Recovery-North Fork John Day Wilderness Trails Restoration

Award Notice Posted

Solicitation number
AG-0489-S-10-0252
Agency
Awarded
to Clearway Services LLC
Set-aside
No set-aside

Opportunity facts

Contract number
AG0489C100323 Federal contract award
PSC
Not on record
Place of performance
North Fork John Day Ranger District Umatilla National Forest Box 158 Ukiah, Oregon 97880, United States

Notice details come from SAM.gov. Updated .

Notice text

3 versions

Update #3 · Latest ·

Due to the late snow pack limiting access to this trail, the solicitation period is extended to 1500 hours, June 3, 2010.



Davis-Bacon Wage Decision No. OR20100081 dated 04/23/2010 are in effect as attached.



Acknowledgement of Amendment #1 is required.

Update #2 ·

This is an American Recovery and Reinvestment Act of 2009 (ARRA) Procurement.



The U.S. Forest Service, EROC-NW servicing Region 6 has a requirement to restore approximately 7.3 miles (and optional 2.5 miles) of existing wilderness stock trail within the North Fork John Day River Wilderness. Work consists of existing trail restoration, clearing and brushing, excavation and embankment, log out, check dams, berm and slough removal, rock removal, drainage structures, switchbacks and shallow stream crossings. No motorized equipment is permitted.



A negotiated, firm, fixed-price contract is contemplated requiring submission of a price proposal and completion of a "Questionnaire".



The magnitude of construction is between $100,000 and $250,000.



The performance period requires the project to be completed by September 30, 2011.



This procurement is unrestricted (open to all offerors) under FAR Subpart 19.10 - The Small Business Competitiveness Demonstration Program Act of 1988. Contractors are required to be registered with the Central Contractor Registration (CCR) and the On-line Representations and Certifications Application (ORCA).



The solicitation with specifications, drawings and wage rates is expected to be posted to the https://www.fbo.gov/ website within the next 45 days. No hard copies of the solicitation and applicable amendments will be mailed or issued. To receive the solicitation package (Request for Proposal) and any applicable amendments, offerors must download them from the aforementioned website.



Due to the late snow pack limiting access to this trail, the solicitation period is extended 30 additional days - now due 1500 hours, May 5, 2010.



Typical photos are attached for your review but may not reflect exact trail conditions.



Acknowledgement of this amendment is not required.

Update #1 ·

This is an American Recovery and Reinvestment Act of 2009 (ARRA) Procurement.



The U.S. Forest Service, EROC-NW servicing Region 6 has a requirement to restore approximately 7.3 miles (and optional 2.5 miles) of existing wilderness stock trail within the North Fork John Day River Wilderness. Work consists of existing trail restoration, clearing and brushing, excavation and embankment, log out, check dams, berm and slough removal, rock removal, drainage structures, switchbacks and shallow stream crossings. No motorized equipment is permitted.



A negotiated, firm, fixed-price contract is contemplated requiring submission of a price proposal and completion of a "Questionnaire".



The magnitude of construction is between $100,000 and $250,000.



The performance period requires the project to be completed by September 30, 2011.



This procurement is unrestricted (open to all offerors) under FAR Subpart 19.10 - The Small Business Competitiveness Demonstration Program Act of 1988. Contractors are required to be registered with the Central Contractor Registration (CCR) and the On-line Representations and Certifications Application (ORCA).



The solicitation with specifications, drawings and wage rates is expected to be posted to the https://www.fbo.gov/ website within the next 45 days. No hard copies of the solicitation and applicable amendments will be mailed or issued. To receive the solicitation package (Request for Proposal) and any applicable amendments, offerors must download them from the aforementioned website.

Files

File Type Posted
NF JohnDay Wages2.doc DOC document
NF JohnDay Amend1.pdf PDF
NFJD FK_324 78.JPG JPG image
NFJDFK_318 42.JPG JPG image
NFJD FK_131 20.JPG JPG image
NFJDFK_282 32.JPG JPG image
NFJD FK_280 28_2.JPG JPG image
NFJD FK_133 51.JPG JPG image
NFJD FK_234 83.JPG JPG image
NF JohnDay Dwg1of7.pdf PDF
NF JohnDay ARRA Signs.pdf PDF
NF JohnDay Dwg6of7.pdf PDF
NF JohnDay ProjectMap.pdf PDF
NF JohnDay Kr PerformData Sheet.doc DOC document
NF JohnDay Dwg2of7.pdf PDF
NF John Day Dwg 7of7.pdf PDF
NF JohnDay Wage Rates.doc DOC document
NF JohnDay GenSpecs.pdf PDF
NF JohnDay Dwg4of7.pdf PDF
NF JohnDay Dwg5of7.pdf PDF
NF JohnDay SF1442.pdf PDF
NF JohnDay TrailsMap.pdf PDF
NF JohnDay Fire SptRqts.doc DOC document
NF JohnDay Dwg 3of7.pdf PDF
NF JohnDay Sol'n Pkg.doc DOC document
Show all 25

Notice history

Notice Type Posted
Recovery - NF john day non-motorized trails restoration Latest Award Notice
This notice Original Award Notice

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity