Replace 2 Cooling Towers-FCI Greenville, IL
Closed Pre-Solicitation Posted
Not the latest version. See the latest solicitation from .
- Solicitation number
- VIF30001
- Agency
-
Federal Correctional Institution Greenville
Correctional Facilities, Department of Justice
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
- PSC
- Not on record
- Place of performance
- IL 62246 USA
Notice details come from SAM.gov. Updated .
Notice text
The contractor awarded this project, for the Federal Correctional Institution (FCI) Greenville, is responsible for providing all materials, installation, labor for the 2 new Cooling Towers and other equipment as determined by the COR (Contracting Officer Representative). The contractor is responsible for the following:
• Removing and disposing of the existing 2 Cooling Towers and Motor Control Center (MCC).
• Provide and install 2 new Cooling Towers with stainless steel basins that meet our existing
specifacations.
• Contractor may need to modify their new tower support in order to anchor to our existing
concrete foundation per our existing drawings.
• Provide and install permanently mounted ladders, platform and guard railing for
service or repair on each Cooling Tower.
• Remove existing Motor Control Center and install a new MCC that meets our
existing specifications.
• Provide and install new Variable Frequency Drives (VFD's) in the Motor Control
Center to operate the new Cooling Tower motors.
• Remove existing and install a new 600 amp MCC circuit breaker.
• Remove existing and install 2 new 800 amp chiller circuit breakers.
• New equipment must be connected into our Building Management System and
fully operational.
• Contractor shall provide a manufacturer's warranty, signed by an authorized
representative of the company. The warranty must validate any repair or
replacement of defective materials and labor up to five (5) years at no additional
cost to FBOP. Warranty period shall commence upon notification of successful
Final Acceptance Testing.
Notice history
| Notice | Type | Posted |
|---|---|---|
| Replace 2 Cooling Towers-FCI Greenville, IL | Solicitation | |
| Replace 2 Cooling Towers-FCI Greenville, IL | Pre-Solicitation | |
| This notice | Pre-Solicitation |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity