Windmill Water Pump and Install
Closed Pre-Solicitation Posted
- Solicitation number
- W912DQ24Q1028
- Agency
-
ENDIST Kansas City
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 221310 Water Supply and Irrigation Systems
- Place of performance
- Parkville, Missouri 64152, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The US Army Corps of Engineers Kansas City District is seeking suppliers for a windmill water pump and tower installation at the Parkville Bottoms Wetland Area in Parkville, Missouri. Vendors must provide a complete windmill, water pump, and tower sized to fit a 50-foot deep 5-inch well capable of pumping 400-500 gallons per hour. Quotes must include assembly and installation services within 90 days of order receipt. Interested parties should email primary point of contact Seth Balsters by February 13, 2024.
This total small business set-aside opportunity has an estimated components list including a 10-foot windmill head, 27-foot tower and footings, 3-foot cylinder pump, well drop pipe and sucker rod, and required flanges. No current contractors or award values were provided, however the location details and timelines indicate this is a single installation project.
Notice text
Sources Sought
The US Army Corp of Engineers (USACE) Kansas City District is in need of suppliers for a Windmill Water Pump and Tower at the Parkville Bottoms Wetland Area.
Vendor’s price shall include windmill, water pump, and tower, delivery and installation. Timeline is 90 days after receipt of order. Location is Parkville Bottoms Wetland Area, Parkville, MO at Well #2, Latitude 39.185278⁰ Longitude -94.694139⁰.
Following Specifications:
- Complete windmill water pump and tower (all components for fully operational windmill pump)
- Must be sized to fit a 5” well, which will be 50’ deep with an average groundwater depth of 20’
- Maximum production should be approximately 400-500GPH
- Quotes must include assembly and installation
Estimated Components:
- 10’ windmill head (complete)
- 27’ tower and footings (if required)
- 3’ cylinder pump with foot valve and screen
- Well drop pipe - 1 1/4" galvanized pipe and 7/16" sucker rod and fittings and couplings
- Well flange and fittings 5" well flange for casing and 1 1/4" flange for pipe
Would you please email primary POC, Mr. Seth Balsters at seth.b.balsters@usace.army.mil, your company's information.
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity