Replace Well Pumps
Awarded Award Notice Posted
- Solicitation number
- FA3016-17-U-0295
- Agency
- Air Education and Training Command Air Force, Department of Defense
- Awarded
- to WW Peerless, LLC
- Set-aside
- Total Small Business
Opportunity facts
- Contract number
- FA301617P0359 Federal contract award
- NAICS code
- 333911 Pump and Pumping Equipment Manufacturing
- PSC
- Not on record
- Place of performance
- Building 2194 and Building 3186 Joint Base San Antonio, Fort Sam Houston, TX San Antonio, Texas 78234, United States
Notice details come from SAM.gov. Updated .
Notice text
2 versions
Update #2 · Latest ·
Added: Sep 07, 2017 11:38 am
Question and Answers from Site Visit Conducted on 6 September 2017.
1. Question: Concerning Well #1, where the discharge head sits down on the base plate, is that base plate welded to the casing below the concrete floor ? I have attached a picture of both the discharge head and the casing below the concrete slab. We just need to see how the two are attached.
Answer: The base plate is not welded to the concrete floor. It is attached by screws
2. Question: Are you wanting a VFD for this Pump for Well #1?
Answer: No, we do not want a VFD
3. Question: Is it ok to remove the gate valve that is in the ground and cut the casing below the flange that attaches to the gate valve and weld pipe and extend the casing all the way up to the new flange that the new discharge head will be bolting to?
Answer: Do not remove gate valve.
4. Question: Will the power be temporary sealed/turned off while the work is being done? Since we will have a crane next to the power lines?
Answer: Yes, the power will be turned off. The contractor must contact the program manager at the Civil Engineering Squadron to have power cut off from the site. No work can be done until verification that power has been shut down for safety reasons.
Also see attachments on Specifications for both Well#1 and Well #5, as well as a diagram of Well#1
Update #1 ·
Added: Aug 30, 2017 11:19 am
Please see attached Request for Quote and Statement of Work
Please respond to this RFQ no later than 12:00pm on 11 September 2017.
There will be a site visit at Joint Base San Antonio, Fort Sam Houston on 6 September 2017 at 0900. All contractors will meet at the Walters Street Visitors Center. Please review request for quote on site visit instructions, I will need a list of names no later than 5 September at 12:00pm.
All contractors must be registered in Systems for Award Management (SAM)
This is a total small business set aside
Any questions, should be directed to Jack A. Caniglia at (210)671-1721, jack.caniglia.3@us.af.mil or Timothy Hull at (210)671-1717, timothy.hull.6@us.af.mil
Attachments
| File | Type | Posted |
|---|---|---|
| SOW_for_Both_Wells_(2).pdf | ||
| RFQ__-_Well_Pumps.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Replace Well Pumps | Award Notice | |
| Replace Pumps and Motors at Wells | Award Notice |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity