Rehabilitate Stanley Brook Bridges
Award Notice Posted
- Solicitation number
- P13PS00121
- Agency
-
National Park Service
Department of the Interior
- Awarded
- to R.f. Jordan & Sons Construction, Inc.
- Set-aside
- Total Small Business
Opportunity facts
- Contract number
- INP13PC00215 Federal contract award
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- PSC
- Not on record
Notice details come from SAM.gov. Updated .
Notice text
3 versions
Update #3 · Latest ·
Amendment 4 posted 5/17
The purpose of this amendment is Delete Construction Cost Proposal Sheets 1-6 from the original solicitation, Amendment 00002, and Amendment 00003 and in place thereof, insert revised Construction Cost Proposal Sheets 1-6 as attached hereto. Offerors are responsible for reviewing all calculations prior to submitting a proposal.
IN ADDITION, IN ORDER TO VIEW THE TERMS AND CONDITIONS PERTAINING TO THE BODY OF THIS RFP, OFFERORS WILL FIRST NEED TO SAVE THE .RTF DOCUMENT AS A .PDF PRIOR TO OPENING.
The due date for receipt of proposals remains at 5/24/13 at 2:00 PM local prevailing time.
Contractors are required to sign and date this amendment and return 1 copy with their signed proposal.
Update #2 ·
Amendment 1 posted on 4/23/13:
The purpose of this amendment is to include Attachment 0008 that incorporates, 1) Standard Form 24 (Bid Bond), 2)the attendance list from the site visit that was held at Acadia National Park on 4/19/13, and 3) revised drawings (remove original pages 1 of 12 and 4 of 12 and in place thereof insert revised cover sheet dated 4/13 and Sub Sheet S3).
IN ADDITION, IN ORDER TO VIEW THE TERMS AND CONDITIONS PERTAINING TO THE BODY OF THIS RFP, OFFERORS WILL FIRST NEED TO SAVE THE .RTF DOCUMENT AS A .PDF PRIOR TO OPENING.
The due date for receipt of proposals remains unchanged at 5/9/13 at 2:00 PM local prevailing time.
Contractors are required to sign and date this amendment and return 2 copies with their signed proposal.
Amendment 2 posted on 5/3/13:
The purpose of this amendment is to respond to questions relative to the solicitation as follows:
1) Question: In the project manual on the page entitled "Contract Price Schedule" it lists Bid Option 2, Bridge 1 and Bid Option 2, Bridge 6. Should one of these be Bid Option 1?
Answer: Bridge 1 is Option 1 and Bridge 6 is Option 2. See revised Contract Price Schedule attachment.
2) Question: On the Individual Construction Cost Proposal provided with the original bid documents, bid item #518.60 and 518.70 both have a unit of SF. Bid item #518.61 has a unit of CY. Please confirm this is the correct unit for bid item #518.61.
Answer: #518.61 is cubic yards. #518.60 and 518.70 are square feet. Reference the cited ME DOT Specification 518, pages 5-110 and 111 for pay units of measure.
3) Question: On Sheet #S1, General Note 15 states that Acadia National Park will supply the new shoulder aggregate material for the contractor to install. Will the Park be delivering this material to each bridge as requested by the Contractor and co-ordinated with the Contracting Officer, or will the Contractor need to load and truck the materials themselves from Park stockpiles (similar to the crushed stone aggregate/loam blend noted in General Note #19 on the same sheet)?
Answer:The plans have been revised to redefine "Rehabilitate Existing Shoulder" as uncovering any existing bridge drains and regrading disturbed areas of shoulders with the removed material. Additional material is no longer required for this work. Delete original plans from solicitation and Amendment 0001 and insert revised plans, pages 1-12, dated 5/13/13 as attached.
4) Question: Sheet S5, Bridge Rail Replacement Note #1 states that the timber rails shall be Grade 1 or better cedar. Specification section 06 14 20, 2.1.B states that the timber rails shall be Commercial Grade 2 or better. Please clarify the correct timber rail grade.
Answer: Revise Specification section 06 14 20, 2.1.B to state that the timber rails shall be Commercial Grade 1.
5) Question: Sheet S9 indicates "Reset bank stabilization stones to restore full stream width" as an item for the South bank at the West end of the bridge. There is a cut through the section indicating Section B-B as representing the work required. Section B-B includes the following note: Place item 610.08, Plain Riprap. The Construction Cost Proposal form for Bridge #4 does not have this item on it. Please clarify how this work is to be shown in the proposal.
Answer: Delete Construction Cost Proposal Sheets 1-6 from the original solicitation and in place thereof, insert revised Construction Cost Proposal Sheets 1-6.
6) Question: Sheet S6 indicates "Reset 4'0" +/- deep existing heavy riprap" as an item for the South bank at the East end of the bridge. There is a cut through the section, indicating Section B-B as representing the work required. Section B-B includes the following note: Place item 610.08, Plain Riprap. The Construction Cost Proposal form for Bridge #1 does not have this item on it. Please clarify how this work is to be shown in the proposal.
Answer: Delete Construction Cost Proposal Sheets 1-6 from the original solicitation and in place thereof, insert revised Construction Cost Proposal Sheets 1-6.
IN ADDITION, IN ORDER TO VIEW THE TERMS AND CONDITIONS PERTAINING TO THE BODY OF THIS RFP, OFFERORS WILL FIRST NEED TO SAVE THE .RTF DOCUMENT AS A .PDF PRIOR TO OPENING.
The due date for receipt of proposals is hereby extended to 5/16/13 at 2:00 PM local prevailing time.
Contractors are required to sign and date this amendment and return 1 copy with their signed proposal.
Amendment 3 posted 5/15/13:
The purpose of this amendment is to Delete Construction Cost Proposal Sheets 1-6 from the original solicitation and Amendment 000002 and in place thereof, insert revised Construction Cost Proposal Sheets 1-6.
IN ADDITION, IN ORDER TO VIEW THE TERMS AND CONDITIONS PERTAINING TO THE BODY OF THIS RFP, OFFERORS WILL FIRST NEED TO SAVE THE .RTF DOCUMENT AS A .PDF PRIOR TO OPENING.
The due date for receipt of proposals is hereby extended to 5/24/13 at 2:00 PM local prevailing time.
Contractors are required to sign and date this amendment and return 1 copy with their signed proposal.
Click here to see more information about this opportunity on FedConnect
https://www.fedconnect.net/FedConnect/
Update #1 ·
REHABILITATE STANLEY BROOK BRIDGES at Acadia National Park, Bar Harbor, Maine
Preproposal Conference:
Date: 04/19/2013
Time: 1000
Location: Acadia National Park, Seal Harbor, Maine
A site visit is scheduled for all interested parties on Friday, April 19, 2013 at 10:00 AM, local prevailing time. Participants shall meet in the parking lot located at the south end of the work site at the intersection of Route 3 and Stanley Brook Road in Seal Harbor, ME. Please confirm your attendance by contacting Clayton Gilley at 207/812-8989.
Click here to see more information about this opportunity on FedConnect
https://www.fedconnect.net/FedConnect/
Notice history
| Notice | Type | Posted |
|---|---|---|
| Rehabilitate stanley brook bridges | Award Notice | |
| This notice | Award Notice |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity