Recovery-North Fork John Day Wilderness Trails Restoration
Award Notice Posted
- Solicitation number
- AG-0489-S-10-0252
- Agency
-
Operations Center Northwest
Economic Recovery Operations, Department of Agriculture
- Awarded
- to Clearway Services LLC
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- AG0489C100323 Federal contract award
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- PSC
- Not on record
- Place of performance
- North Fork John Day Ranger District Umatilla National Forest Box 158 Ukiah, Oregon 97880, United States
Notice details come from SAM.gov. Updated .
Notice text
3 versions
Update #3 · Latest ·
Due to the late snow pack limiting access to this trail, the solicitation period is extended to 1500 hours, June 3, 2010.
Davis-Bacon Wage Decision No. OR20100081 dated 04/23/2010 are in effect as attached.
Acknowledgement of Amendment #1 is required.
Update #2 ·
This is an American Recovery and Reinvestment Act of 2009 (ARRA) Procurement.
The U.S. Forest Service, EROC-NW servicing Region 6 has a requirement to restore approximately 7.3 miles (and optional 2.5 miles) of existing wilderness stock trail within the North Fork John Day River Wilderness. Work consists of existing trail restoration, clearing and brushing, excavation and embankment, log out, check dams, berm and slough removal, rock removal, drainage structures, switchbacks and shallow stream crossings. No motorized equipment is permitted.
A negotiated, firm, fixed-price contract is contemplated requiring submission of a price proposal and completion of a "Questionnaire".
The magnitude of construction is between $100,000 and $250,000.
The performance period requires the project to be completed by September 30, 2011.
This procurement is unrestricted (open to all offerors) under FAR Subpart 19.10 - The Small Business Competitiveness Demonstration Program Act of 1988. Contractors are required to be registered with the Central Contractor Registration (CCR) and the On-line Representations and Certifications Application (ORCA).
The solicitation with specifications, drawings and wage rates is expected to be posted to the https://www.fbo.gov/ website within the next 45 days. No hard copies of the solicitation and applicable amendments will be mailed or issued. To receive the solicitation package (Request for Proposal) and any applicable amendments, offerors must download them from the aforementioned website.
Due to the late snow pack limiting access to this trail, the solicitation period is extended 30 additional days - now due 1500 hours, May 5, 2010.
Typical photos are attached for your review but may not reflect exact trail conditions.
Acknowledgement of this amendment is not required.
Update #1 ·
This is an American Recovery and Reinvestment Act of 2009 (ARRA) Procurement.
The U.S. Forest Service, EROC-NW servicing Region 6 has a requirement to restore approximately 7.3 miles (and optional 2.5 miles) of existing wilderness stock trail within the North Fork John Day River Wilderness. Work consists of existing trail restoration, clearing and brushing, excavation and embankment, log out, check dams, berm and slough removal, rock removal, drainage structures, switchbacks and shallow stream crossings. No motorized equipment is permitted.
A negotiated, firm, fixed-price contract is contemplated requiring submission of a price proposal and completion of a "Questionnaire".
The magnitude of construction is between $100,000 and $250,000.
The performance period requires the project to be completed by September 30, 2011.
This procurement is unrestricted (open to all offerors) under FAR Subpart 19.10 - The Small Business Competitiveness Demonstration Program Act of 1988. Contractors are required to be registered with the Central Contractor Registration (CCR) and the On-line Representations and Certifications Application (ORCA).
The solicitation with specifications, drawings and wage rates is expected to be posted to the https://www.fbo.gov/ website within the next 45 days. No hard copies of the solicitation and applicable amendments will be mailed or issued. To receive the solicitation package (Request for Proposal) and any applicable amendments, offerors must download them from the aforementioned website.
Files
| File | Type | Posted |
|---|---|---|
| NF JohnDay Wages2.doc | DOC document | |
| NF JohnDay Amend1.pdf | ||
| NFJD FK_324 78.JPG | JPG image | |
| NFJDFK_318 42.JPG | JPG image | |
| NFJD FK_131 20.JPG | JPG image | |
| NFJDFK_282 32.JPG | JPG image | |
| NFJD FK_280 28_2.JPG | JPG image | |
| NFJD FK_133 51.JPG | JPG image | |
| NFJD FK_234 83.JPG | JPG image | |
| NF JohnDay Dwg1of7.pdf | ||
| NF JohnDay ARRA Signs.pdf | ||
| NF JohnDay Dwg6of7.pdf | ||
| NF JohnDay ProjectMap.pdf | ||
| NF JohnDay Kr PerformData Sheet.doc | DOC document | |
| NF JohnDay Dwg2of7.pdf | ||
| NF John Day Dwg 7of7.pdf | ||
| NF JohnDay Wage Rates.doc | DOC document | |
| NF JohnDay GenSpecs.pdf | ||
| NF JohnDay Dwg4of7.pdf | ||
| NF JohnDay Dwg5of7.pdf | ||
| NF JohnDay SF1442.pdf | ||
| NF JohnDay TrailsMap.pdf | ||
| NF JohnDay Fire SptRqts.doc | DOC document | |
| NF JohnDay Dwg 3of7.pdf | ||
| NF JohnDay Sol'n Pkg.doc | DOC document |
Show all 25
Notice history
| Notice | Type | Posted |
|---|---|---|
| Recovery - NF john day non-motorized trails restoration | Award Notice | |
| This notice | Award Notice |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity