RECOVERY--C--Services Systemwide Model QA/QC Review

Award Notice Posted

Solicitation number
W912P807D0060
Agency
Awarded
to FTN Associates, LTD.
Set-aside
No set-aside

Opportunity facts

Contract number
W912P8-07-D-0060-0006 Federal contract award
NAICS code
541330 Engineering Services
PSC
Not on record
More information

Notice details come from SAM.gov. Updated .

Notice text

This contract action was accomplished using other than competitive procedures because this is a task/delivery order where an exception to fair opportunity requirements was approved as this is a follow-on order to a competitive initial order (FAR 8.405-6(b)(2) or 16.505(b)(2)(iii).

This notice is for information purposes only. This opportunity is available only to FTN Associates Ltd under contract W912P8-07-D-0060: Quality Assurance and Quality Control Review of the Morganza to the Gulf Systemwide TABS-MD Model Alternatives.

The U.S. Army Corps of Engineers, Mississippi Valley Division, New Orleans District (MVN), requires a contractor to perform quality assurance and quality control review of a TABS-MD model (hydrodynamic and salinity analyses) for the Morganza to the Gulf Hurricane Protection Projects completed by Engineering Research and Development Center (ERDC).

Morganza, Louisiana, to the Gulf of Mexico Hurricane Protection Project is located approximately 60 miles south of New Orleans, and includes portions of Terrebonne and Lafourche Parishes. The area is bounded on the west by Bayou Du Large and State Highway 311 and on the east by Bayou Lafourche and on the south by the Gulf of Mexico. The purpose of the Hurricane Protection Project is to reduce hurricane and flood damages in an environmentally sustainable manner in the Houma area and protect development and the remaining fragile marsh from hurricane storm surge.

FTN has already provided QA\QC review comments for the Morganza to the Gulf Systemwide TABS-MD existing conditions model that was prepared by ERDC for the Hurricane Protection Project. The model analyzes hydrodynamic and salinity in the study area. The existing conditions model will be revised according to FTNs comments and boundary conditions provided in a previous task order. ERDC will complete a proposed conditions model that reflects the proposed levee alignment in place with the alternatives that were determined by the Habitat Evaluation Team (HET).


Notice history

Notice Type Posted
This notice Latest Award Notice
RECOVERY--C--Services Systemwide Model QA/QC Review Original Award Notice

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity