WRNF Culvert Replacement

Closed Solicitation Posted

Solicitation number
1282D719R0010
Agency
Region 2 - Rocky Mountain Region Forest Service, Department of Agriculture
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
237990 Other Heavy and Civil Engineering Construction
PSC
Not on record
Place of performance
Location: The East Brush Creek culvert is located on the Eagle/Holy Cross District on the White River National Forest approximately 15 miles south of Eagle, CO on National Forest System Road 415. Eagle, Colorado 81631, United States

Notice details come from SAM.gov. Updated .

Notice text

3 versions

Update #3 · Latest ·

New Bid Closing Date
Date: August 19th, 2019
Time: 5:00pm MST
Rev. 7/24/19
Pre-Bid Meeting Date
Date: August 2nd, 2019
Time: 10:00am
Location: Holy Cross Ranger District
24747 US Hwy 24
Minturn, CO 81645
East Brush Creek Culvert Replacement
Purpose: The intent of the project is to replace undersized culverts on National Forest System Roads with aquatic organism passages for the purposes of habitat restoration, flood capacity and resiliency, road reconstruction, and to upgrade aging infrastructure to current forest standards.

Scope of Work: The work shall consist of what is shown on the plans and stated in the specifications for East Brush Creek Road. Work includes, but is not limited to: traffic control signs, install stream flow diversion system at existing culvert, remove existing culvert, excavation, construction or placement of footings, construction of stream channel and banks, erect plate box culvert, structural backfill and embankment, surface aggregate placement, seeding, planting, and final site work.


Period of Performance: East Brush Creek shall be completed during the in-stream construction window of August 1 - October 15. This site shall be completed in its entirety during one construction season. Construction is anticipated for the 2020 construction season. The contract shall be completed by November 30, 2020.


Award Determination: Shall be selected on Best Overall Value to the Government as specified in Section M.


Type of Contract: Fixed-Price Construction Contract: Payment will be made on actual work performed unless otherwise noted.

.

Update #2 ·

Rev. 7/24/19
Pre-Bid Meeting Date
Date: August 2nd, 2019
Time: 10:00am
Location: Holy Cross Ranger District
24747 US Hwy 24
Minturn, CO 81645
East Brush Creek Culvert Replacement
Purpose: The intent of the project is to replace undersized culverts on National Forest System Roads with aquatic organism passages for the purposes of habitat restoration, flood capacity and resiliency, road reconstruction, and to upgrade aging infrastructure to current forest standards.

Scope of Work: The work shall consist of what is shown on the plans and stated in the specifications for East Brush Creek Road. Work includes, but is not limited to: traffic control signs, install stream flow diversion system at existing culvert, remove existing culvert, excavation, construction or placement of footings, construction of stream channel and banks, erect plate box culvert, structural backfill and embankment, surface aggregate placement, seeding, planting, and final site work.


Period of Performance: East Brush Creek shall be completed during the in-stream construction window of August 1 - October 15. This site shall be completed in its entirety during one construction season. Construction is anticipated for the 2020 construction season. The contract shall be completed by November 30, 2020.


Award Determination: Shall be selected on Best Overall Value to the Government as specified in Section M.


Type of Contract: Fixed-Price Construction Contract: Payment will be made on actual work performed unless otherwise noted.

.

Update #1 ·

East Brush Creek Culvert Replacement
Purpose: The intent of the project is to replace undersized culverts on National Forest System Roads with aquatic organism passages for the purposes of habitat restoration, flood capacity and resiliency, road reconstruction, and to upgrade aging infrastructure to current forest standards.

Scope of Work: The work shall consist of what is shown on the plans and stated in the specifications for East Brush Creek Road. Work includes, but is not limited to: traffic control signs, install stream flow diversion system at existing culvert, remove existing culvert, excavation, construction or placement of footings, construction of stream channel and banks, erect plate box culvert, structural backfill and embankment, surface aggregate placement, seeding, planting, and final site work.


Period of Performance: East Brush Creek shall be completed during the in-stream construction window of August 1 - October 15. This site shall be completed in its entirety during one construction season. Construction is anticipated for the 2020 construction season. The contract shall be completed by November 30, 2020.


Award Determination: Shall be selected on Best Overall Value to the Government as specified in Section M.


Type of Contract: Fixed-Price Construction Contract: Payment will be made on actual work performed unless otherwise noted.

.

Attachments

Files attached to this notice, newest first
File Type Posted
REV2_Upper_East_Brush_Statement_of_Work.pdf PDF
Bid_Bond_SF24.pdf PDF
Performance_Bond_SF25-16a.pdf PDF
East_Brush_Creek_Pre-Bid_QA.pdf PDF
Payment_Bond_SF25A-16a.pdf PDF
REV1_Upper_East_Brush_Statement_of_Work.pdf PDF
UpperEBrushPlans.pdf PDF
Upper_East_Brush_Statement_of_Work.pdf PDF
1282D719R0010.pdf PDF
UpperEBrushSection_Specificatons.pdf PDF
DavisBaconCO3_CO13.pdf PDF
Show all 11

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity