Quemado Office Roof Replacement
Closed Solicitation Posted
- Solicitation number
- 12837120Q0224
- Agency
- Region 3 - Southwestern Region Forest Service, Department of Agriculture
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 238160 Roofing Contractors
- PSC
- 5650 Roofing And Siding Materials
- Place of performance
- NM 87829 USA
Notice details come from SAM.gov. Updated .
Notice text
2 versions
Update #2 · Latest ·
Award Notice - Contract 12837120C0131 awarded in amount of $24,000.00 to ALERT INC. , 1355 E. Calle De Caballos, Tempe, AZ 85282.
PROJECT TITLE/LOCATION:Quemado Office Roof Replacement
is located in Quemado, New Mexico 87829.
*Site Visit* Monday, September 14, 2020 10:00 AM local. We’ll meet at Quemado District Office. Location is at 1 Forest Service Rd 13 , Quemado, New Mexico 87829.
POC: Name: Harley Allsup. 520-404-3728. harley.allsup@usda.gov
*Solicitation Closes on September 28, 2020 @ 1000 MST.
Contracting Officer: Columbus Campbell, Cell number: (609) 760-7587, E-mail: columbus.campbell@usda.gov
In accordance with FAR 36.204(f), the construction magnitude of this project is estimated between $25,000 and $100,000. NAICS: 238160 SIZE STANDARD: $16.5M TOTAL SMALL BUSINESS SET ASIDE
Scope of Work:
DEMOLITION: Work shall include removal of existing roofing. The Shop has an existing metal roofing and the Old Office has shingles. Care shall be taken to ensure no damage is done to surrounding penetrations or other items on the roof.
DECKING: Upon completion of demolition, any required decking which is suitable for metal roof overlayment, shall be properly installed for new metal roof.
NEW ROOF INSTALLATION: Upon completion of demolition and inspection / replacement of decking, contractor shall install a new brown metal roof as described in specifications. All roofing shall be secure and prevent water penetration. All roofing shall include provisions for penetrations. Included with new metal roof shall be a synthetic polypropylene underlayment as recommended by manufacturer. For shop roof, all existing skylights (12 total) shall be adequately decked over and covered with new roof. Any penetrations no longer needed shall also be covered with new roofing. Contractor shall replace all trim associated with roof such as the facia and soffits and it shall be brown in color, a minimum of 24 gauge.
Update #1 ·
PROJECT TITLE/LOCATION:Quemado Office Roof Replacement
is located in Quemado, New Mexico 87829.
*Site Visit* Monday, September 14, 2020 10:00 AM local. We’ll meet at Quemado District Office. Location is at 1 Forest Service Rd 13 , Quemado, New Mexico 87829.
POC: Name: Harley Allsup. 520-404-3728. harley.allsup@usda.gov
*Solicitation Closes on September 28, 2020 @ 1000 MST.
Contracting Officer: Columbus Campbell, Cell number: (609) 760-7587, E-mail: columbus.campbell@usda.gov
In accordance with FAR 36.204(f), the construction magnitude of this project is estimated between $25,000 and $100,000. NAICS: 238160 SIZE STANDARD: $16.5M TOTAL SMALL BUSINESS SET ASIDE
Scope of Work:
DEMOLITION: Work shall include removal of existing roofing. The Shop has an existing metal roofing and the Old Office has shingles. Care shall be taken to ensure no damage is done to surrounding penetrations or other items on the roof.
DECKING: Upon completion of demolition, any required decking which is suitable for metal roof overlayment, shall be properly installed for new metal roof.
NEW ROOF INSTALLATION: Upon completion of demolition and inspection / replacement of decking, contractor shall install a new brown metal roof as described in specifications. All roofing shall be secure and prevent water penetration. All roofing shall include provisions for penetrations. Included with new metal roof shall be a synthetic polypropylene underlayment as recommended by manufacturer. For shop roof, all existing skylights (12 total) shall be adequately decked over and covered with new roof. Any penetrations no longer needed shall also be covered with new roofing. Contractor shall replace all trim associated with roof such as the facia and soffits and it shall be brown in color, a minimum of 24 gauge.
Attachments
| File | Type | Posted |
|---|---|---|
| Sol_12837120Q0224.pdf | ||
| QuemadoRoofSOI.pdf | ||
| Exhibit_1_QuemadoRoofSOW.pdf | ||
| Exhibit_3_Site Map Quemado.pdf | ||
| Exhibit_4_WD_NM20200013.pdf | ||
| Exhibit_2_SPECS.pdf |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity