Recovery--z--repair hot loop 2009 phase, fort irwin, CA
Award Notice Posted
- Solicitation number
- W912PL-09-D-0036-0002
- Agency
-
ENDIST Los Angeles
US Army Corps of Engineers, Department of Defense
- Awarded
- to Alberto Luna Construction, Inc.
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- W912PL-09-D-0036-0002 Federal contract award
- NAICS code
- 236210 Industrial Building Construction
- PSC
- Not on record
Notice details come from SAM.gov. Updated .
Notice text
2 versions
Update #2 · Latest ·
This contract action was accomplished using other than competitive procedures because this is an order under an existing contract that was awarded using non-competitive procedures.
The Los Angeles District has a requirement to repair the Hot/Chilled Loop Feed System at Ft. Irwin, CA to include removal of concrete walkway or existing piping. Installation of new concrete vaults, concrete material, reinforcement, and trench floor grade, excavation and compaction of existing base floor to 90% density, installation of new copper tubing, fittings, and valves. Piping shall be insulated with Phenolic Foam or equal. Borrow pits may be used by contractor. Install concrete for the slab on grade, trench walls, and trench covers
Update #1 ·
RECOVERY--THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY. THIS OPPORTUNITY IS AVAILABLE ONLY TO CONTRACTORS UNDER W912PL-09-D-0036-0002.
THIS IS NOT A SOLICITATION.
This contract action will be accomplished by using other than competitive procedures in accordance with FAR 6.302-5(b)(4) for sole source awards under the 8(a) program 15 U.S.C.637 and in accordance with FAR 19.805-1(b)(2). It is the intent of the Government to award a task order under an existing IDIQ Contract. The task order is firm fixed price.
Alberto Luna Construction, Inc., Ojai, CA. This is not a solicitation. The Los Angeles District has a requirement to repair the Hot/Chilled Loop Feed System at Ft. Irwin, CA to include removal of concrete walkway or existing piping. Installation of new concrete vaults, concrete material, reinforcement, and trench floor grade, excavation and compaction of existing base floor to 90% density, installation of new copper tubing, fittings, and valves. Piping shall be insulated with Phenolic Foam or equal. Borrow pits may be used by contractor. Install concrete for the slab on grade, trench walls, and trench covers