vol1.pdf
PDF 4 MB Posted
- Attached to
- Special Operations Facility (SOF) Operations Additions, Fort Bragg, NC Federal contract opportunity
- Solicitation number
- W912HN-10-R-0042
About this file
W912HN-10-R-0042 SPECS VOL1
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912HN_10_R_0042_V1.zip | ZIP file | |
| vol3.pdf | ||
| W912HN_10_R_0042_V2.zip | ZIP file | |
| W912HN_10_R_0042_V3.zip | ZIP file | |
| W912HN_10_R_0042_V4.zip | ZIP file | |
| vol2.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Fort Bragg North Carolina
Solicitation Number
W912HN-10-R-0042
SOF Operations Addition
FY 11, PN 64484
Volume 1 of 3 – Sections 00010 through 00800 and Technical Provisions - Divisions 01 through 06 January 2011
THIS SOLICITATION IS UNRESTRICTED PURSUANT TO THE
"BUSINESS OPPORTUNITY DEVELOPMENT REFORM ACT OF 1988"
(PUBLIC LAW 100-656)
U.S. ARMY ENGINEER DISTRICT, SAVANNAH
CORPS OF ENGINEERS
100 WEST OGLETHORPE AVENUE
SAVANNAH, GEORGIA 31401-3640
US Army Corps of Engineers Savannah District
Request for proposal is for 100 % fully Design-Bid-Build construction of Speial Operations Facility (SOF FY-11) Operations Additions at Fort Bragg, NC
This project is Unrestricted
The estimated Magnitude of this contract is $15,000,000.00 to $25,000,000.00
The proposal of the successful Offeror shall be considered incorporated by reference upon aw ard of contract.
FAR Clause 52.232-18 entitled availability of funds applies.
JOSE A CRUZ 912-652-5801
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
19-Jan-2011
(RFP)
(IFB)
X
CALL:
SOF Operations Additions, Ft. Bragg, NC
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________1020 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________Section 00800
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________6 copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________23 Feb 2011 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
U.S. ARMY ENGINEER DISTRICT, SAVANNAH
100 WEST OGLETHORPE AVE
SAVANNAH GA 31401-3640
W912HN
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
02:00 PM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
64484, FY11
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX:TEL: TEL: FAX:
W912HN-10-R-0042 198
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
Section 00010 - Solicitation Contract Form
SCHEDULE B
SOF Operations Additions
Building 0-1900-M; PN 64484 Fort Bragg, NC
TOTAL BASE
(Clin 0001- 0001AC) $_____________________
TOTAL OPTIONS
(Clins 0002 thru 0005AB) $_____________________
TOTAL BASE PLUS OPTIONS
(Clins 0001 thru 0005AB) $_____________________
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 XXXX XXXX
BASE BID ITEM
FOR INFORMATIONAL PURPOSES ONLY - Construction of the SOF Operations Additions, Building 0-1900-M, Complete to the 5 foot building line.
0001AA 1 Lump Sum XXXX
BASE BID ITEM (NEW WORK)
Addition to Gymnasium
0001AB 1 Lump Sum XXXX
BASE BID ITEM (RENOVATION)
Renovations to Gymnasium
0001AC 1 Lump Sum XXXX
BASE BID ITEM
Site Preparation and Site development including utilities, clearing, grading, seeding, paving, landscaping, site furnishing, etc. for Gymnasium Complete outside the 5 foot line.
0002 XXXX XXXX
BID OPTION 1
FOR INFORMATIONAL PURPOSES ONLY - Construction of Dining Facility.
0002AA 1 Lump Sum XXXX
BID OPTION 1 (NEW WORK)
Construction of Dining Facility
0002AB 1 Lump Sum XXXX
BID OPTION 1 (RENOVATION)
Construction of Dining Facility
0002AC 1 Lump Sum XXXX
BID OPTION 1
Site Preparation and Site development including utilities, clearing, grading, seeding, paving, landscaping, site furnishing, etc. for Dining Facility Addition.
0003 1 Lump Sum XXXX
BID OPTION 2 (RENOVATION)
Construction of INTEL Area. See Note # 6
0004 XXXX XXXX
BID OPTION 3
FOR INFORMATIONAL PURPOSES ONLY - Construction of CDD Infill/Signal Area
0004AA 1 Lump Sum XXXX
BID OPTION 3 (NEW WORK)
Construction of CDD Infill Area/Signal Area.
0004AB 1 Lump Sum XXXX
BID OPTION 3
Site Preparation and Site development including utilities, clearing, grading, seeding, paving, landscaping, site furnishing, etc. for CDD Infill Area/Signal Area.
0005 XXXX XXXX
BID OPTION 4
FOR INFORMATIONAL PURPOSES ONLY - Construction of Tank Room.
0005AA 1 Lump Sum XXXX
BID OPTION 4 (NEW WORK)
Construction of Tank Room Area.
0005AB 1 Lump Sum XXXX
BID OPTION 4 (NEW WORK)
Site Preparation and Site development including utilities, clearing, grading, seeding, paving, landscaping, site furnishing, etc. for Tank Room Area, NOTES FOR CONTRACT LINE ITEM (CLIN) SCHEDULE
NOTE NO. 1. To better facilitate the receipt and proposal process, all modifications to proposals are to be submitted on copies of the latest Contract Line Item (CLIN) schedules as published in the solicitation or the latest amendment thereto. In lieu of indicating additions/deductions to line items, all Offerors shall state their revised prices for each item.
NOTE NO. 2. Offerors must insert a price on all numbered items of the CLIN Schedule. Failure to do so will disqualify the Offeror.
NOTE NO. 3. Contract performance time for the base bid is 1,020 calendar days after receipt of Notice to Proceed.
NOTE NO. 4. LIQUIDATED DAMAGES will be assessed at $1,915.54 per day.
NOTE NO. 5. At the option of the Government, the Government may require the Contractor to perform the work identified as Options 1 through 4, CLIN 0002, CLIN 0002AA, CLIN 0002AB, CLIN 0002ACCLIN 0003, CLIN 0004, CLIN 0004AA, CLIN 0004AB, CLIN 0005, CLIN
0005AA, CLIN 0005AB, at the price(s) stated in the CLIN Schedule. The Contracting Officer may exercise one or more of the Option(s) 1-4 upon award and/or by written notice to the Contractor within 120 calendar days after the date of the acknowledgment of the Notice to Proceed (NTP) by the Contractor. Exercise of the Option(s) shall be evidenced on Standard Form 30, citing this CLIN Schedule for the Firm-Fixed Price and FAR Clause 52.217-7 as the authority for exercising the Option. The Option shall be deemed exercised at the time the Government deposits the SF30 in the mail or, if earlier, at the time it is delivered to the Contractor. Contract Duration in Calendar Days for Option(s) exercised after Award; will not Exceed 1,020 Calendar Days from the date of Notice to Proceed (NTP) for the Base Bid.
NOTE NO. 6. For schedule planning purposes, work on Option 2, CLIN 0003, can not begin until 720 calendar days from Notice to Proceed (NTP) for the Base Bid. See FAR Clause 52.211-10.
SCOPE OF WORK
Description of work: This is a Design-Bid-Build (100% Fully Design) SOF Operations Additions MILCON Project for the construction of two single-story and one new two-story rigid steel frame, block and brick facility additions on Building M. The total amount of additional square footage to be added to the building equals 33,032 SF. In addition, there is a total of 47,011 SF in renovation planned to Building M. With both the additions and renovations the total project includes site improvements, utilities, mechanical, plumbing and electrical upgrades, force protection, intrusion detection, fire detection/ protection systems, communications systems, energy management control integrated to match the local system, public address system, arms vaults IAW AR 190-1, latrines, showers, team rooms, offices, storage, dining facility seating area, physical therapy area with handicap parking spaces, strength training area, storm water and erosion control measures. Special construction includes sustainable construction features complying with Leadership in Energy and Environmental Design (LEED) “Silver “, renovation/expansion work within an existing Sensitive Compartment Information Facility (SCIF) area, and all construction will occur within a high security-controlled area, (A high security control area is defined as an area requiring armed security guard escort at all times, perimeter intrusion detection or access control measures, contractor personnel require identification badges and are subject to random searches of vehicles, equipment and personnel.)
The mechanical systems for this project consist of the following:
New modular indoor and rooftop air handling units for the DFAC Addition, Gym and HRT Locker Addition, and the CDD/SIGNAL Infill and Base Station Expansion.
New “In-Row” chilled water computer room air conditioning (CRAC) units for the new Base Station Server and Server A rooms.
Replacement air handling unit’s four (4) totals for air handlers serving the existing DFAC, Gym and INTEL areas.
A new modular rooftop air handling unit to replace the existing indoor air handler serving the lower level of the SIGNAL wing.
Chilled and heating water shall be provided by the existing chilled water central plant. New domestic water heater to compensate for new additions and existing shortages. Includes a new primary heating pump to supply heating water to the domestic water heating system.
-------------------------------------------------------END OF SCOPE OF WORK---------------------------
BIDDER INQUIRY KEY
TECHNICAL MATTERS: Technical inquiries are to be submitted via Bidder Inquiry in ProjNet at www.projnet.org\projnet
All questions regarding this Request for Proposal (RFP) must be submitted in writing via Bidder Inquiry in ProjNet within no less than 10 calendar days prior to the date established in the RFP for receipt of proposals. The Government reserves the right to decline addressing questions received less than 10 calendar days prior to receipt of proposals.
If an Offeror believes that the requirements in this Request for Proposal contain an error, omission, or are otherwise unsound; the offeror shall immediately notify the Contract Specialist in writing with supporting rationale. The Offeror is reminded that the Government reserves the right to award this Request for Proposal based on the initial proposal, as received, without discussion.
To submit and review bid inquiry items, bidders will need to be a current registered user or self-register into system. To self-register go to web page, click BID tab select Bidder Inquiry, select agency USACE, enter Key for this solicitation listed below, and your e-mail address, click login.
Fill in all required information and click create user. Verify that information on next screen is correct and click continue.
From this page you may view all bidder inquiries or add inquiry.
Bidders will receive an acknowledgement of their question via email, followed by an answer to their question after it has been processed by our technical team.
W912HN-10-R-0042
SOF Operations Additions Fort Bragg, North Carolina PN64484 Bidder Inquiry Key VV741M-UP32XL
ADDITIONAL INFORMATION
MAILED PROPOSALS:
All proposals must be clearly identified with the contractor’s name and address. To ensure timely and proper handling, the lower left corner of the outermost wrapper should indicate the following:
Request For Proposal No: W912HN-10-R-0042 Due Date of Proposal: 23 February 2011 Time by which Proposals are Due: 2:00 P.M. (E.T.)
Title of Project: SOF OPERATIONS ADDITIONS, PN64484
The Government will not be responsible for proposals delivered to any location or to anyone other than those designated to receive proposals on its behalf as indicated below.
Proposals delivered by commercial carrier and those sent by U.S. Mail, including U.S. Express Mail, must be addressed as indicated below.
U.S. Army Engineer District, Savannah
ATTN: CECT-SAS-E (Jose A. Cruz) 100 West Oglethorpe Avenue Savannah, Georgia 31401-3640
Proposals sent by U.S. Mail or delivered by commercial carrier must be received by mailroom personnel on the first floor of 100 West Oglethorpe Avenue by the time specified in Block 13 of the SF 1442 for receipt of proposals.
Offerors are cautioned that proposals sent via United States Postal Service Express Mail are first delivered to the Savannah District Post Office Box instead of 100 West Oglethorpe Avenue, “the office designated for receipt of proposals” therefore, allow sufficient mailing time.
HAND CARRIED PROPOSALS ARE NOT AUTHORIZED.
FACSIMILE MODIFICATIONS OF PROPOSALS ARE NOT AUTHORIZED.
QUALITY CONTROL SYSTEM (QCS): Any contract award resulting from this solicitation will require the mandatory use of the automated Quality Control System. Please see Section 01 45 01 for additional information.
SECURITY REQUIREMENTS: Increased security at military installations may require vehicle and personnel registration, as well as 100% ID checks and random vehicle searches.
WORK SCHEDULING
Normal base work hours for the Contractor will be between the hours of 7:30 a.m. thru 4:00 p.m., excluding Saturdays, Sundays, and Federal Holidays. If the Contractor desires to work during periods other than above, he must notify the Contracting Officer three (3) working days in advance of his intention to work during other periods to allow assignment of additional inspection forces and for notification of fire, security and safety. When the Contracting Officer determines that they are reasonably available, he may authorize the Contractor to perform work during periods other than normal duty hours/days. However, if inspectors are required to perform in excess of their normal duty hours/days solely for the benefit of the Contractor, the actual cost of the inspection, at overtime rates, will be charged to the Contractor and will be deducted from the final payment of the Contract amount.
(Note: If applicable, at time of award this paragraph will be modified to the negotiated schedule for this project). The following Federal legal Holidays are observed by this Post:
New Year's Day 1 January Martin Luther's King's Birthday Third Monday of January President's Day Third Monday of February Memorial Day Last Monday of May Independence Day 4 July Labor Day First Monday in September Columbus Day Second Monday in October Veteran's Day 11 November Thanksgiving Day Fourth Thursday in November Christmas Day 25 December
NOTE: Any of the above holidays falling on a Saturday will be observed the preceding Friday, holidays falling on a Sunday will be observed on the following Monday.
Section 00100 - Bidding Schedule/Instructions to Bidders
SECTION 00100
SECTION 00100
PROPOSAL SUBMISSION REQUIREMENTS AND INSTRUCTIONS
1. OVERVIEW.
1.1 Scope of Work (See Section 00010)
1.2 The purpose of the Source Selection plan is to establish a uniform evaluation procedure for the technical evaluation of proposals by the Source Selection Evaluation Board (SSEB) and the development of the Best Value Decision by the Source Selection Authority (SSA) using the Trade-Off Process (See Federal Acquisition Regulation 15.101-1). In as much as the proposal shall describe the capability of the Offeror to perform the contract. The proposal should be specific and complete in every detail as well as be prepared simply and economically, providing a straightforward and concise description of capabilities to satisfactorily perform the contract.
1.3 For the purposes of this solicitation, the Government will utilize a Price Performance Trade-off (PPT) Process. In the PPT process, interested Offerors submit certain specified performance and capability proposals in conjunction with price proposals for review and consideration by the Government. The Government will evaluate these performance capability proposals in accordance with the criteria described herein.
2. GENERAL INSTRUCTIONS
2.1 RESERVED
2.2 Contractor Team Arrangements. Contractor Team Arrangements are considered an arrangement in which (1) two or more companies form a partnership or joint venture to act as a potential prime contractor; or (2) a potential prime contractor agrees with one or more other companies to have them act as its subcontractors under a specified Government contract or acquisition program. In accordance with FAR Subpart 9.6, the Government will recognize the integrity and validity of contractor team arrangements; provided, the arrangements are identified and company relationships are fully disclosed in the offer. The Offeror shall identify the major or critical aspects of the requirement to be performed by those identified in the Contractor Team Arrangement. The submission must contain a narrative that clearly explains the relevance to a particular factor of information concerning a company that is part of a Contractor Team Arrangement. The Government will consider the adequacy of this explanation in deciding the relevance of the information to this procurement.
2.3 If applicable, the Offeror shall submit evidence from the Offeror’s SBA Servicing Agency that the Offeror has notified and discussed the proposed joint venture for this project with the appropriate SBA personnel. For 8(a) set-aside procurements, all prospective Joint Ventures must comply with Title 13 Code of Federal Regulations (CFR) Part 124.513. For HUBZone set- aside procurements and awards to HUBZone SBCs through full and open competition after a price evaluation preference in favor of qualified HUBZone SBCs, a Joint Venture must comply with 13 CFR 126.616.
2.4 Notwithstanding the specific requirements of any other area of the RFP, information submitted about any company other than the Offeror, whether a predecessor company, affiliated company, subsidiary
(including wholly owned subsidiaries), subcontractors that will perform major or critical aspects of this requirement, or other associated business, WILL NOT be evaluated for any factor unless the proposal contains a detailed narrative explaining why this submitted information is relevant to this acquisition.
The Government will consider the adequacy of this explanation in deciding the relevance and weight, if any, of the information to this procurement. Where information about a subcontractor is properly submitted and given significant weight during the evaluation, the failure of the Offeror to actually perform with that subcontractor may be grounds for termination for default.
2.5 Offerors shall submit their proposal to the address shown in Block 7 of Standard Form 1442.
2.6 Proposals are due no later than the time and date specified in Block 13 of Standard Form 1442.
3. GENERAL PROPOSAL FORMAT:
3.1 Title Page. Include the title of the solicitation, solicitation number, Offeror name, and date of the submittal.
3.2 Table of Contents. Each volume of the proposal shall contain a detailed table of contents. If more than one binder is used, the complete table of contents shall be included in each. Any materials submitted but not required by this solicitation (such as company brochures) shall be relegated to appendices.
3.3 Printed Matter Submissions. Written material shall be on 8 ½ x 11 inch paper printed in no less than a 10 pitch or 10 font. Page limitations, where specified in the RFP, shall be considered a maximum. Pages in excess of any specified limitation shall not be evaluated. A single 8 ½ x 11 inch sheet with written material on one side only shall constitute one page. However, if both sides of the sheet bear written material then this single sheet shall be counted as two pages.
3.4 Binders. Proposals shall be submitted in tabbed, three ring binders.
3.5 Number of Copies. Offerors shall submit an original of Volume I and an original of Volume II and six (6) hard copies of Volume II, and one (1) electronic copy (CD) with Volume II.
3.6 Tabs. Proposal shall be organized and tabbed as follows:
VOLUME I
TAB A – Standard Form 1442, completed and signed by authorized individual(s) of the Offeror. Offers submitted in the name of a Joint Venture must be signed in accordance with the terms and conditions specified in the joint venture agreement as evidenced in the proposal.
TAB B – Proposal Pricing Schedule, Section 00010—Schedule B.
TAB C - Section 00600 – Representations and Certifications.
TAB D – Proposal Data Sheet – See Attachment 1 provided at the end of this section. Offerors should ensure telephone number; fax number, e-mail address and DUNS number are all included. DUNS number will be used to access Contractor Performance Assessment Reporting System (CPARS) data.
Offerors should also provide any other assigned number that identifies them in the CPARS database. If a separate DUNS has been created for a joint venture (J-V) it must be submitted. A DUNS number shall also be provided for each company identified in any other proposed association of firms or Contractor Team Arrangement. The offeror should also submit their Tax ID number on the proposal data sheet.
TAB E – Teaming Agreement, if applicable. See paragraph 2.2. Note to 8(a)—SBA must approve a joint venture agreement prior to the award of an 8(a) contract on behalf of the joint venture. See paragraph 2.3.
TAB F - Bid Bond—submit in accordance with FAR clause 52.228-1, Bid Guarantee. This item is not rated. However, the Government will review the bid bond for legal sufficiency. Any bid bond found to be legally insufficient may render a proposal non-responsive and ineligible for award. Facsimile, photocopied or scanned bonds are not acceptable.
TAB G –Financial Information & Bonding Capability (e.g. past three (3) years financial statements, annual reports, Dun & Bradstreet Ratings and/or number, etc.) Provide a list of all current contracts held, total dollar value, award date, anticipated completion, performance and payment bond amount.
TAB H – Statement of Compliance - Reserved
TAB I – Subcontracting Plan – FOR LARGE BUSINESS OFFERORS ONLY. Subcontracting Plan shall be prepared in accordance with FAR 52.219-9, and SBA’s Electronic Subcontracting Reporting System (eSRS) located at http://esrs.gov . Instructions for completion of requisite forms, as well as guidance on coordinating and preparing for all compliance reviews by Federal agencies can be found at this website. Offerors are to ensure subcontractors agree to submit to ESRS. Savannah District’s assigned subcontracting goals are as reflected in Local Clause 52.219-4001, Subcontracting Plan for Small Business.
VOLUME II
TAB J – FACTOR 1 Corporate Relevant Specialized Experience
TAB K – FACTOR 2 Past Performances
TAB L – FACTOR 3 Summary Schedules
4. TAB J—FACTOR 1 – CORPORATE RELEVANT SPECIALIZED EXPERIENCE
4.1 SUBMISSION REQUIREMENTS.
4.1.1 The Offeror shall demonstrate recent, relevant experience on projects using Attachment 2 at the end of this section. Offerors may identify state and local government and private contracts that are similar to the Government’s requirements. If projects were Design-Bid –Build / or Design-Build, so identify them. If the Offeror is a joint venture, each firm shall provide information, demonstrating experience relevant to their role on this project. If any firm has multiple functions or divisions, limit the project examples to those performed by the division, unit or team member submitting the offer.
4.1.2 Projects must be deemed relevant to be considered for this procurement. Relevant projects are those projects which meet the minimum criteria specified in paragraph 4.1.2.1. Projects which do not meet the minimum criteria specified SHALL be deemed not relevant and shall not be considered further.
Relevant projects which meet some or all of the additional criteria specified in paragraph 4.1.2.2 may be given more weight by the Government in determining the appropriate rating. The Government will not consider multiple projects such as individual task orders combined to meet the criteria referenced in
4.1.2.1 below. Offerors are cautioned to focus experience submissions on projects wherein the Offeror or proposed team members played a significant role and to clearly define those roles.
4.1.2.1 Minimum Criteria:
4.1.2.1.1 Projects submitted by the Offeror should have a new construction / or renovation value of no less than $12M.
If project is a combination of new construction and renovation, cost break down is applicable: cost of new construction and cost of renovation equal to grand total no less than $12M.
4.1.2.1.2 New construction, renovation and addition or improvement to a multi-story facility.
4.1.2.1.3 Projects successfully completed, or substantially completed (fully designed and at least 50% construction progress completed) within five (5) years preceding the date of this Solicitation.
4.1.2.2 Additional Criteria:
4.1.2.2.1 Construction of a facility within high security-controlled area. A high security control area is defined as an area requiring armed security guard escort at all times, perimeter intrusion detection or access control measures, contractor personnel require identification badges and are subject to random searches of vehicles, equipment and personnel.
4.1.2.2.2 Construction or renovation or combination of both types of work at least 25,000 square feet of gross space or greater.
4.1.2.2.3 Construction of a Sensitive Compartment Information Facility (SCIF).
4.1.2.2.4 Construction of conference rooms with audio-visual conferencing capabilities.
4.1.2.2.5 Construction of consolidated administrative offices, operational and planning areas.
4.1.3 Offerors shall submit no more than eight (8) Project Information Sheets. Where a project was awarded as a task order or delivery order under an IDIQ type contract, Offerors are cautioned to submit information specific to the instant task or delivery order considered relevant to the requirements of this RFP rather than the umbrella contract. All projects shall be successfully completed, or substantially completed (fully designed and at least 50% construction progress completed) within five (5) years preceding the date of this Solicitation. As a minimum, the Project Information Sheets shall provide;
the Project Point of Contact with telephone number, role and function performed on project, significance of role to overall project, project description (title), scope, location, cost (of specific contract action), and date of completion or anticipated completion date and percent constructed as of the date of the solicitation. For purposes of this Request for Proposal, if the Offeror represents the combining of two or more companies in a Contract Team Arrangement as defined in paragraph 2.2 above, no more than eight
(8) total project examples may be submitted for the entire team. The experience of individuals will not be credited under this factor.
4.1.4 The Offeror may provide a supplemental narrative (not additional project lists), not to exceed two
(2) pages that clearly but concisely describes the extent of the Offeror’s recent, related experience in construction (Design-Bid-Build). At a minimum the narrative should address; (1) previous recent teaming experience with proposed team members, if any and (2) corporate experience that is not directly related to the specific projects above and how the experience is applicable to this project.
4.2 EVALUATION CRITERIA.
4.2.1 The Government will evaluate the extent of recent, related experience of the prime contractor and its team members, if any, in construction (Design-Bid-Build). Projects procured under indefinite or definite delivery or requirements type contracts will be evaluated on an individual task/delivery order basis.
Offerors are reminded the Government may view an Offeror’s role, or that of its team members, if any, as either a detriment or benefit, dependent upon the significance, if any, as either a detriment of benefit, dependent upon the significance, if any, of said roles and the clarity with which they are defined, regardless of project relevancy. It is solely up to the judgment of the Government to determine the importance of identified roles in the assessment of evaluation ratings. Where the Government views an Offeror’s role or that of its team members, if any, as not significant or as not clearly defined, the Government reserves the right to view this lack of involvement, or clarity, as a lack of demonstrated experience and a heightened element of risk which may impact an Offeror’s rating for this factor despite the relevancy of submitted project (s). Federal Government project experience WILL NOT be rated inherently more important than non-Federal Government project experience.
4.2.2 The Government reserves the right to verify the experience record of cited projects or other recent projects by reviewing the Corps of Engineers Construction Contractor (or Architect-Engineer) Appraisal Support System (CCASS), other DOD or Government appraisal systems or by contacting owners or references. The Government may check any or all cited references to verify supplied information.
4.2.3 The relevant experience of key personnel proposed for this project will not be evaluated or considered under this factor.
4.2.4 Offerors are cautioned that the Supplemental Narrative shall not exceed two (2) pages and that Government evaluators will review and evaluate only the information contained on the first two pages.
Similarly, the Government may consider previous teaming experience among the team members as value added. The more relevant the project through which this experience has been gained, the more consideration it may be given. The consideration and weight given to the supplemental narrative will be based on the extent and adequacy of the information provided in accordance with paragraph 4.1.4
4.2.5 If the Offeror is determined to have no recent, relevant experience IAW the submission requirements of this RFP, or if the Offeror’s role on recent, relevant projects is determined to be not significant, a determination will be made as to the risk this lack of experience presents to the Government and the Offeror will be given an appropriate rating for this factor.
5. TAB K—FACTOR 2 - PAST PERFORMANCE
5.1 SUBMISSION REQUIREMENTS:
5.1.1 Past performance refers to the quality of recent, relevant project experience from the owner’s perspective. The Offeror shall complete and provide a Past Performance Assessment Sheet (Attachment
3) on no more than eight (8) projects total; inclusive of team member submissions, if any. Projects submitted under this factor must first be deemed relevant in accordance with the minimum criteria specified in paragraph 4.1.2.1 and additional criteria in paragraph 4.1.2.2 before being evaluated for quality in accordance with the criteria specified in paragraph 5.3. Offerors are cautioned to focus past performance submissions on projects wherein the Offeror or proposed team member played a significant role and to clearly define those roles.
The Offeror shall provide clear and adequate information in response to the past performance elements identified on Attachment 3. Though not required, ideally project past performance information submitted under this factor would be on the same projects submitted for consideration under Factor 1. Individual project Past Performance Assessment Sheets shall not exceed five (5) pages. If any firm has multiple functions or divisions, limit the project examples to those performed by the division, unit or team member submitting the offer. The Government will call and confirm information provided by the offeror on the Past Performance Assessment Sheet with the points of contact, to the extent necessary to conduct a meaningful evaluation. The Government reserves the right to interview other individuals if the point of contact is not available.
5.1.2 Other Sources. The Government may contact sources other than those provided by the Offeror for information with respect to past performance. These other sources may include but are not limited to:
Past Performance Information Retrieval System (PPIRS), other Government sources, and telephone interviews with organizations or individuals familiar with the Offeror’s performance. CCASS ratings on all relevant projects submitted by the Offeror under factor Corporate Relevant Experience as well as up to five (5) additional CCASS ratings on recent, relevant projects in accordance with 5.2.3 and 4.1.2 will be considered.
5.1.3 The past performance of individuals will not be considered under this factor.
5.2 EVALUATION CRITERIA:
5.2.1 The Government will evaluate the Offeror's past performance using the sources available to it including but not limited to: the example projects identified by the Offeror and submitted on the Past Performance Assessment Sheets and any additional information received from references, CCASS or other sources. Offerors may be provided an opportunity to address any negative past performance information about which the Offeror has not previously had an opportunity to respond if such information is determined to present an impact on the rating to be assessed.
5.2.2 The Government will consider past performance of the prime construction contractor. If a firm has multiple functions or divisions, the Government will only evaluate the past performance of the unit or division submitting the offer. The Government may also consider the past performance information submitted on any other team member. However, in accordance with paragraphs 2.2 and 2.4, above, the consideration and weight given to past performance information concerning other than the prime contractor will be based on the extent of involvement of the team member in the project and the adequacy of the proposal in identifying and addressing such arrangements and roles. Past performance information submitted on a team member who does not perform a major or critical role on the project or whose role has not been clearly or adequately described as required will not be considered. Where the Government views an Offeror’s role, or that of its team members, if any, as not significant or as not clearly defined, the Government reserves the right to view this lack of involvement, or clarity, as a risk which may impact an Offeror’s rating for this factor despite the quality of recent, relevant past performance information.
5.2.3 The Government will consider recent, relevant projects that are successfully completed, or substantially completed (fully designed and at least 50% construction progress completed) within five (5) years preceding the date of the solicitation. To be deemed relevant, projects must comply with minimum criteria in paragraph 4.1.2.1. The Government will consider the currency and relevance of the information, source of the information, context of the data, and general trends in contractor performance.
The Government places higher value on projects for which successful performance can be validated by means other than the Offeror’s self-assessment such as through independent telephone interviews with points of contact identified in the proposal, CCASS or other agency performance databases, Offeror furnished references or personal knowledge. The Government places a higher value on projects which provided particularly difficult or unique challenges and the innovative methods the Offeror used to resolve problems successfully.
5.2.4 Offerors are cautioned that the submission of each Past Performance Assessment Sheet shall not exceed five (5) pages and that Government evaluators will review and evaluate only the information contained on the first five pages.
5.3 The Government will evaluate past performance based on the elements listed below:
5.3.1 Quality of Construction. The Government will evaluate all information available with respect to the quality of the actual construction undertaken and the standards of workmanship exhibited by the Offeror.
5.3.2 Timeliness of Performance. The Government will evaluate all information available with respect to the completion of projects within the scheduled completion times.
5.3.3 Customer Satisfaction. The Government will evaluate all information available with respect to customer satisfaction, cooperation with customers, and interaction on past projects.
5.3.4 Subcontractor Management. The Government will evaluate all information available with respect to effective management of subcontractors on past projects.
5.3.5 Safety. The Government will evaluate all information available with respect to the contractor’s safety program or efforts.
5.4 If the Government does not obtain past performance information for the projects identified by the Offeror and cannot establish a past performance record for the Offeror through other sources, past performance will be rated neither favorably nor unfavorably.
6. Reserved
7. TAB L—FACTOR 3 – SUMMARY SCHEDULE.
7.1 SUBMISSION REQUIREMENTS:
7.1.1 Offerors are advised that the required data listed below are a requirement of this factor.
7.1.2 Schedules or diagrams may be provided separately in a size that is easily read, but shall be bound and clearly labeled as Tab M.
7.1.3 The Offeror shall clearly state the total performance period proposed from the Notice to Proceed through turnover of the facility for use by the end user’s unrestricted use (BOD). This period shall be inclusive of all review period required by the Government and specified in Section 01330 SUBMITTAL PROCEDURES. Per Section 01330, show minimum of 30 days for government review and approval.
7.1.4 Detailed Summary Schedule: Submit a Construction Schedule with all areas clearly identified.
Provide descriptions and details indicating understanding permit requirements, long lead items and major equipment approvals. Provide knowledge and understanding how NC DENR permitting process will impact the construction schedule. The schedule for construction shall be task oriented, indicating dates by which milestones are to be achieved. The Offeror may use a critical path or other method of his/her choice; however, the schedules shall be graphically represented.
7.1.5 The Offeror shall also submit a narrative, not to exceed One (1) page, 12-pitch, and double-spaced, explaining how the schedules will be achieved and how phased construction will comply with the schedule.
7.2 EVALUATION CRITERIA:
7.2.1 Proposed Contract Duration: The duration is 1,020 calendar days. The Government may take into account how well the summary schedule supports the duration, as well as use other information, such as but not limited to independent judgment concerning logic, constraints and typical construction durations.
An offer which proposes contract duration shorter than the maximum allowed duration will not be accepted by the Government.
7.2.2 Summary schedule: The Government will evaluate the overall understanding of the construction process being used in this solicitation. All field overhead costs are to be included in the contract price for the full proposed contract duration. The Government will evaluate the schedule to assess the strength of understanding of the project scope. The schedule must reflect a single task oriented structure for construction.
8.EVALUATION STANDARDS. Evaluation factors will be rated using the following adjectival descriptions. Evaluators will apply the appropriate adjective to each factor rated. The evaluator’s narrative explanation must clearly establish that the Offeror’s submittal meets the definitions established below. As each factor is evaluated an assessment of Performance Risk will be made. Performance Risk relates to the assessment of an Offeror's present and past work and accomplishments to determine the Offeror's ability to successfully perform as required.
8.1 OUTSTANDING - No doubt exists that the Offeror will successfully perform the required effort based on their performance record. The proposal has exceptional merit and reflects an excellent approach which will clearly result in the superior attainment of all requirements and objectives. The proposal contains no significant weaknesses, deficiencies or disadvantages and presents very low risk that it will not be successful. This clearly achievable approach includes numerous advantageous characteristics of substance, and essentially no disadvantages, which can be expected to result in outstanding performance.
The risk of unsuccessful performance is very low as the proposal provides solutions which are unquestionably feasible and practical. These solutions are further considered very low risk in that they are exceptionally clear and precise, fully supported, and demonstrate a clear understanding of the requirements.
8.2 ABOVE AVERAGE - Little doubt exists that the Offeror will successfully perform the required effort based on their performance record. The proposal demonstrates a sound approach which is expected to meet all requirements and objectives and exceed some. Any weaknesses noted in the proposal are minor and should not seriously affect the Offeror’s performance and presents low risk that it will not be successful. This sound approach includes advantageous characteristics of substance, and few relatively minor disadvantages, which collectively can be expected to result in above average performance. The risk of unsuccessful performance is low as the proposal contains solutions which are considered feasible and practical. These solutions are further considered to reflect low risk in that they are clear and precise, reasonably supported, and demonstrate an understanding of the requirements.
8.3 SATISFACTORY - Some doubt exists that the Offeror will successfully perform the required effort based on their performance record. If the Offeror has no record of relevant past performance upon which to base a meaningful performance risk prediction, this rating will be assigned for Past Performance. The proposal demonstrates an approach which is capable of meeting all requirements and objectives. The Offeror may satisfactorily complete the proposed tasks, but there is at least a moderate risk that it will not be successful. The approach includes both advantageous and disadvantageous characteristics of substance, where the advantages are not outweighed by the disadvantages. Collectively, the advantages and disadvantages are likely to result in acceptable performance. The risk of unsuccessful performance is moderate, as the proposal solutions are generally feasible and practical. These solutions are further considered to reflect moderate risk in that they are somewhat clear and precise, partially supported, and demonstrate a general understanding of the requirements.
8.4 MARGINAL - Significant doubt exists that the Offeror will successfully perform the required effort based on their performance record. The proposal demonstrates an approach which may not be capable of meeting all requirements and objectives. The Offeror may satisfactorily complete the proposed tasks, but there is a high risk that it will not be successful. The approach has disadvantages of substance and advantages, which if they exist, are outweighed by the disadvantages. Collectively, the advantages and disadvantages are not likely to result in satisfactory performance. The risk of unsuccessful performance is high as the proposal contains solutions which may not be feasible and practical. These solutions are further considered to reflect high risk in that they lack clarity and precision, are generally unsupported, and do not demonstrate a complete understanding of the requirements.
8.5 UNSATISFACTORY - It is extremely doubtful that the Offeror will successfully perform the required effort based on their performance record. The proposal demonstrates an approach which will very likely not be capable of meeting all requirements and objectives. In terms of a specific factor, the Offeror fails to meet the minimum requirements and there is unacceptably high risk that it will not be successful. This approach has numerous disadvantages of substance, and advantages which, if they exist, are far outweighed by disadvantages. Collectively, the advantages and disadvantages will not result in satisfactory performance. The risk of unsuccessful performance is very high as the proposal contains solutions which are not feasible and practical. The solutions are further considered to reflect very high risk in that they lack any clarity or precision, are unsupported, and do not demonstrate an understanding of the requirement.
9. RELATIVE IMPORTANCE OF FACTORS
9.1 NON-COST FACTORS:
FACTOR 1: CORPORATE RELEVANT SPECIALIZED EXPERIENCE: This factor is equal in importance to Factor 2 and more important than Factor 3.
FACTOR 2: PAST PERFORMANCE: This factor is equal in importance to Factor 1 and more important than Factor 3.
FACTOR 3: SUMMARY SCHEDULE: This factor is less important than Factor 1 and Factor 2.
10 PRICE: All non-cost factors, when combined, are significantly more important than Price.
11. PROPOSAL EVALUATION.
11.1 The SSEB will be established to conduct the evaluation of proposals received in response to this solicitation. The evaluation will be based on the content of the proposal, proposal corrections and any information obtained from other sources, e.g. past performance information. The SSEB will not consider any documents incorporated by reference, except as expressly allowed by this solicitation.
11.2 Each member of the SSEB will independently consider all information provided in the proposal.
Once these individual analyses are completed, the SSEB will assign a consensus rating for each evaluation factor. It is the responsibility of each member of the SSEB to provide and document sufficient strengths, weaknesses, and/or deficiencies to support the assigned rating for each factor as well as the overall rating. Comments are required for all ratings.
11.3 The final overall rating along with ratings on individual factors, to include all support documentation, will be provided to the Source Selection Authority. The Source Selection Authority, independently exercising prudent business judgment, will determine which Offeror, if any, will receive the contract award.
12. EXCEPTIONS. Exceptions to the contractual terms and conditions of the solicitation (e.g., standard company terms and conditions) may result in a determination to reject a proposal.
13. RESTRICTIONS. Failure to submit all the data in the format indicated in this section may be cause for determining a proposal incomplete and, therefore, not considered for evaluation, and for subsequent award.
14. PRICE.
14.1 Price will not be rated, but will be a factor in establishing the competitive range prior to discussions (if held) and in making the best value decision for award of any resultant contract. Pricing for the contract shall be completed and submitted on the Pricing Schedule shown at Section 00010—Schedule B of the solicitation.
14.2 The Government will perform a price analysis on all proposals received for the contract. Price analysis will be performed in accordance with FAR 15.404-1, to determine fairness and reasonableness as well as to assure an understanding of the work and ability to execute the contract at price proposed.