Special Operations Facility (SOF) Operations Additions, Fort Bragg, NC

Awarded Award Notice Posted

Solicitation number
W912HN-10-R-0042
Agency
ENDIST Savannah US Army Corps of Engineers, Department of Defense
Awarded
to Sauer Construction, LLC
Set-aside
No set-aside

Opportunity facts

Contract number
W912HN11C0010 Federal contract award
NAICS code
236220 Commercial and Institutional Building Construction
PSC
Not on record
Place of performance
Usace District, Savannah P.O. Box 889, Savannah GA 31402 US

Notice details come from SAM.gov. Updated .

Notice text

2 versions

Update #2 · Latest ·

Added: Nov 12, 2010 12:29 pm Modified: Dec 14, 2010 4:11 pmTrack Changes One Phase Design-Bid-Build, Special Operations Facility (SOF)
Operations Additions at
Fort Bragg, North Carolina
Technical Questions: Mr. Steve Welch, 912-652-5657
Contractual Questions: Mr. Jose A. Cruz, 912-652-5108

NOTE: Any prospective Offeror interested in obtaining plans and specifications for this solicitation must register on our website at https://www.fedteds.gov/. Contractors may view and/or download this solicitation and all amendments from the Internet after solicitation issuance.

Description of work: This is a design-Bid-build (100% Fully Design) SOF Operations Additions MILCON Project for the construction of two single-story and one new two-story rigid steel frame, block and brick facility additions on Building M. The total amount of additional square footage to be added to the building equals 33,032 SF. In addition, there is a total of 47,011 SF in renovation planned to Building M. With both the additions and renovations the total project includes site improvements, utilities, mechanical, plumbing and electrical upgrades, force protection, intrusion detection, fire detection/ protection systems, communications systems, energy management control integrated to match the local system, public address system, arms vaults IAW AR 190-1, latrines, showers, team rooms, offices, storage, dining facility seating area, physical therapy area with handicap parking spaces, strength training area, storm water and erosion control measures. Special construction includes sustainable construction features complying with Leadership in Energy and Environmental Design (LEED) "Silver ", renovation/expansion work within an existing Sensitive Compartment Information Facility (SCIF) area, and all construction will occur within a high security-controlled area, (A high security control area is defined as an area requiring armed security guard escort at all times, perimeter intrusion detection or access control measures, contractor personnel require identification badges and are subject to random searches of vehicles, equipment and personnel.)

The mechanical systems for this project consist of the following:

New modular indoor and rooftop air handling units for the DFAC Addition, Gym and HRT Locker Addition, and the CDD/SIGNAL Infill and Base Station Expansion.

New "In-Row" chilled water computer room air conditioning (CRAC) units for the new Base Station Server and Server A rooms.

Replacement air handling unit's four (4) totals for air handlers serving the existing DFAC, Gym and INTEL areas.

A new modular rooftop air handling unit to replace the existing indoor air handler serving the lower level of the SIGNAL wing.

Chilled and heating water shall be provided by the existing chilled water central plant. New domestic water heater to compensate for new additions and existing shortages. Includes a new primary heating pump to supply heating water to the domestic water heating system.


Options may be included in the contract.

This project will be solicited on an unrestricted basis pursuant to the Business Opportunity Development Reform Act of 1988 with a hub-zone evaluation preference utilizing a One Phase Design-Bid- Build Request for Proposals. The Government will use a best value Performance Price Trade-off (PPT) evaluation process in accordance with Federal Acquisition Regulation (FAR) part 15.101-1. Offeror's are required to submit a price and technical proposal. Each proposal shall contain the offeror's best technical proposal and best price. Price will not be scored, but will be a factor in establishing the competitive range prior to discussions (if held) and in making the final best value determination for award. All non-cost factors, when combined, are significantly more important than price. Offeror's are reminded to carefully review solicitation documents once issued, to include all evaluation criteria, as criteria as stated in the solicitation shall govern.

The estimated magnitude of this project is between $15,000,000.00 and $25,000,000.00. This solicitation will be issued in electronic format only. It will be available on or about January 2011 on the Internet at https://www.fedteds.gov. Notification of amendments will be through use of the Internet. No additional media (CD-ROM, floppy disks, faxes, etc.) will be provided. It is the Offeror's responsibility to check the Internet address provided as necessary for any posted changes to this solicitation and all amendments. For additional information or assistance, please contact Jose A. Cruz, Contract Specialist (912) 652-5108 or via e-mail at jose.a.cruz@usace.army.mil
Technical Questions: Mr. Steve Welch (912) 652-5657

Update #1 ·

Added: Nov 12, 2010 12:29 pm This is a Sources Sought advertisement only. No solicitation exists at this time. The US Army Corps of Engineers, Savannah District is seeking interested 8(a) Certified Firms with an office located within Region IV (GA, AL, NC, TN, MS, FL, KY, and SC) which have 236220 among their approved NAICS Codes. The proposed facility is at Fort Bragg, NC.

Description: This is a design-Bid-build SOF MILCON Project for the construction of two single-story and one new two-story rigid steel frame, block and brick facility additions on Building M. The total amount of additional square footage to be added to the building equals 33,032 SF. In addition, there is a total of 47,011 SF in renovation planned to building M. With both the additions and renovations the total project includes site improvements, utilities, mechanical, plumbing and electrical upgrades, force protection, intrusion detection, fire detection/protection systems, communications systems, energy management control integrated to match the local system, public address system, arms vaults IAW AR 190-1, latrines, showers, team rooms, offices, storage, dining facility seating area, physical therapy area with handicap parking spaces, strength training area, storm water and erosion control measures. Special construction includes sustainable construction features complying with Leadership in Energy and Environmental Design (LEED) Silver. This project will require an emergency generator modification and housing, oil fired boiler modification, chiller modification and upgrade of existing transformers switchgear. Air conditioning is estimated at 350 kW (100 tons).

All interested contractors have until 23 November 2010 at 2:00 PM (Eastern) to submit your companys business size, evidence of capabilities and experience in the criteria above, and bonding capabilities in accordance with FAR 28.1. All submittals should be mailed to:

The U.S. Army Corps of Engineers, Savannah District
Attn: CECT-SAS-E/ Jose A. Cruz
100 W. Oglethorpe Avenue
Savannah, GA 31401-3640


POC: Jose A. Cruz, Contract Specialist
Phone: (912) 652-5801
jose.a.cruz@usace.army.mil





Attachments

Files attached to this notice, newest first
File Type Posted
W912HN_10_R_0042_V2.zip ZIP file
vol1.pdf PDF
W912HN_10_R_0042_V3.zip ZIP file
W912HN_10_R_0042_V4.zip ZIP file
vol2.pdf PDF
W912HN_10_R_0042_V1.zip ZIP file
vol3.pdf PDF

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity