vol2.pdf
PDF 2 MB Posted
- Attached to
- Special Operations Facility (SOF) Operations Additions, Fort Bragg, NC Federal contract opportunity
- Solicitation number
- W912HN-10-R-0042
About this file
W912HN-10-R-0042 SPECS VOL2
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912HN_10_R_0042_V2.zip | ZIP file | |
| W912HN_10_R_0042_V1.zip | ZIP file | |
| vol3.pdf | ||
| vol1.pdf | ||
| W912HN_10_R_0042_V3.zip | ZIP file | |
| W912HN_10_R_0042_V4.zip | ZIP file |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Fort Bragg North Carolina
Solicitation Number
W912HN-10-R-0042
SOF Operations Addition
FY 11, PN 64484
Volume 2 of 3 – Technical Provisions Divisions 07 through 25 January 2011
THIS SOLICITATION IS UNRESTRICTED PURSUANT TO THE
"BUSINESS OPPORTUNITY DEVELOPMENT REFORM ACT OF 1988"
(PUBLIC LAW 100-656)
U.S. ARMY ENGINEER DISTRICT, SAVANNAH
CORPS OF ENGINEERS
100 WEST OGLETHORPE AVENUE
SAVANNAH, GEORGIA 31401-3640
US Army Corps of Engineers Savannah District
SOF Operations Additions W912HN-10-R-0042
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 00 60 SECURITY PROCEDURES GUIDE
01 32 01.00 10 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 33 29 LEED(TM) DOCUMENTATION
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 01.10 USACE QUALITY CONTROL SYSTEM (QCS)
01 45 01 USACE QUALITY CONTROL
01 45 35 SPECIAL INSPECTION FOR SEISMIC-RESISTING SYSTEMS
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 57 16 TEMPORARY PEST CONTROL
01 57 19.11 INDOOR AIR QUALITY (IAQ) MANAGEMENT
01 57 20.00 10 ENVIRONMENTAL PROTECTION
01 57 23 TEMPORARY STORM WATER POLLUTION CONTROL
01 62 35 RECYCLED / RECOVERED MATERIALS
01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT
01 78 00 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
01 80 00 GEOTECHNICAL REPORT
01 90 00 SOF OPERATIONS STORMWATER TESTING
DIVISION 02 - EXISTING CONDITIONS
02 41 00 DEMOLITION
DIVISION 03 - CONCRETE
03 11 13.00 10 STRUCTURAL CONCRETE FORMWORK
03 15 13.00 10 EXPANSION JOINTS, CONTRACTION JOINTS, AND WATERSTOPS
03 20 01.00 10 CONCRETE REINFORCEMENT
03 31 00.00 10 CAST-IN-PLACE STRUCTURAL CONCRETE
03 40 00.00 10 PLANT-PRECAST CONCRETE PRODUCTS FOR BELOW GRADE
CONSTRUCTION
03 50 00 HELICAL PILES
DIVISION 04 - MASONRY
04 20 00 MASONRY
04 21 13.13 NONBEARING MASONRY VENEER/STEEL STUD WALLS
DIVISION 05 - METALS
05 05 23.13 10 ULTRASONIC INSPECTION OF WELDMENTS
05 05 23 WELDING, STRUCTURAL
05 12 00 STRUCTURAL STEEL
05 21 19 OPEN WEB STEEL JOIST FRAMING
05 30 00 STEEL DECKS
05 40 00 COLD-FORMED METAL FRAMING
05 50 13 MISCELLANEOUS METAL FABRICATIONS
05 51 00 METAL STAIRS
05 51 33 METAL LADDERS
05 52 00 METAL RAILINGS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
PROJECT TABLE OF CONTENTS Page 1
06 10 00 ROUGH CARPENTRY
06 20 00 FINISH CARPENTRY
06 41 16.00 10 LAMINATE CLAD ARCHITECTURAL CASEWORK
06 61 16 SOLID POLYMER (SOLID SURFACING) FABRICATIONS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 14 00 FLUID-APPLIED WATERPROOFING
07 21 13 BOARD AND BLOCK INSULATION
07 21 16 MINERAL FIBER BLANKET INSULATION
07 22 00 ROOF AND DECK INSULATION
07 42 13 METAL WALL PANELS
07 52 00 MODIFIED BITUMINOUS MEMBRANE ROOFING
07 60 00 FLASHING AND SHEET METAL
07 61 14.00 20 STEEL STANDING SEAM ROOFING
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 11 16 ALUMINUM DOORS AND FRAMES
08 33 23 OVERHEAD COILING DOORS
08 34 53 SECURITY DOORS AND FRAMES
08 44 00 CURTAIN WALL, STOREFRONT, AND GLAZED ASSEMBLIES
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
08 91 00 METAL WALL LOUVERS
DIVISION 09 - FINISHES
09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 29 00 GYPSUM BOARD
09 30 00 CERAMIC TILE, QUARRY TILE, AND PAVER TILE
09 51 00 ACOUSTICAL CEILINGS AND HANGING SOUND-ABSORPTIVE BAFFLES
09 65 00 RESILIENT FLOORING
09 65 66 RESILIENT ATHLETIC FLOORING
09 67 00 ATHLETIC TRACK SURFACING
09 68 00 CARPET
09 69 13 RIGID GRID ACCESS FLOORING
09 83 13 ACOUSTICAL WALL TREATMENT
09 90 00 PAINTS AND COATINGS
09 90 20 SPECIAL COATINGS
DIVISION 10 - SPECIALTIES
10 10 00 VISUAL COMMUNICATIONS SPECIALTIES
10 14 02 INTERIOR SIGNAGE
10 21 13 TOILET COMPARTMENTS
10 28 13 TOILET ACCESSORIES
10 44 16 FIRE EXTINGUISHER BRACKETS
10 51 13 METAL LOCKERS
10 56 00 MOBILE STORAGE SHELVING UNITS
DIVISION 12 - FURNISHINGS
12 21 00 WINDOW BLINDS
12 93 00 SITE FURNISHINGS
PROJECT TABLE OF CONTENTS Page 2
DIVISION 13 - SPECIAL CONSTRUCTION
13 11 23 HOT PLUNGE POOL
DIVISION 21 - FIRE SUPPRESSION
21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION
DIVISION 22 - PLUMBING
22 00 00 PLUMBING, GENERAL PURPOSE
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 08 00.00 10 COMMISSIONING OF HVAC SYSTEMS
23 09 23 DIRECT DIGITAL CONTROL FOR HVAC AND OTHER LOCAL BUILDING
SYSTEMS
23 23 00 REFRIGERANT PIPING
23 52 00 HEATING BOILERS
23 64 26 CHILLED WATER PIPING SYSTEMS
23 82 02.00 10 UNITARY HEATING AND COOLING EQUIPMENT
DIVISION 25 - INTEGRATED AUTOMATION
25 08 10 UTILITY MONITORING AND CONTROL SYSTEM TESTING
25 10 10 UTILITY MONITORING AND CONTROL SYSTEM (UMCS)
DIVISION 26 - ELECTRICAL
26 05 48.00 10 SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 29 23 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS
26 41 01.00 10 LIGHTNING PROTECTION SYSTEM
26 51 00 INTERIOR LIGHTING
26 56 00 EXTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
27 05 14.00 10 CABLE TELEVISION PREMISES DISTRIBUTION SYSTEM
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
27 51 16.02 PUBLIC ADDRESS SYSTEMS - DINING HALL
27 51 16 PUBLIC ADDRESS SYSTEMS
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 00 00 ELECTRONIC SECURITY SYSTEM
28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM
DIVISION 31 - EARTHWORK
31 00 00 EARTHWORK
31 05 19 GEOTEXTILE
31 11 00 CLEARING AND GRUBBING
31 31 16 SOIL TREATMENT FOR SUBTERRANEAN TERMITE CONTROL
DIVISION 32 - EXTERIOR IMPROVEMENTS
PROJECT TABLE OF CONTENTS Page 3
32 01 19 FIELD MOLDED SEALANTS FOR SEALING JOINTS IN RIGID
PAVEMENTS
32 05 33 LANDSCAPE ESTABLISHMENT
32 10 00 BITUMINOUS CONCRETE PAVEMENT
32 11 23 AGGREGATE BASE COURSE
32 12 10 BITUMINOUS TACK AND PRIME COATS
32 13 13.06 PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND SITE
FACILITIES
32 16 13 CONCRETE SIDEWALKS AND CURBS AND GUTTERS
32 17 24.00 10 PAVEMENT MARKINGS
32 19 00 ARTIFICIAL TURF SYSTEM
32 92 23 SODDING
32 93 00 EXTERIOR PLANTS
DIVISION 33 - UTILITIES
33 11 00 WATER DISTRIBUTION
33 30 00 SANITARY SEWERS
33 40 00 STORM DRAINAGE UTILITIES
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 4
SECTION 07 14 00
FLUID-APPLIED WATERPROOFING
04/06
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM C 33 (2007) Standard Specification for Concrete Aggregates
ASTM C 578 (2008) Standard Specification for Rigid, Cellular Polystyrene Thermal Insulation
ASTM C 836 (2006) High Solids Content, Cold Liquid-Applied Elastomeric Waterproofing Membrane for Use With Separate Wearing Course
ASTM D 1056 (2007) Standard Specification for Flexible Cellular Materials - Sponge or Expanded Rubber
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-03 Product Data
Fluid-applied membrane; G
Membrane primer
Elastomeric sheet; G
Flexible foam-backed elastomeric sheet; G
Solvent
Moisture meter
Protection board; G
Bond breaker
Submit material description and physical properties, application details, and recommendations regarding shelf life, application
SECTION 07 14 00 Page 1 procedures, and precautions on flammability and toxicity.
1.3 PREWATERPROOFING CONFERENCE
Prior to starting application of waterproofing system, arrange and attend a prewaterproofing conference to ensure a clear understanding of drawings and specifications. Give the Contracting Officer 7 days advance written notice of the time and place of meeting. Ensure that the mechanical and electrical subcontractor, flashing and sheetmetal subcontractor, and other trades that may perform other types of work on or over the membrane after installation, attend this conference.
1.4 DELIVERY, STORAGE, AND HANDLING
Deliver waterproofing materials in manufacturer's original, unopened containers, with labels intact and legible. Containers of materials covered by a referenced specification number shall bear the specification number, type, and class of the contents. Deliver materials in sufficient quantity to continue work without interruption. Store and protect materials in accordance with manufacturer's instructions, and use within their indicated shelf life. When hazardous materials are involved, adhere to special precautions of the manufacturer, unless precautions conflict with local, state, and federal regulations. Promptly remove from the site materials or incomplete work adversely affected by exposure to moisture or freezing. Store materials on pallets and cover from top to bottom with canvas tarpaulins.
1.5 ENVIRONMENTAL CONDITIONS
Apply materials when ambient temperature is 40 degrees F or above for a period of 24 hours prior to the application and when there is no ice, frost, surface moisture, or visible dampness on the substrate surface.
Apply materials when air temperature is expected to remain above 40 degrees F during the cure period recommended by the manufacturer. Moisture test for substrate is specified under paragraph entitled "Moisture Test." Work may be performed within heated enclosures, provided the surface temperature of the substrate is maintained at a minimum of 40 degrees F for 24 hours prior to the application of the waterproofing, and remains above that temperature during the cure period recommended by the manufacturer.
PART 2 PRODUCTS
2.1 FLUID-APPLIED MEMBRANE
ASTM C 836.
2.2 MEMBRANE PRIMER
As recommended by the fluid-applied membrane manufacturer unless specifically prohibited by the manufacturer of the fluid-applied membrane.
2.3 SEALANT
As specified in Section 07 92 00 JOINT SEALANTS.
2.4 SEALANT PRIMER
As specified in Section 07 92 00 JOINT SEALANTS.
SECTION 07 14 00 Page 2
2.5 BACKING MATERIAL
Premolded, closed-cell, polyethylene, or polyurethane foam rod having a diameter 25 percent larger than joint width before being compressed into joint. Provide bond breaker of polyethylene film or other suitable material between backing material and sealant.
2.6 JOINT FILLER
As specified in Section 03 31 00.00 10 CAST-IN-PLACE STRUCTURAL CONCRETE.
2.7 BOND BREAKER
As recommended by the fluid-applied membrane manufacturer. Bond breaker shall not interfere with the curing process or other performance properties of the fluid-applied membrane.
2.8 ELASTOMERIC SHEET
Preformed; as recommended by the fluid-applied membrane manufacturer. Bond strength between the fluid-applied membrane and the preformed elastomeric sheet shall be a minimum of one psi when tested in accordance with
ASTM C 836.
2.9 ELASTOMERIC SHEET ADHESIVE
As recommended by the elastomeric sheet manufacturer.
2.10 FLEXIBLE FOAM-BACKED ELASTOMERIC SHEET
Flexible foam-backed elastomeric sheet for protection over preformed elastomeric sheet at expansion joints shall be 1/2 inch thick, minimum, closed cell foam conforming to ASTM D 1056, Type 2, Class B, Grades 2 or 3, factory-bonded to 1/16 inch thick, minimum, preformed elastomeric sheet.
2.11 PROTECTION BOARD
Premolded bitumen composition board, 1/8 inch minimum thickness or other composition board compatible with the fluid-applied membrane.
2.12 DRAINAGE COURSE AGGREGATE
ASTM C 33, size No. 8.
2.13 INSULATION
Polystyrene foam conforming to ASTM C 578, Class IV, thickness as indicated.
PART 3 EXECUTION
3.1 PREPARATION
Coordinate work with that of other trades to ensure that components to be incorporated into the waterproofing system are available when needed.
Inspect and approve surfaces immediately before application of waterproofing materials. Remove laitance, loose aggregate, sharp projections, grease, oil, dirt, curing compounds, and other contaminants which could adversely affect the complete bonding of the fluid-applied membrane to the concrete surface.
SECTION 07 14 00 Page 3
3.1.1 Flashings
Make penetrations through sleeves in concrete slab watertight before application of waterproofing. After flashing is completed, cover elastomeric sheet with fluid-applied waterproofing during waterproofing application.
3.1.1.1 Drains
Make drain flanges flush with surface of structural slab. Apply a full elastomeric sheet around the drain, with edges fully adhered to drain flange and to structural slab. Do not adhere elastomeric sheet over joint between drain and concrete slab. Do not plug drainage or weep holes. Cover elastomeric sheet with fluid-applied waterproofing during waterproofing application. Lap elastomeric sheet a minimum of 4 inches onto concrete slab.
3.1.1.2 Penetrations and Projections
Flash penetrations and projections through structural slab with an elastomeric sheet adhered to the concrete slab and the penetration. Leave elastomeric sheet unadhered for one inch over joint between penetration and concrete slab. Adhere elastomeric sheet a minimum of 4 inches onto horizontal deck.
3.1.1.3 Walls and Vertical Surfaces
Flash wall intersections which are not of monolithic pour or constructed with reinforced concrete joints with an elastomeric sheet adhered to both vertical wall surfaces and concrete slab. Flash intersections which are monolithically poured or constructed with reinforced concrete joints with either an elastomeric sheet or a vertical grade of fluid-applied waterproofing adhered to vertical wall surfaces and concrete slab. Leave sheet unadhered for a distance of one inch from the corner on both vertical and horizontal surfaces.
3.1.2 Cracks and Joints
Prepare visible cracks and joints in substrate to receive fluid-applied waterproofing membrane by placing a bond breaker and an elastomeric slip sheet between membrane and substrate. Cracks that show movement shall receive a 2 inch bond breaker followed by an elastomeric sheet adhered to the deck. Nonmoving cracks shall be double coated with fluid-applied waterproofing.
3.1.3 Priming
Prime surfaces to receive fluid-applied waterproofing membrane. Apply primer as required by membrane manufacturer's printed instructions.
3.2 SPECIAL PRECAUTIONS
Protect waterproofing materials during transport and application. Do not dilute primers and other materials, unless specifically recommended by materials manufacturer. Keep containers closed except when removing contents. Do not mix remains of unlike materials. Thoroughly remove residual materials before using application equipment for mixing and transporting materials. Do not permit equipment on the project site that
SECTION 07 14 00 Page 4 has residue of materials used on previous projects. Use cleaners only for cleaning, not for thinning primers or membrane materials. Ensure that workers and others who walk on cured membrane wear clean, soft-soled shoes to avoid damaging the waterproofing materials.
3.3 APPLICATION
Over primed surfaces, provide a uniform, wet, monolithic coating of fluid-applied membrane, 60 mils thick, plus or minus 5 mils by following manufacturer's printed instructions. Apply material by trowel, squeegee, roller, brush, spray apparatus, or other method recommended by membrane manufacturer. Check wet film thickness as specified in paragraph entitled "Film Thickness" and adjust application rate as necessary to provide a uniform coating of the thickness specified. Where possible, mark off surface to be coated in equal units to facilitate proper coverage. At expansion joints, control joints, prepared cracks, flashing, and terminations, carry membrane over preformed elastomeric sheet in a uniform 60 mil thick, plus or minus 5 mils, wet thickness to provide a monolithic coating. If membrane cures before next application, wipe previously applied membrane with a solvent to remove dirt and dust that could inhibit adhesion of overlapping membrane coat. Use solvent recommended by the membrane manufacturer, as approved.
3.3.1 Work Sequence
Perform work so that protection board is installed prior to using the waterproofed surface. Do not permanently install protection board until the membrane has passed the flood test specified under paragraph entitled "Flood Test." Move material storage areas as work progresses to prevent abuse of membrane and overloading of structural deck.
3.3.2 Protection Board
Protect fluid-applied membrane by placing protection board over membrane at a time recommended by the membrane manufacturer. Protect membrane application when protection board is not placed immediately. Butt protection boards together and do not overlap.
3.3.3 Drainage Course
Place drainage course where shown after flood tests are completed and concrete protection slab or wearing course is ready to be installed.
3.3.4 Insulation
Place insulation of thickness indicated, on top of drainage course just prior to placement of concrete protection slab.
3.4 FIELD QUALITY CONTROL
3.4.1 Moisture Test
Prior to application of fluid-applied waterproofing, measure moisture content of substrate with a moisture meter in the presence of the Contracting Officer. An acceptable device is the Delmhorst Moisture Meter, Model BD7/2E/CS, Type 21 E. Similar meters by other manufacturers, which are suitable for the purpose, may be used as approved by the Contracting Officer. Do not begin application until meter reading indicates "dry" range.
SECTION 07 14 00 Page 5
3.4.2 Film Thickness
Measure wet film thickness every 100 square feetduring application by placing flat metal plates on the substrate or using a mil-thickness gage especially manufactured for the purpose.
3.4.3 Flood Test
After application and curing is complete, plug drains and fill waterproofed area with water to a depth of 2 inches. A minimum 48 hour cure time, or longer cure time if recommended by the membrane manufacturer, shall be required prior to flood testing. Allow water to stand 24 hours. Test watertightness by measuring water level at beginning and end of the 24 hour period. If water level falls, drain water, allow installation to dry, and inspect. Make repairs or replace as required and repeat the test. Work shall not proceed before approval of repairs or replacement.
3.5 INFORMATION CARD
Furnish a typewritten card containing information listed in the attached Form l, framed in a watertight frame under clear glass or plastic for each waterproofing installation. Furnish framed card and duplicate card.
SECTION 07 14 00 Page 6
FORM 1
FLUID-APPLIED WATERPROOFING SYSTEM COMPONENTS
1. Contract Number
2. Date Work Completed
3. Project Specification Designation
4. Substrate Material
5. Slope of Substrate
6. Drains Type/Manufacturer
7. Waterproofing
a. Membrane
b. Sealant
c. Elastomeric Sheet
d. Materials Manufacturer(s)
8. Protection Board
a. Type
b. Thickness
c. Manufacturer's Name
9. Drainage Course Material Graduation
10. Insulation
a. Type
b. Thickness
c. Manufacturer's Name
11. Protection Slab
a. Material
b. Thickness
c. Support
d. Joint System
12. Wearing Course
a. Type
b. Slope
c. Joint System
d. Sealant/Gasket Type
13. Wearing Surface Type Manufacturer's Name
14. Statement of Compliance or Exception
Contractor's Signature Date Signed
Inspector's Signature Date Signed
-- End of Section --
SECTION 07 14 00 Page 7
SECTION 07 21 13
BOARD AND BLOCK INSULATION
04/06
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM C 1289 (2008) Standard Specification for Faced Rigid Cellular Polyisocyanurate Thermal Insulation Board
ASTM C 272 (2001; R 2007) Water Absorption of Core Materials for Structural Sandwich Constructions
ASTM C 578 (2009e1) Standard Specification for Rigid, Cellular Polystyrene Thermal Insulation
ASTM C 591 (2008a) Standard Specification for Unfaced Preformed Rigid Cellular Polyisocyanurate Thermal Insulation
ASTM C 930 (2005) Potential Health and Safety Concerns Associated with Thermal Insulation Materials and Accessories
ASTM E 84 (2009a) Standard Test Method for Surface Burning Characteristics of Building Materials
ASTM E 96/E 96M (2005) Standard Test Methods for Water Vapor Transmission of Materials
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
29 CFR 1910.134 Respiratory Protection
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-03 Product Data
Block or board insulation; G
Accessories
SECTION 07 21 13 Page 1
SD-08 Manufacturer's Instructions
Block or Board Insulation
Adhesive
1.3 DELIVERY, STORAGE, AND HANDLING
1.3.1 Delivery
Deliver materials to the site in original sealed wrapping bearing manufacturer's name and brand designation, specification number, type, grade, R-value, and class. Store and handle to protect from damage. Do not allow insulation materials to become wet, soiled, crushed, or covered with ice or snow. Comply with manufacturer's recommendations for handling, storing, and protecting of materials before and during installation.
1.3.2 Storage
Inspect materials delivered to the site for damage; unload and store out of weather in manufacturer's original packaging. Store only in dry locations, not subject to open flames or sparks, and easily accessible for inspection and handling.
1.4 SAFETY PRECAUTIONS
1.4.1 Respirators
Provide installers with dust/mist respirators, training in their use, and protective clothing, all approved by National Institute for Occupational Safety and Health (NIOSH)/Mine Safety and Health Administration (MSHA) in accordance with 29 CFR 1910.134.
1.4.2 Other Safety Considerations
Consider safety concerns and measures as outlined in ASTM C 930.
PART 2 PRODUCTS
2.1 BLOCK OR BOARD INSULATION
Provide only thermal insulating materials recommended by manufacturer for type of application indicated. Provide board or block thermal insulation conforming to the following standards and the physical properties listed below:
a. Extruded Preformed Cellular Polystyrene: ASTM C 578. Insulation shall have an R-value of R-5 per inch or better in accordance with
ASTM C 158.
b. Unfaced Preformed Rigid Polyurethane and Polyisocyanurate Board:
ASTM C 591, as indicated on drawings.
c. Faced Rigid Cellular Polyisocyanurate and Polyurethane Insulation:
ASTM C 1289, as indicated on drawings. Insulation shall have an R-value of R-5 per inch or better in accordance with ASTM C 158.
SECTION 07 21 13 Page 2
2.1.1 Fire Protection Requirement
a. Flame spread index of 75 or less when tested in accordance with
ASTM E 84.
b. Smoke developed index of 200 or less when tested in accordance with ASTM E 84.
2.1.2 Other Material Properties
Provide thermal insulating materials with the following properties:
a. Water Vapor Permeance: Not more than 1.1 Perms or less when measured according to ASTM E 96/E 96M, desiccant method, in the thickness required to provide the specified thermal resistance, including facings, if any.
b. Water Absorption: Not more than 2 percent by total immersion, by volume, when measured according to ASTM C 272.
2.1.3 Recycled Materials
Provide thermal insulation containing recycled materials to the extent practicable, provided that the material meets all other requirements of this section. The minimum required recycled material contents (by weight, not volume) are:
Polyisocyanurate/Polyurethane: 9 percent Phenolic Rigid Foam : 5 percent Perlite Board: 23 percent
2.1.4 Prohibited Materials
Do not provide materials containing more than one percent of asbestos.
2.2 ACCESSORIES
2.2.1 Adhesive
As recommended by insulation manufacturer.
PART 3 EXECUTION
3.1 INSTALLATION
3.1.1 Insulation Board
Install and handle insulation in accordance with the manufacturer's installation instructions. Keep material dry and free of extraneous materials. Observe safe work practices.
3.1.2 Continuity of Insulation
Butt tightly against adjoining boards, and obstructions. Provide continuity and integrity of insulation. Avoid creating any thermal bridges or voids.
SECTION 07 21 13 Page 3
3.2 PERIMETER INSULATION
Install perimeter thermal insulation where heated spaces are adjacent to exterior walls.
3.2.1 Manufacturer's Instructions
Install, attach, tape edges, provide vapor retarder and other requirements such as protection against vermin, insects, damage during construction as recommended in manufacturer's instructions.
3.2.2 Insulation on Vertical Surfaces
Install thermal insulation as indicated. Fasten insulation with adhesive.
SECTION 07 21 13 Page 4
SECTION 07 21 16
MINERAL FIBER BLANKET INSULATION
04/06
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM C 665 (2006) Mineral-Fiber Blanket Thermal Insulation for Light Frame Construction and Manufactured Housing
ASTM C 930 (2005) Potential Health and Safety Concerns Associated with Thermal Insulation Materials and Accessories
ASTM D 3833/D 3833M (1996; R 2006) Water Vapor Transmission of Pressure-Sensitive Tapes
ASTM E 136 (2004) Behavior of Materials in a Vertical Tube Furnace at 750 Degrees C
ASTM E 84 (2008a) Standard Test Method for Surface Burning Characteristics of Building Materials
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 211 (2006) Chimneys, Fireplaces, Vents, and Solid Fuel-Burning Appliances
NFPA 31 (2006; Errata 2006; Errata 2007) Installation of Oil Burning Equipment
NFPA 54 (2008) National Fuel Gas Code
NFPA 70 (2007; AMD 1 2008) National Electrical Code - 2008 Edition
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
29 CFR 1910.134 Respiratory Protection
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SECTION 07 21 16 Page 1
SD-03 Product Data
Blanket insulation; G
Pressure sensitive tape
Accessories; G
SD-08 Manufacturer's Instructions
Insulation
1.3 DELIVERY, STORAGE, AND HANDLING
1.3.1 Delivery
Deliver materials to site in original sealed wrapping bearing manufacturer's name and brand designation, specification number, type, grade, R-value, and class. Store and handle to protect from damage. Do not allow insulation materials to become wet, soiled, crushed, or covered with ice or snow. Comply with manufacturer's recommendations for handling, storing, and protecting of materials before and during installation.
1.3.2 Storage
Inspect materials delivered to the site for damage; unload and store out of weather in manufacturer's original packaging. Store only in dry locations, not subject to open flames or sparks, and easily accessible for inspection and handling.
1.4 SAFETY PRECAUTIONS
1.4.1 Respirators
Provide installers with dust/mist respirators, training in their use, and protective clothing, all approved by National Institute for Occupational Safety and Health (NIOSH)/Mine Safety and Health Administration (MSHA) in accordance with 29 CFR 1910.134.
1.4.2 Smoking
Do not smoke during installation of blanket thermal insulation.
1.4.3 Other Safety Concerns
Consider other safety concerns and measures as outlined in ASTM C 930.
PART 2 PRODUCTS
2.1 BLANKET INSULATION
ASTM C 665, Type I, blankets without membrane coverings, except a flame spread rating of 25 or less and a smoke developed rating of 150 or less when tested in accordance with ASTM E 84.
2.1.1 Thermal Resistance Value (R-VALUE)
As indicated
SECTION 07 21 16 Page 2
2.1.2 Recycled Materials
Provide Thermal Insulation containing recycled materials to the extent practicable, provided the material meets all other requirements of this section. The minimum required recycled materials content by weight are:
Rock Wool: 75 percent slag Fiberglass: 20 to 25 percent glass cullet
2.1.3 Prohibited Materials
Do not provide asbestos-containing materials.
2.1.4 Sound Attenuation Batts
Sound attenuation insulation batts shall be unfaced mineral fiber insulation meeting requirements of the sound reducing assemblies indicated on drawings.
2.2 BLOCKING
Metal, unfaced mineral fiber blankets in accordance with ASTM C 665, Type I, or other approved materials. Use only non-combustible materials meeting the requirements of ASTM E 136 for blocking around chimneys and heat producing devices.
2.3 PRESSURE SENSITIVE TAPE
As recommended by the vapor retarder manufacturer and having a water vapor permeance rating of one perm or less when tested in accordance with
ASTM D 3833/D 3833M.
2.4 ACCESSORIES
2.4.1 Adhesive
As recommended by the insulation manufacturer.
2.4.2 Mechanical Fasteners
Corrosion resistant fasteners as recommended by the insulation manufacturer.
2.4.3 Wire Mesh
Corrosion resistant and as recommended by the insulation manufacturer.
PART 3 EXECUTION
3.1 EXISTING CONDITIONS
Before installing insulation, ensure that areas that will be in contact with the insulation are dry and free of projections which could cause voids, compressed insulation, or punctured vapor retarders. If moisture or other conditions are found that do not allow the workmanlike installation of the insulation, do not proceed but notify Contracting Officer of such conditions.
SECTION 07 21 16 Page 3
3.2 PREPARATION
3.2.1 Blocking Around Heat Producing Devices
Install non-combustible blocking around heat producing devices to provide the following clearances:
a. Recessed lighting fixtures, including wiring compartments, ballasts, and other heat producing devices, unless these are certified by the manufacturer for installation surrounded by insulation: 3 inches from outside face of fixtures and devices or as required by NFPA 70 and, if insulation is to be placed above fixture or device, 24 inches above fixture.
b. Vents and vent connectors used for venting the products of combustion, flues, other than masonry chimneys: Minimum clearances as required by NFPA 211.
c. Gas Fired Appliances: Clearances as required in NFPA 54.
d. Oil Fired Appliances: Clearances as required in NFPA 31.
Blocking around flues is not required when insulation blanket, including any attached vapor retarder, passed ASTM E 136, in addition to meeting all other requirements stipulated in Part 2.
3.3 INSTALLATION
3.3.1 Insulation
Install and handle insulation in accordance with manufacturer's instructions. Keep material dry and free of extraneous materials. Ensure personal protective clothing and respiratory equipment is used as required. Observe safe work practices.
3.3.1.1 Electrical wiring
Do not install insulation in a manner that would sandwich electrical wiring between two layers of insulation.
3.3.1.2 Continuity of Insulation
Install blanket insulation to butt tightly against adjoining blankets and to studs, rafters, joists, sill plates, headers and any obstructions.
Provide continuity and integrity of insulation at corners, wall to ceiling joints, roof, and floor. Avoid creating thermal bridges.
3.3.1.3 Installation at Bridging and Cross Bracing
Insulate at bridging and cross bracing by splitting blanket vertically at center and packing one half into each opening. Butt insulation at bridging and cross bracing; fill in bridged area with loose or scrap insulation.
3.3.1.4 Cold Climate Requirement
Place insulation to the outside of pipes.
SECTION 07 21 16 Page 4
3.3.1.5 Insulation without Affixed Vapor Retarder
Provide snug friction fit to hold insulation in place. Stuff pieces of insulation into cracks between studs and other framing.
3.3.1.6 Sizing of Blankets
Provide only full width blankets when insulating between studs. Size width of blankets for a snug fit where studs are irregularly spaced.
3.3.1.7 Access Panels and Doors
Affix blanket insulation to access panels greater than one square foot and access doors in insulated floors and ceilings. Use insulation with same R-Value as that for floor or ceiling.
SECTION 07 21 16 Page 5
SECTION 07 22 00
ROOF AND DECK INSULATION
11/08
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM C 1177/C 1177M (2008) Standard Specification for Glass Mat Gypsum Substrate for Use as Sheathing
ASTM C 1289 (2008) Standard Specification for Faced Rigid Cellular Polyisocyanurate Thermal Insulation Board
ASTM D 4586 (2007) Asphalt Roof Cement, Asbestos-Free
ASTM E 84 (2008a) Standard Test Method for Surface Burning Characteristics of Building Materials
FM GLOBAL (FM)
FM 4470 (1986; R 1992) Class I Roof Covers
FM P7825 (2005) Approval Guide
FM P7825c (2005) Approval Guide Building Materials
FM P9513 (2002) Specialist Data Book Set for Roofing Contractors; contains 1-22 (2001), 1-28 (2002), 1-29 (2002), 1-28R/1-29R (1998), 1-30 (2000), 1-31 (2000), 1-32 (2000), 1-33 (2000), 1-34 (2001), 1-49 (2000), 1-52 (2000), 1-54 (2001)
UNDERWRITERS LABORATORIES (UL)
UL Bld Mat Dir (2008) Building Materials Directory
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Wood nailers
SECTION 07 22 00 Page 1
Roof insulation system; G
Cants and crickets
Show location and spacing of wood nailers that are required for securing insulation and for backnailing of roofing felts. Show a complete description of the procedures for the installation of each phase of the system indicating the type of materials, thicknesses, identity codes, sequence of laying insulation, location of ridges and valleys, special methods for cutting and fitting of insulation, and special precautions. The drawings shall be based on field measurements.
SD-03 Product Data
Fasteners; G
Insulation; G
Include minimum thickness of insulation for steel and concrete decks and fastener pattern for insulation on steel decks.
SD-06 Test Reports
Flame spread and smoke developed ratings
Submit in accordance with ASTM E 84.
SD-07 Certificates
Installer qualifications
SD-08 Manufacturer's Instructions
Nails and fasteners
Roof insulation, including field of roof and perimeter attachment requirements.
1.3 MANUFACTURER'S CERTIFICATE
Submit certificate from the insulation manufacturer attesting that the installer has the proper qualifications for installing tapered roof insulation systems.
Certificate attesting that the polyisocyanurate insulation contains recovered material and showing estimated percent of recovered material. Certificates of compliance for felt materials.
1.4 QUALITY ASSURANCE
1.4.1 Insulation on Steel Decks
Roof insulation shall have a flame spread rating not greater than 75 and a smoke developed rating not greater than 150, exclusive of covering, when tested in accordance with ASTM E 84. Insulation bearing the UL label and listed in the UL Bld Mat Dir as meeting the flame spread and smoke developed ratings will be accepted in lieu of copies of test reports.
SECTION 07 22 00 Page 2
Compliance with flame spread and smoke developed ratings will not be required when insulation has been tested as part of a roof construction assembly of the type used for this project and the construction is listed as fire-classified in the UL Bld Mat Dir or listed as Class I roof deck construction in the FM P7825. Insulation tested as part of a roof construction assembly shall bear UL or FM labels attesting to the ratings specified herein.
1.5 DELIVERY, STORAGE, AND HANDLING
1.5.1 Delivery
Deliver materials to site in manufacturer's unopened and undamaged standard commercial containers bearing the following legible information:
a. Name of manufacturer;
b. Brand designation;
c. Specification number, type, and class, as applicable, where materials are covered by a referenced specification; and
Deliver materials in sufficient quantity to allow continuity of the work.
1.5.2 Storage and Handling
Store and handle materials in a manner to protect from damage, exposure to open flame or other ignition sources, and from wetting, condensation or moisture absorption. Store in an enclosed building or trailer that provides a dry, adequately ventilated environment. Replace damaged material with new material.
1.6 ENVIRONMENTAL CONDITIONS
Do not install roof insulation during inclement weather or when air temperature is below 40 degrees F and interior humidity is 45 percent or greater, or when there is visible ice, frost, or moisture on the roof deck.
Coordinate the installation of insulation and roofing system so that insulation is not exposed to precipitation, or exposed overnight. Comply with insulation manufacturer's written instructions for handling, stocking and protection during installation.
1.7 PROTECTION OF PROPERTY
Provide protection as specified in 07 52 00 MODIFIED BITUMINOUS MEMBRANE ROOFING and 07 61 14.00 20 STEEL STANDING SEAM ROOFING.
1.7.1 Special Protection
Provide special protection approved by the insulation manufacturer, or avoid heavy traffic on completed work when ambient temperature is above 80 degrees F.
SECTION 07 22 00 Page 3
PART 2 PRODUCTS
2.1 INSULATION
2.1.1 Insulation Types
Roof insulation shall be one or an assembly of a maximum of three of the following materials and compatible with attachment methods for the specified insulation and roof membrane:
a. Polyisocyanurate Board (Flat and Tapered): ASTM C 1289 Type II, fibrous felt or glass mat membrane both sides, except minimum compressive strength shall be 20 pounds per square inch (psi).
2.1.2 Recovered Materials
Provide thermal insulation materials containing recycled materials to the extent practical. The required minimum recycled material content for the listed materials are:
Polyisocyanurate: 9 percent recovered material
2.1.3 Insulation Thickness
Three layers of 2-inch maximum thickness per layer as necessary to provide a thermal resistance (R value) of 30. Thickness shall be based on the "R" value for aged insulation (LTTR). Insulation over steel decks shall satisfy both specified R value and minimum thickness for width of rib opening recommended in insulation manufacturer's published literature.
2.1.4 Cants and Tapered Edge Strips
Provide preformed cants and tapered edge strips of the same material as the roof insulation; or, when roof insulation material is unavailable, provide pressure-preservative treated wood, wood fiberboard, or rigid perlite board cants and edge strips as recommended by the roofing manufacturer, unless otherwise indicated. Face of cant strips shall have incline of 45 degrees and vertical height of 4 inches. Taper edge strips at a rate of one to 1 1/2 inch per foot down to approximately 1/8 inch thick.
2.2 PROTECTION BOARD
For use as a thermal barrier (underlayment), fire barrier (overlayment), or protection board for torched-down, or adhesively-applied roofing membrane over roof insulation.
2.2.1 Glass Mat Gypsum Roof Board: Coverboard for Modified Bitumen Roof System
ASTM C 1177/C 1177M, 0 Flame Spread and 0 Smoke Developed when tested in accordance with ASTM E 84, 500 psi, Class A, non-combustible, 1/2 inch thick, 4 by 4 feet board size.
SECTION 07 22 00 Page 4
2.3 BITUMENS
2.3.1 Asphalt Roof Cement
ASTM D 4586, Type I for horizontal surfaces and for surfaces sloped from 0 to 3 inches per foot, Type II for vertical and surfaces sloped more than 3 inches per foot.
2.4 FASTENERS
Flush-driven through flat round or hexagonal steel or plastic plates. Steel plates shall be zinc-coated, flat round not less than 1 3/8 inch diameter or hexagonal not less than 28 gage. Plastic plates shall be high-density, molded thermoplastic with smooth top surface, reinforcing ribs and not less than 3 inches in diameter. Fastener head shall recess fully into the plastic plate after it is driven. Plates shall be formed to prevent dishing. Do not use bell-or cup-shaped plates. Fasteners shall conform to insulation manufacturer's recommendations except that holding poweris to achieve wind uplift requirements. Fasteners for steel decks shall conform to FM P7825c for Class I roof deck construction, and shall be spaced to withstand an uplift pressure of 90 pounds per square foot.
2.4.1 Fasteners for Steel Decks
Approved hardened penetrating fasteners or screws conforming to FM 4470 and listed in FM P7825c for Class I roof deck construction. Quantity and placement to withstand a minimum uplift pressure of 90 psf conforming to
FM P7825.
2.4.2 Adhesive
For attachment of coverboard and tapered insulation.
2.5 WOOD NAILERS
Pressure-preservative-treated as specified in Section 06 10 00 ROUGH
CARPENTRY.
PART 3 EXECUTION
3.1 EXAMINATION AND PREPARATION
3.1.1 Surface Inspection
Surfaces shall be clean, smooth, and dry. Check roof deck surfaces, including surfaces sloped to roof drains and outlets, for defects before starting work.
The Contractor shall inspect and approve the surfaces immediately before starting installation. Prior to installing insulation, perform the following:
a. Examine steel decks to ensure that panels are properly secured to structural members and to each other in compliance with structural requirements, and that surfaces of top flanges are flat or slightly convex.
SECTION 07 22 00 Page 5
3.1.2 Surface Preparation
Correct defects and inaccuracies in roof deck surface to eliminate poor drainage and hollow or low spots and perform the following:
a. Install wood nailers the same thickness as insulation at eaves, edges, curbs, walls, and roof openings for securing cant strips, gravel stops, gutters, and flashing flanges. On decks with slopes of one inch per foot or more, install wood nailers perpendicular to slope for securing insulation and for backnailing of roofing felts. Space nailers in accordance with approved shop drawings.
b. Cover steel decks with a layer of insulation board of sufficient thickness to span the width of a deck rib opening, and conforming to fire safety requirements. Secure with piercing or self-drilling, self-tapping fasteners of quantity and placement conforming to FM P7825. Insulation joints parallel to ribs of deck shall occur on solid bearing surfaces only, not over open ribs.
3.2 INSULATION INSTALLATION
Apply insulation in three layers with staggered joints. Lay insulation so that continuous longitudinal joints are perpendicular to direction of base ply roofing, as specified in Section 07 52 00 MODIFIED BITUMINOUS MEMBRANE ROOFING, and end joints of each course are staggered with those of adjoining courses. When using multiple layers of insulation, joints of each succeeding layer shall be parallel and offset in both directions with respect to layer below. Keep insulation 1/2 inch clear of vertical surfaces penetrating and projecting from roof surface.
3.2.1 Installation Using Only Mechanical Fasteners
Secure total thickness of insulation with penetrating type fasteners.
3.2.2 Special Precautions for Installation of Foam Insulation
3.2.2.1 Polyisocyanurate Insulation at Modified Roof
Where polyisocyanurate foam board insulation is provided for modified bituminous membrane roofing, install 1/2 inch thick glass mat gypsum roof board, over top surface of foam board insulation in cold adhesive.
Stagger joints of insulation with respect to foam board insulation below.
3.2.3 Cant Strips
Where indicated, provide cant strips at intersections of roof with walls, parapets, and curbs extending above roof. Wood cant strips shall bear on and be anchored to wood blocking. Fit cant strips flush against vertical surfaces. Where possible, nail cant strips to adjoining surfaces. Where cant strips are installed against non-nailable materials, install in a heavy coating of asphalt roof cement or an approved adhesive as approved by modified bitumen roofing manufacturer.
3.2.4 Tapered Insulation Edge Strips
Where indicated, provide edge strips in the right angle formed by junction of roof and wood nailing strips that extend above level of roofand to form crickets for positive drainage to roof drains. Install edge strips flush
SECTION 07 22 00 Page 6 against vertical surfaces of wood nailing strips. Where possible, nail edge strips to adjoining surfaces. Where installed against non-nailable materials, install in adhesive recommended by the insulation manufacturer applied in ribbons of size and spacing to provide specified wind uplift.
3.3 PROTECTION
3.3.1 Protection of Applied Insulation
Completely cover each day's installation of insulation with the finished roofing specified on same day. Do not permit phased construction.
Protect open spaces between insulation and parapets or other walls and spaces at curbs, scuttles, and expansion joints, until permanent roofing and flashing are applied. Do not permit storing, walking, wheeling, or trucking directly on insulation or on roofed surfaces. Provide smooth, clean board or plank walkways, runways, and platforms near supports, as necessary, to distribute weight to conform to indicated live load limits of roof construction. Exposed edges of the insulation shall be protected by cutoffs at the end of each work day or whenever precipitation is imminent.
Cutoffs shall be as directed by roofing manufacturer. Fill all profile voids in cut-offs to prevent entrapping of moisture into the area below the membrane. Cutoffs shall be removed when work is resumed.
3.3.2 Damaged Work and Materials
Restore work and materials that become damaged during construction to original condition or replace with new materials.
3.4 INSPECTION
The Contractor shall establish and maintain an inspection procedure to assure compliance of the installed roof insulation with the contract requirements. Any work found not to be in compliance with the contract shall be promptly removed and replaced or corrected in an approved manner.
Quality control shall include, but not be limited to, the following:
a. Observation of environmental conditions; number and skill level of insulation workers; start and end time of work.
b. Verification of certification, listing or label compliance with
FM P9513.
c. Verification of proper storage and handling of insulation and vapor retarder materials before, during, and after installation.
d. Inspection of vapor retarder application, including edge envelopes and mechanical fastening.
e. Inspection of mechanical fasteners; type, number, length, and spacing.
f. Coordination with other materials, cants, sleepers, and nailing strips.
g. Inspection of insulation joint orientation and laps between layers, joint width and bearing of edges of insulation on deck.
h. Installation of cutoffs and proper joining of work on subsequent days.
SECTION 07 22 00 Page 7
i. Continuation of complete roofing system installation to cover insulation installed same day.
SECTION 07 22 00 Page 8
SECTION 07 42 13
METAL WALL PANELS
01/08
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ALUMINUM ASSOCIATION (AA)
AA ADM1 (2005; Errata 2005) Aluminum Design Manual
AA ASD1 (2009) Aluminum Standards and Data
AMERICAN ARCHITECTURAL MANUFACTURERS ASSOCIATION (AAMA)
AAMA 501.1 (2005) Methods of Test for Exterior Walls
AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)
AISC 341 (2005; Supp 2005) Seismic Provisions for Structural Steel Buildings
AMERICAN IRON AND STEEL INSTITUTE (AISI)
AISI/COS/NASPEC (2001, Supplement 2004) North American Specification for the Design of Cold-Formed Steel Structural Members
AMERICAN SOCIETY OF CIVIL ENGINEERS (ASCE)
ASCE 7-05 (2006; Errata 2007) Minimum Design Loads for Buildings and Other Structures
AMERICAN WELDING SOCIETY (AWS)
AWS D1.2/D1.2M (2008) Structural Welding Code - Aluminum
ASTM INTERNATIONAL (ASTM)
ASTM A 606/A 606M (2009) Standard Specification for Steel Sheet and Strip, High-Strength, Low-Alloy, Hot-Rolled and Cold-Rolled, with Improved Atmospheric Corrosion Resistance
ASTM A 653/A 653M (2009) Standard Specification for Steel Sheet, Zinc-Coated (Galvanized) or Zinc-Iron Alloy-Coated (Galvannealed) by the Hot-Dip Process
ASTM B 117 (2007a) Standing Practice for Operating Salt Spray (Fog) Apparatus
SECTION 07 42 13 Page 1
ASTM B 209 (2007) Standard Specification for Aluminum and Aluminum-Alloy Sheet and Plate
ASTM C 920 (2008) Standard Specification for Elastomeric Joint Sealants
ASTM D 1056 (2007) Standard Specification for Flexible Cellular Materials - Sponge or Expanded Rubber
ASTM D 1308 (2002; R 2007) Effect of Household Chemicals on Clear and Pigmented Organic Finishes
ASTM D 1654 (2008) Evaluation of Painted or Coated Specimens Subjected to Corrosive Environments
ASTM D 1667 (2005) Flexible Cellular Materials - Poly (Vinyl Chloride) Foam (Closed-Cell)
ASTM D 2244 (2007) Calculation of Color Tolerances and Color Differences from Instrumentally Measured Color Coordinates
ASTM D 2247 (2002) Testing Water Resistance of Coatings in 100% Relative Humidity
ASTM D 2794 (1993; R 2004) Resistance of Organic Coatings to the Effects of Rapid Deformation (Impact)
ASTM D 3359 (2009) Measuring Adhesion by Tape Test
ASTM D 3363 (2005) Film Hardness by Pencil Test
ASTM D 4214 (2007) Standard Test Method for Evaluating the Degree of Chalking of Exterior Paint Films
ASTM D 4587 (2005) Standard Practice for Fluorescent UV-Condensation Exposures of Paint and Related Coatings
ASTM D 522 (1993a; R 2008) Mandrel Bend Test of Attached Organic Coatings
ASTM D 523 (2008) Standard Test Method for Specular Gloss
ASTM D 5894 (2005) Cyclic Salt Fog/UV Exposure of Painted Metal, (Alternating Exposures in a Fog/Dry Cabinet and a UV/Condensation Cabinet)
ASTM D 610 (2008) Evaluating Degree of Rusting on Painted Steel Surfaces
SECTION 07 42 13 Page 2
ASTM D 714 (2002e1) Evaluating Degree of Blistering of Paints
ASTM D 822 (2001; R 2006) Filtered Open-Flame Carbon-Arc Exposures of Paint and Related Coatings
A…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .