4 versions

Update #4 · Latest ·

Added: Mar 17, 2011 6:15 pm Modified: May 25, 2011 12:35 pmTrack Changes Amendment No. 2 is now been posted at www.fedconnect.net.

The work to be done includes all labor, supervision, transportation, equipment, tools, supplies, and materials necessary to install two open bottom structures, two 18 inches CMP, improve drainage, place crushed aggregate and construct two bridges on West Fork Illinois Road. The work includes de-watering the site; excavation of road prism; relocation of utilities; installing Pre-Engineered/ Pre-Fabricated Bridges/Open bottom culverts with interlocking wingwalls, placing backfill; furnishing, hauling and placement of select borrow, riprap, and base aggregate and other related site work; furnishing and installing temporary gate or providing access road through bridge sites for homeowner. Project price range is between $100,000 and $250,000. NAICS: 237310. Project site located at Josephine County, Grants Pass Field Office, Medford District, Oregon. Estimated start work is June 6, 2011 and performance time is 60 calendar days. Bonds are required - Bid Bond: 20%; Performance Bond: 100%; and Payment Bond: 100%. This solicitation will be posted electronically at www.fedconnect.net. Paper copies are no longer available. All responsible sources may submit an offer which will be considered.

Update #3 ·

Added: Mar 17, 2011 6:15 pm Modified: May 20, 2011 4:24 pmTrack Changes Amendment No. 1 is now been posted at www.fedconnect.net.

The work to be done includes all labor, supervision, transportation, equipment, tools, supplies, and materials necessary to install two open bottom structures, two 18 inches CMP, improve drainage, place crushed aggregate and construct two bridges on West Fork Illinois Road. The work includes de-watering the site; excavation of road prism; relocation of utilities; installing Pre-Engineered/ Pre-Fabricated Bridges/Open bottom culverts with interlocking wingwalls, placing backfill; furnishing, hauling and placement of select borrow, riprap, and base aggregate and other related site work; furnishing and installing temporary gate or providing access road through bridge sites for homeowner. Project price range is between $100,000 and $250,000. NAICS: 237310. Project site located at Josephine County, Grants Pass Field Office, Medford District, Oregon. Estimated start work is June 6, 2011 and performance time is 60 calendar days. Bonds are required - Bid Bond: 20%; Performance Bond: 100%; and Payment Bond: 100%. This solicitation will be posted electronically at www.fedconnect.net. Paper copies are no longer available. All responsible sources may submit an offer which will be considered.

Update #2 ·

Added: Mar 17, 2011 6:15 pm Modified: Apr 27, 2011 3:12 pmTrack Changes The solicitation has now been posted at www.fedconnect.net.

The work to be done includes all labor, supervision, transportation, equipment, tools, supplies, and materials necessary to install two open bottom structures, two 18 inches CMP, improve drainage, place crushed aggregate and construct two bridges on West Fork Illinois Road. The work includes de-watering the site; excavation of road prism; relocation of utilities; installing Pre-Engineered/ Pre-Fabricated Bridges/Open bottom culverts with interlocking wingwalls, placing backfill; furnishing, hauling and placement of select borrow, riprap, and base aggregate and other related site work; furnishing and installing temporary gate or providing access road through bridge sites for homeowner. Project price range is between $100,000 and $250,000. NAICS: 237310. Project site located at Josephine County, Grants Pass Field Office, Medford District, Oregon. Estimated start work is June 6, 2011 and performance time is 60 calendar days. Bonds are required - Bid Bond: 20%; Performance Bond: 100%; and Payment Bond: 100%. This solicitation will be posted electronically at www.fedconnect.net. Paper copies are no longer available. All responsible sources may submit an offer which will be considered.

Update #1 ·

Added: Mar 17, 2011 6:15 pm The work to be done includes all labor, supervision, transportation, equipment, tools, supplies, and materials necessary to install two open bottom structures, two 18 inches CMP, improve drainage, place crushed aggregate and construct two bridges on West Fork Illinois Road. The work includes de-watering the site; excavation of road prism; relocation of utilities; installing Pre-Engineered/ Pre-Fabricated Bridges/Open bottom culverts with interlocking wingwalls, placing backfill; furnishing, hauling and placement of select borrow, riprap, and base aggregate and other related site work; furnishing and installing temporary gate or providing access road through bridge sites for homeowner. Project price range is between $100,000 and $250,000. NAICS: 237310. Project site located at Josephine County, Grants Pass Field Office, Medford District, Oregon. Estimated start work is May 15, 2011 and performance time is 60 calendar days. Bonds are required - Bid Bond: 20%; Performance Bond: 100%; and Payment Bond: 100%. This solicitation will be posted electronically at www.fedconnect.net. Paper copies are no longer available. Estimated issue date is April 1, 2011. All responsible sources may submit an offer which will be considered.

Notice history

Notice Type Posted
West FK illinois road bridge project Latest Award Notice
This notice Original Award Notice

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity