Permanent Culvert Improvements Project at Allegheny River Lock and Dam 4
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- W911WN23B8000
- Agency
-
ENDIST Pittsburgh
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- Woman-Owned Small Business
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
Notice details come from SAM.gov. Updated .
About this opportunity
The US Army Corps of Engineers, Pittsburgh District, issued solicitation number W911WN23B8000 seeking a contractor to complete permanent culvert improvements at Allegheny River Lock and Dam No. 4. The work includes relocating an enclosed stream, decommissioning and restoring various features, installing a reinforced concrete box culvert and cured-in-place pipe lining, and executing work associated with the lock land wall vault hatch, esplanade electrical utility trench, and esplanade trench drain. Questions were due by July 13, 2023, with bids due by August 3, 2023, to be evaluated based on technical qualifications and price.
This woman-owned small business set-aside procurement has a place of performance in Harrison Township, Allegheny County, Pennsylvania. The NAICS code is 237990 and PSC code is C211. Green World Contracting Corp. provided the lowest bid of $1,641,497.23. The solicitation seeks permanent culvert repairs to ensure continued operation of the lock and dam over an estimated one-year performance period, with a government estimate of $2,943,657 and higher bids from Kovilic Construction Company, Inc. at $4,895,016 and Cedarville Engineering Group, LLC at $5,484,767.
Notice text
3 versions
Update #3 · Latest ·
The US Army Corps of Engineers, Pittsburgh District, has a requirement that involves permanently relocating an enclosed stream on Government property to ultimately travel via gravity through the penstock of the lock land wall and into the Allegheny River, as well as associated decommissioning and/or restoration efforts pertaining to a variety of features to varying degrees. The Allegheny River Lock and Dam No. 4 Permanent Culvert Improvements Project (Project)generally involves the following:? Provide a three-foot (height) by four-foot (width) reinforced concrete box culvert and connect to each an existing junction box and the existing vault of the lock land wall, via open trench and/or shored construction, to permanently relocate the corresponding stream through these features and into the lock land wall penstock, while providing various lock land wall structural counterweight measures;? Decommission various features to varying degrees (i.e. remove and dispose off-site, remove and turn over to the Government, grout fill and abandon in-place, etc.) including but not limited to 36-inch diameter vitrified clay pipe culverts, temporary diversion of water system, various stormwater features, junctions, and various concrete pavement structures;? Restore and/or install various features to varying degrees including but not limited to stormwater features (i.e. culverts, junction boxes, yard inlets, roof downspouts, etc.), concrete pavement structures (i.e. driveways, curbs and gutters, esplanade, sidewalk, etc.), and fences;? Install cured-in-place pipe (CIPP) lining of 36-inch diameter vitrified clay pipe culverts;? Execute work associated with each the lock land wall vault hatch cover plate support system (including providing new support brackets, new recessed ledge angle, new angle brackets, etc.), part of the esplanade electrical utility trench (remove and replace, and maintain utilities during construction), and part of the esplanade trench drain (remove and replace);? Execute various measures to facilitate work including traffic control, diversion of water, erosion and sedimentation control, and others. The contractor will be required to furnish all materials proposed for installation, and will be responsible for properly stockpiling, disposing, or recycling, as appropriate, respective items removed. Removed items deemed for disposal or recycling are to be taken to commercially permitted facilities licensed to accept the same, as applicable. Allegheny River Lock No. 4 will remain in operation while work is being completed, however, the Government will permit temporary scheduled lock closures in accordance with the contract specifications. The contractor will be required to adhere to USACE Construction Quality Management concepts and procedures. The IFB Package contains the solicitation and four (4) Attachments. Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to https://www.usace.army.mil/Business-With-Us/Partnering/ then clicking on View FFP Contract Changes Playbook Here.
Update #2 ·
The US Army Corps of Engineers, Pittsburgh District, has a requirement that involves permanently relocating an enclosed stream on Government property to ultimately travel via gravity through the penstock of the lock land wall and into the Allegheny River, as well as associated decommissioning and/or restoration efforts pertaining to a variety of features to varying degrees. The Allegheny River Lock and Dam No. 4 Permanent Culvert Improvements Project (Project)generally involves the following:? Provide a three-foot (height) by four-foot (width) reinforced concrete box culvert and connect to each an existing junction box and the existing vault of the lock land wall, via open trench and/or shored construction, to permanently relocate the corresponding stream through these features and into the lock land wall penstock, while providing various lock land wall structural counterweight measures;? Decommission various features to varying degrees (i.e. remove and dispose off-site, remove and turn over to the Government, grout fill and abandon in-place, etc.) including but not limited to 36-inch diameter vitrified clay pipe culverts, temporary diversion of water system, various stormwater features, junctions, and various concrete pavement structures;? Restore and/or install various features to varying degrees including but not limited to stormwater features (i.e. culverts, junction boxes, yard inlets, roof downspouts, etc.), concrete pavement structures (i.e. driveways, curbs and gutters, esplanade, sidewalk, etc.), and fences;? Install cured-in-place pipe (CIPP) lining of 36-inch diameter vitrified clay pipe culverts;? Execute work associated with each the lock land wall vault hatch cover plate support system (including providing new support brackets, new recessed ledge angle, new angle brackets, etc.), part of the esplanade electrical utility trench (remove and replace, and maintain utilities during construction), and part of the esplanade trench drain (remove and replace);? Execute various measures to facilitate work including traffic control, diversion of water, erosion and sedimentation control, and others. The contractor will be required to furnish all materials proposed for installation, and will be responsible for properly stockpiling, disposing, or recycling, as appropriate, respective items removed. Removed items deemed for disposal or recycling are to be taken to commercially permitted facilities licensed to accept the same, as applicable. Allegheny River Lock No. 4 will remain in operation while work is being completed, however, the Government will permit temporary scheduled lock closures in accordance with the contract specifications. The contractor will be required to adhere to USACE Construction Quality Management concepts and procedures. The IFB Package contains the solicitation and four (4) Attachments. Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to https://www.usace.army.mil/Business-With-Us/Partnering/ then clicking on View FFP Contract Changes Playbook Here.
Update #1 ·
The US Army Corps of Engineers, Pittsburgh District, has a requirement that involves permanently relocating an enclosed stream on Government property to ultimately travel via gravity through the penstock of the lock land wall and into the Allegheny River, as well as associated decommissioning and/or restoration efforts pertaining to a variety of features to varying degrees. The Allegheny River Lock and Dam No. 4 Permanent Culvert Improvements Project (Project)generally involves the following:? Provide a three-foot (height) by four-foot (width) reinforced concrete box culvert and connect to each an existing junction box and the existing vault of the lock land wall, via open trench and/or shored construction, to permanently relocate the corresponding stream through these features and into the lock land wall penstock, while providing various lock land wall structural counterweight measures;? Decommission various features to varying degrees (i.e. remove and dispose off-site, remove and turn over to the Government, grout fill and abandon in-place, etc.) including but not limited to 36-inch diameter vitrified clay pipe culverts, temporary diversion of water system, various stormwater features, junctions, and various concrete pavement structures;? Restore and/or install various features to varying degrees including but not limited to stormwater features (i.e. culverts, junction boxes, yard inlets, roof downspouts, etc.), concrete pavement structures (i.e. driveways, curbs and gutters, esplanade, sidewalk, etc.), and fences;? Install cured-in-place pipe (CIPP) lining of 36-inch diameter vitrified clay pipe culverts;? Execute work associated with each the lock land wall vault hatch cover plate support system (including providing new support brackets, new recessed ledge angle, new angle brackets, etc.), part of the esplanade electrical utility trench (remove and replace, and maintain utilities during construction), and part of the esplanade trench drain (remove and replace);? Execute various measures to facilitate work including traffic control, diversion of water, erosion and sedimentation control, and others. The contractor will be required to furnish all materials proposed for installation, and will be responsible for properly stockpiling, disposing, or recycling, as appropriate, respective items removed. Removed items deemed for disposal or recycling are to be taken to commercially permitted facilities licensed to accept the same, as applicable. Allegheny River Lock No. 4 will remain in operation while work is being completed, however, the Government will permit temporary scheduled lock closures in accordance with the contract specifications. The contractor will be required to adhere to USACE Construction Quality Management concepts and procedures. The IFB Package contains the solicitation and four (4) Attachments. Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to https://www.usace.army.mil/Business-With-Us/Partnering/ then clicking on View FFP Contract Changes Playbook Here.
6 June 2023: Pre-Bid Site Visit conducted at 10:00AM EST. Site visit agenda and sign in are attached.
Files
| File | Type | Posted |
|---|---|---|
| Bid Results List Bid Opening.pdf | ||
| Agenda Pre-Bid Site Visit 23B8000.pdf | ||
| Site Visit Sign In Sheet.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Permanent Culvert Improvements Project at Allegheny River Lock and Dam 4 | Award Notice | |
| This notice | Solicitation | |
| Permanent Culvert Improvements at Allegheny River Lock and Dam No. 4 | Pre-Solicitation | |
| Allegheny River Lock and Dam No. 4 Permanent Culvert Improvements | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| JP Murtha Float Mooring Bitts Retrofit | ENDIST Pittsburgh | No set-aside | |
| Borough of Millvale, Pennsylvania, Local Protection Project (LPP) PL84-99 Rehabilitation | ENDIST Pittsburgh | Total Small Business | |
| Borough of Etna, Pennsylvania, Local Protection Project (LPP) PL84-99 Rehabilitation | ENDIST Pittsburgh | Total Small Business | |
| Canonsburg-Houston, Pennsylvania, Local Protection Project (LPP) PL84-99 Rehabilitation | ENDIST Pittsburgh | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity