Water canyon road repairs
Award Notice Posted
- Solicitation number
- 140L5719R0002
- Agency
-
Utah Region
Bureau of Land Management, Department of the Interior
- Awarded
- to Academy Consulting LLC
- Set-aside
- Total Small Business
Opportunity facts
- Contract number
- 140L5719C0004 Federal contract award
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- PSC
- Not on record
Notice details come from SAM.gov. Updated .
Notice text
4 versions
Update #4 · Latest ·
WATER CANYON ROAD REPAIRS
. Awarded Vendors: ACADEMY CONSULTING, LLC
405 EXECUTIVE DR
LANGHORNE
PA
19047-8003
US. Contract Award Dollar Amount: $190,576.00. Contract Award Date: 2019-06-05.
Update #3 ·
WATER CANYON ROAD REPAIRS
The Bureau of Land Management (BLM) intends to award a single, firm-fixed price contract for the Water Canyon Road Repairs. The work to be done includes all labor, supervision, permits, transportation, equipment, tools, supplies, and materials necessary to construct and make improvements on Water Canyon Road as shown in the Plans and detailed in the Special Contract Requirements (attached). This work consists of grading and surfacing of the road, installation of a low water crossing, culverts, grade dips, linear ditches, lead off ditches, armoring and related site work.
The work is located approximately 1 mile by road northeast of Hildale, Utah. The latitude and longitude of the start of the project is approximately 37°01'31"N and 112°57'14"W. The Contractor shall be responsible for providing visitor use access to Water Canyon Recreation area to the greatest extent possible. The Contractor shall coordinate a temporary traffic control plan with the Contracting Officer prior to the start of construction. The contract period of performance is 60 calendar days from notice to proceed.
A site visit will be held on May 14, 2019 at 3:00 pm MT at the Squirrel Canyon Trailhead. Detailed instructions are attached.
This project is 100% set aside for small business vendors under the North American Industrial Classification System (NAICS) code 237310 with a small business size standard of $36.5 million, average annual gross receipts for the past three years.
To obtain the solicitation and/or amendments/updates for this project, contractors shall monitor the solicitation at www.fedconnect.net. Interested parties shall periodically check for amendments and other changes to the solicitation documents. This service is provided for convenience only and does not serve as a guaranteed notification. Subscribers to this service are ultimately responsible for reviewing this site for all information relevant to this solicitation.
In accordance with FAR 36.204, the estimated magnitude of this construction project is between $100,000 and $250,000. Performance and payment bonds are required for all construction contracts exceeding $150,000.
To be considered eligible for award, vendors must be registered and have active profiles with completed representations and certifications in the System for Award Management (SAM) database (https://www.sam.gov). There is NO fee to register for this site.
Any correspondence concerning this requirement shall reference 140L5719R0002 - Water Canyon Road Repairs in the subject line and shall be sent to the Contracting Officer: Leslie Gunn at lgunn@blm.gov.
.
Update #2 ·
WATER CANYON ROAD REPAIRS
The Bureau of Land Management (BLM) intends to award a single, firm-fixed price contract for the Water Canyon Road Repairs. The work to be done includes all labor, supervision, permits, transportation, equipment, tools, supplies, and materials necessary to construct and make improvements on Water Canyon Road as shown in the Plans and detailed in the Special Contract Requirements (attached). This work consists of grading and surfacing of the road, installation of a low water crossing, culverts, grade dips, linear ditches, lead off ditches, armoring and related site work.
The work is located approximately 1 mile by road northeast of Hildale, Utah. The latitude and longitude of the start of the project is approximately 37°01'31"N and 112°57'14"W. The Contractor shall be responsible for providing visitor use access to Water Canyon Recreation area to the greatest extent possible. The Contractor shall coordinate a temporary traffic control plan with the Contracting Officer prior to the start of construction. The contract period of performance is 60 calendar days from notice to proceed.
A site visit will be held on May 14, 2019 at 3:00 pm MT at the Squirrel Canyon Trailhead. Detailed instructions are attached.
This project is 100% set aside for small business vendors under the North American Industrial Classification System (NAICS) code 237310 with a small business size standard of $36.5 million, average annual gross receipts for the past three years.
To obtain the solicitation and/or amendments/updates for this project, contractors shall monitor the solicitation at www.fedconnect.net. Interested parties shall periodically check for amendments and other changes to the solicitation documents. This service is provided for convenience only and does not serve as a guaranteed notification. Subscribers to this service are ultimately responsible for reviewing this site for all information relevant to this solicitation.
In accordance with FAR 36.204, the estimated magnitude of this construction project is between $100,000 and $250,000. Performance and payment bonds are required for all construction contracts exceeding $150,000.
To be considered eligible for award, vendors must be registered and have active profiles with completed representations and certifications in the System for Award Management (SAM) database (https://www.sam.gov). There is NO fee to register for this site.
Any correspondence concerning this requirement shall reference 140L5719R0002 - Water Canyon Road Repairs in the subject line and shall be sent to the Contracting Officer: Leslie Gunn at lgunn@blm.gov.
.
Update #1 ·
WATER CANYON ROAD REPAIRS
The Bureau of Land Management (BLM) intends to award a single, firm-fixed price contract for the Water Canyon Road Repairs. The work to be done includes all labor, supervision, permits, transportation, equipment, tools, supplies, and materials necessary to construct and make improvements on Water Canyon Road as shown in the Plans and detailed in the Special Contract Requirements (attached). This work consists of grading and surfacing of the road, installation of a low water crossing, culverts, grade dips, linear ditches, lead off ditches, armoring and related site work.
The work is located approximately 1 mile by road northeast of Hildale, Utah. The latitude and longitude of the start of the project is approximately 37°01'31"N and 112°57'14"W. The Contractor shall be responsible for providing visitor use access to Water Canyon Recreation area to the greatest extent possible. The Contractor shall coordinate a temporary traffic control plan with the Contracting Officer prior to the start of construction. The contract period of performance is 60 calendar days from notice to proceed.
A site visit will be held on May 14, 2019 at 3:00 pm MT at the Squirrel Canyon Trailhead. Detailed instructions are attached.
This project will be 100% set aside for small business vendors under the North American Industrial Classification System (NAICS) code 237310 with a small business size standard of $36.5 million, average annual gross receipts for the past three years.
Request for Proposal (RFP) under solicitation number 140L5719R0002, will be posted electronically at www.fedconnect.net on or about May 9, 2019, with solicitation closing date approximately 2 weeks later. These dates are subject to change. To obtain the solicitation and/or amendments/updates for this project, contractors shall monitor the solicitation at www.fedconnect.net. Interested parties shall periodically check for amendments and other changes to the solicitation documents. This service is provided for convenience only and does not serve as a guaranteed notification. Subscribers to this service are ultimately responsible for reviewing this site for all information relevant to this solicitation.
In accordance with FAR 36.204, the estimated magnitude of this construction project is between $100,000 and $250,000. Performance and payment bonds are required for all construction contracts exceeding $150,000.
To be considered eligible for award, vendors must be registered and have active profiles with completed representations and certifications in the System for Award Management (SAM) database (https://www.sam.gov). There is NO fee to register for this site.
Any correspondence concerning this requirement shall reference 140L5719R0002 - Water Canyon Road Repairs in the subject line and shall be sent to the Contracting Officer: Leslie Gunn at lgunn@blm.gov.
.
Files
| File | Type | Posted |
|---|---|---|
| FedConnect File | — |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity