homeland Security.
The estimated award value ranges from $2 million to $5 million under a firm fixed-price contract through the Design/Build Construction Services II (Regional) (RMACC II) vehicle, with performance scheduled from July 1, 2027 through September 30, 2027 at Coast Guard Base Alameda, California. CEU Oakland serves as the contracting and requirements office, with Tony Flores, Contracting Specialist/Officer, as the primary point of contact at tony.l.flores@uscg.mil or (571) 607-1071. Samantha Watts serves as the small business coordinator at samantha.c.watts1@uscg.mil or (571) 607-1651.
Forecast text
The Contractor shall provide all labor, materials, and equipment required for phase one of a three-phase campus-wide fire alarm recapitalization at Base Alameda. Work includes the complete removal of obsolete, disparate fire alarm systems and the design, installation, testing, and commissioning of a standardized, unified addressable fire detection, alarm, and notification system in Historic District Buildings 3, 14, 15, 16, 18, 21, and 22. The system shall include modern notification devices and full integration into a newly installed, modern control unit.
On GovTribe
Work this forecast
- Track it in your pipeline
- Find teaming partners
- Similar forecasts
- Ask GovTribe AI about this forecast