Questions___Answers_0001.docx

DOCX document 15 KB Posted

Attached to
REHAB LPK WATER DISTRIBUTION SYSTEM Federal contract opportunity
Solicitation number
140P5422R0013
Issued by
Department of the Interior National Park Service Southeast Region

About this file

This document contains questions and answers related to a federal contract opportunity to rehabilitate the water distribution system at Long Pine Key in Everglades National Park. The opportunity involves repairing and replacing water fountains, using HDPE butt or electrofusion welded joints for pipe connections as certified by the manufacturer, and laying pipe in trenches no smaller than 8 inches for straight runs while using smaller trenches for valves or connections. Only an NPDES Generic Permit for Stormwater Discharge from Large and Small Construction Activities permit is required and will be the responsibility of the contractor to obtain. The related federal contract opportunity is solicitation number 140P5422R0013 from the Department of the Interior National Park Service Southeast Region for rehabilitation of the water distribution system at the park.

View the file

Other files for this federal contract opportunity

Other files attached to REHAB LPK WATER DISTRIBUTION SYSTEM, newest first.
File Type Posted
Sol_140P5422R0013_Amd_0003.pdf PDF
Questions_Part_2_0003.docx DOCX document
013591_Historic_Preservation_Treatment_Procedures_0003.pdf PDF
EVER_158018_BASIS_OF_DESIGN_REPORT__0002.pdf PDF
Sol_140P5422R0013_Amd_0002.pdf PDF
Sol_140P5422R0013_Amd_0001.pdf PDF
B09_QUESTIONNAIRE.pdf PDF
Sol_140P5422R0013.pdf PDF
SOL_Wage_Rates.pdf PDF
A06_2022-03-30_EVER_158018_LPK_-_FINAL_SD_Drawings_-_SEALED.pdf PDF
2__Statement_of_Work__.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions/ Answers

1) In SOW, under sections 2.5 and 3.1.5, permits are mentioned. For another job I have involving an SFWMD levee, the permitting via SFWMD to USACE has been excessively long. USACE civil reached out for USACE's archeologist as well FWS consultancy. What permits will NPS provide and what other permits will the contractor be required to obtain?

a. Only a NPDES Generic Permit for Stormwater Discharge from Large and Small Construction Activities permit is required and is the Contractors responsibility.

2) I write to make an inquiry on HDPE pipe connectors. I have copied the following sample pipe connections from the drawing. Can you please clarify the connectors between HDPE pipes are HDPE mold elbows or flanged elbows?

a. We expect HDPE Butt or Electrofusion Welded joints, and the person joining the pipe sections should be certified to do so per manufacturers procedure. Fittings for HDPE use per manufacturer, will be required. Specifications have additional details.

3) Could it be possible to use a smaller trench ie 8 in for the straight runs of pipe and open small trenches for valves or connections?

a. No.

4) Are water fountains supposed to be replaced or can existing ones be used?

a. Water fountains are to be repaired, there is one that is missing and must be replaced per drawing detail.

5) Diameter of the existing water line(s)

a. 4-inch