Exhibit_1_QuemadoRoofSOW.pdf
PDF 226 KB Posted
- Attached to
- Quemado Office Roof Replacement Federal contract opportunity
- Solicitation number
- 12837120Q0224
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_12837120Q0224.pdf | ||
| Exhibit_4_WD_NM20200013.pdf | ||
| QuemadoRoofSOI.pdf | ||
| Exhibit_2_SPECS.pdf | ||
| Exhibit_3_Site Map Quemado.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work Quemado Roofs
Quemado District Office Gila National Forest
Project Scope: Work for the Quemado Old Office and Shop roofs shall include demolition and disposal of existing roofs of each building. Demolition will may include decking which has been damaged for replacement. Any damaged decking shall be brought to the attention of the COR and additional repairs may be needed. Once sub-roofing is in acceptable shape, contractor shall replace with new metal roofing, brown in color on each building. Included with new metal roof shall be a synthetic polypropylene underlayment as recommended by manufacturer. Work shall also include provisions for all penetrations and all other trim as required for a complete roof replacement. Contractor shall replace existing fascia with new metal fascia. For the shop roof, existing skylights shall be covered with new roof with no skylights left upon completion. Any existing penetrations which are not needed shall be abandoned and roofed over. Approximate roof dimensions of shop roof is 1,950 SF and Old Office is 880 SF (to be verified by contractor).
Background: The existing roofs on each building are showing signs of leaking and need of replacement.
Locations: This project will take place near the Quemado District Office. Location is at 1 Forest Service Rd 13 , Quemado, New Mexico.
TASKS
The (Contractor) shall provide all labor, materials, tools, equipment, services, testing, supervision and incidentals necessary to perform the work as described:
DEMOLITION: Work shall include removal of existing roofing. The Shop has an existing metal roofing and the Old Office has shingles. Care shall be taken to ensure no damage is done to surrounding penetrations or other items on the roof. Any damage shall be repaired. Contractor shall, upon removal of roofing, inspect existing decking and remove all damaged decking for replacement for a proper underlayment for new metal roof. Any damaged decking shall be reported to the COR prior to removal and an agreed upon change order price shall be used for replacement of decking.
DECKING: Upon completion of demolition, any required decking which is suitable for metal roof overlayment, shall be properly installed for new metal roof. Any decking required shall be brought to the attention of the COR and an agreed upon change order price shall be instituted prior to replacement.
NEW ROOF INSTALLATION: Upon completion of demolition and inspection / replacement of decking, contractor shall install a new brown metal roof as described in specifications. All roofing shall be secure and prevent water penetration. All roofing shall include provisions for penetrations. Included with new metal roof shall be a synthetic polypropylene underlayment as recommended by manufacturer. For shop roof, all existing skylights (12 total) shall be adequately decked over and covered with new roof.
Any penetrations no longer needed shall also be covered with new roofing. Contractor shall replace all trim associated with roof such as the facia and soffits and it shall be brown in color, a minimum of 24 gauge.
PRE-BID AND PRE-WORK MEETING
A pre-bid meeting will be 14 SEP 2020 Location is at 1 Forest Service Rd 13 , Quemado, New Mexico.
POC Harley Allsup, 520-404-3728, Harley.allsup@usda.gov. Also Interested contractors are encouraged to visit the site and research site locations on Google Earth™ or similar mapping applications to fully understand logistics and travel time to and from all sites. Contractor is also encouraged to visit the site to make any detailed measurements and familiarize with existing conditions. Any questions about the location and or logistics can be asked during the solicitation period.
CONTRACT TIME
Contractor will be expected to be available to perform field work within 7 days of Notice to Proceed.
This project requires the Contractor to finish all field work within 30 calendar days after commencing field work. Contractor shall procure all necessary construction items prior to commencing site work to minimize disruption to service.
All requirements and deliverables within the statement of work shall be completed within 30 calendar days of Notice to Proceed.
CONTACTS
The Contractor shall submit and/or coordinate all deliverables to the following Government representatives.
The Contractor shall contact the OSC/Project Inspector prior to commencing the project and also to schedule/coordinate pre-work site visits and field work.
OSC/Project Inspector (PI):
TBD
Title Gila National Forest Address Direct Phone # Email:
Contracting Officer’s Representative:
Harley Allsup Title: Facilities / Project Engineer Gila National Forest Address: 3005 E. Camino del Bosque, Silver City, NM
Direct Phone # 520-404-3728 Email: Harley.allsup@usda.gov mailto:Harley.allsup@usda.gov
APPENDIX A - PHOTOS
Quemado Shop
Quemado Old Office
APPENDIX B - DRAWINGS