Rehab LPK water distribution system

Closed Solicitation Posted

Solicitation number
140P5422R0013
Agency
Southeast Region National Park Service, Department of the Interior
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
221310 Water Supply and Irrigation Systems
PSC
Y1NZ Construction Of Other Utilities
Place of performance
Homestead, Florida 33034, United States

Notice details come from SAM.gov. Updated .

About this opportunity

This solicitation seeks rehabilitation of the water distribution system at Long Pine Key in Everglades National Park. The National Park Service Southeast Region seeks to replace approximately 7,500 linear feet of water main along with associated valves, fittings and hydrants through a fixed-price contract awarded to a small business. Proposals are due July 11, 2022 and will be evaluated based on technical approach, past performance on similar projects, and price. The selected contractor must complete all work within 180 days of the notice to proceed and in compliance with historic preservation standards.

The opportunity is set aside for total small businesses and involves rehabilitation through replacement of water lines and valves at Long Pine Key in Homestead, Florida, with a budget between $500,000 to $1,000,000. The work includes replacing 7,500 linear feet of water main and is subject to prevailing wage requirements and must adhere to restrictions from November through April to avoid disturbing wildlife during critical seasons.

Notice text

4 versions

Update #4 · Latest ·

The purpose of this amendment is to post the final, second set of Questions (with Answers and Corresponding Documentation) on this posting. All other terms and conditions remain the same.

Update #3 ·

The purpose of this amendment is to extend this posting until July 11, 2022 at 11am Eastern. There will be a second set of questions (with answers) posted to this solicitation shortly. Also, this amendment includes the full "Basis of Design Report" Attachment. All other terms and conditions remain the same.

Update #2 ·

The purpose of this amendment is to post the Questions (and corresponding answers) received on this posting. All other terms and conditions remain the same. The posting has not been extended.

Update #1 ·

REHAB WATER DISTRIBUTION SYSTEM AT LONG PINE KEY IN EVERGLADES NATIONAL PARK

Attachments

Files attached to this notice, newest first
File Type Posted
Sol_140P5422R0013_Amd_0003.pdf PDF
Questions_Part_2_0003.docx DOCX document
013591_Historic_Preservation_Treatment_Procedures_0003.pdf PDF
EVER_158018_BASIS_OF_DESIGN_REPORT__0002.pdf PDF
Sol_140P5422R0013_Amd_0002.pdf PDF
Questions___Answers_0001.docx DOCX document
Sol_140P5422R0013_Amd_0001.pdf PDF
SOL_Wage_Rates.pdf PDF
A06_2022-03-30_EVER_158018_LPK_-_FINAL_SD_Drawings_-_SEALED.pdf PDF
B09_QUESTIONNAIRE.pdf PDF
Sol_140P5422R0013.pdf PDF
2__Statement_of_Work__.pdf PDF
Show all 12

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity