Replace Well Pumps
Added: Aug 30, 2017 11:19 am Please see attached Request for Quote and Statement of WorkPlease respond to this RFQ no later than 12:00pm on 11 September 2017.There will be a site visit at Joint Base San Antonio, Fort Sam Houston on 6 September 2017 at 0900. All contractors will meet at the Walters Street Visitors Center. Please review request for quote on site visit instructions, I will need a list of names no later than 5 September at 12:00pm. All contractors must be registered in Systems for Award Management (SAM)This is a total small business set asideAny questions, should be directed to Jack A. Caniglia at (210)671-1721, jack.caniglia.3@us.af.mil or Timothy Hull at (210)671-1717, timothy.hull.6@us.af.mil FA3016-17-U-0295 Department of the Air Force Air Education and Training Command
Award Notice 2/2 8/30/17, 11:19 AM Replace Pumps and Motors at Wells
Added: Aug 23, 2017 11:12 am PROJECT SCOPE Well #1 Above Ground Pump: The contractor shall furnish all supervision, labor, transportation, materials, tools, incidentals, equipment, personnel and other services necessary to replace above ground pump. Contractor shall remove old steel piping in well #1, Diameter -12 inches and replace with new steel pipe 320 feet with 7 stages along with 150 horsepower motor, speed-1770 RPM Phase-3 Voltage-460V. The pump will be tested to ensure proper operation before acceptance. Contractor shall disconnect and connect all the piping and 7 stage and all the plumbing with electrical. In addition, all services shall be performed in accordance with the latest version of the Uniform Building Code, International Building Code (IBC), Federal, State, local building codes and Texas Administrative Code (Title 30, Part 1, Chapter 334, Subchapter C, Rule 334.49). PROJECT SCOPE Well #5 Submersible Pump: The contractor shall furnish all supervision, labor, transportation, materials, tools, incidentals, equipment and personnel and other services necessary to replace submersible pump. Contractor shall remove old steel piping in well # 5 Diameter-14 inches and replace with new steel pipe 272 feet with 4 stage along with 200 horsepower motor, speed-1750 RPM Phase-3 Voltage-460V. The pump will be tested to ensure proper operation before acceptance. Contractor shall disconnect and connect all piping, submersible 4 stage and all the electrical. Contractor shall install all new pump with pipe and electrical FA3016-17-U-0295 Department of the Air Force Air Education and Training Command
Award Notice 1/2 8/23/17, 11:12 AM