RECOVERY - MXDP091030 - Energy-Install Capacitor System for Power Factor Conversion

Award Notice Posted

Solicitation number
RAND-08-K-2548(MXDP-09-1030)
Agency
Awarded
to Toltest, Inc.
Set-aside
No set-aside

Opportunity facts

Contract number
FA3002-08-D-0012-0011 Federal contract award
NAICS code
238210 Electrical Contractors and Other Wiring Installation Contractors
PSC
Not on record
Place of performance
Laughlin AFB Laughlin AFB, Texas, United States

Notice details come from SAM.gov. Updated .

Notice text

3 versions

Update #3 · Latest ·

MODIFICATIO 09, 17 May 10, removed this (Power Factor) work, except for initial meeting(s) and design work, because work is to be accomplished as part of utilities privatization (not ARRA funded).  Actual price of work that was completed using ARRA funding: $13,892.47.

Update #2 ·

ARRA funded modification against an existing SATOC task order for Energy Power Factor correction work bring power factor up to +95%.

Update #1 ·

RECOVERY - "In compliance with the transparency and accountability requirements associated with the supplemental appropriations provided by the American Recovery and Re-Investment Act of 2009, Pub.L. 111-5, the Government posts this presolicitation notice of intent to issue a task order MODIFICATION under an established Indefinite Delivery Indefinite Quantity (IDIQ) type contract task order with Toltest, Inc., a Prime Contractors presently assigned to the Sustainment, Restoration & Modernization Acquisition Task Order Contract (SATOC), which is operated by HQ AETC CONS LGCT Office, c/o HQ AFCESA CONS CEKC at Tyndall AFB, FL. Toltest, Inc., was previously issued the task order to be modified. This notice is provided for INFORMATION PURPOSES ONLY.



This task order modification calls for installation of power factor correcting load bank capacitors necessary to bring Laughlin AFBs electrical utility power factor up to a level where it remains above 95%. Work will also include the installation of load bank capacitors and associated hardware (and software, if necessary) and conductors. The Government intends to issue a task order modification to Toltest, Inc., one of the SATOC Prime Contractors under the SATOC IDIQ, against the existing task order. Toltest, Incs., main point of contact is as follows--Companies interested in subcontracting opportunities should contact the POC listed:

SATOC Toltest, Inc Ernest Enrique 419-794-3596 Ernest.enrique@toltest.com



The purpose of this project is to install power factor correcting load bank capacitors necessary to bring Laughlin AFBs electrical utility power factor up to a level where it remains above 95%. The contractor shall provide all engineering, labor, equipment, and materials to install power factor correcting load bank capacitors. Work will include a technical study to determine the ideal quantity, sizes, and locations of capacitor banks necessary to bring Laughlin AFBs power factor up to a point where it is always above 95%. Work will also include the installation of load bank capacitors and associated hardware (and software, if necessary) and conductors.