Oahe Little Bend Bank Stabilization

Closed Solicitation Posted

Solicitation number
W9128F21B0004
Agency
ENDIST Omaha US Army Corps of Engineers, Department of Defense
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
237990 Other Heavy and Civil Engineering Construction
PSC
Y1QA Construction Of Restoration Of Real Property (Public Or Private)
Place of performance
Onida SD 57564 USA

Notice details come from SAM.gov. Updated .

About this opportunity

This solicitation seeks bids for bank stabilization work along approximately 5,800 linear feet of shoreline on Lake Oahe in Sully County, South Dakota. The Department of the Army Corps of Engineers Omaha District will award a fixed-price contract to cut, grade, and compact the existing bank, and install approximately 13,000 tons of geotextile fabric and riprap stone. The successful bidder must complete performance within 365 calendar days of the notice to proceed. Bids are due no later than 2:00 PM CST on March 23, 2021 and will be evaluated for price and technical factors.

This requirement has been set aside for total small business concerns. The primary NAICS code is 237990 and PSC code is R999. Fourteen contractors submitted bids ranging from $841,395 to $1,835,160.95. Southeast Construction, Inc. provided the apparent low bid of $941,342.50 to implement the bank stabilization measures in the Little Bend Recreation Area located approximately 30 miles upstream from Pierre, South Dakota, where all work must be completed within the 365-day period of performance.

Notice text

3 versions

Update #3 · Latest ·

***AMENDMENT 0001 - PLEASE REVIEW THE CHANGES AND UPDATES IN THE ATTACHMENT OF AM0001. SECOND SITE VISIT IS SCHEDULED FOR 10 MARCH 2021 AT 2:00 PM CT. CONTACT INFORMATION IS LISTED IN THE AMENDMENT. ***

Second Site Visit - Site Visit sign-in sheet has been posted.

===================================================================================================

Project Description:

This project is for the implementation of bank stabilization measures in Sully County, SD adjacent to Lake Oahe/Oahe Dam Project.

The work will consist of bank and slope protection of approximately 5,800 linear feet and 13,000 tons of rip rap on Lake Oahe on the site herein referred to as the “Little Bend” in Sully County, South Dakota. The work will consist of cutting, regrading, and compacting the existing bank to provide the proper slope for the placement geotextile fabric and rip rap stone. The contractor will be limited to the designated areas for operations.

The work is located on Lake Oahe approximately 30 miles upstream from Pierre, SD and 40 miles southwest of Oneida, SD in the Little Bend Recreation Area. The exact location of the work will be provided by the Contracting Officer's Representative at the time of the solicitation. The Contractor will be required to commence work upon receipt of contract award and completed 365 days after receipt of Notice to Proceed, this is subject to change after solicitation issuance.

Obtaining Solicitation Documents:

Solicitation documents will be posted to the web via via Beta SAM.gov (beta.sam.gov).
Find solicitation announcement in Beta SAM.gov (beta.sam.gov).

1. Use the ‘All Award Data' to locate the project (by entering the solicitation number.

2. By using the ‘login' feature, it allows additional search features and allows you to keep your searches.Login might be required on some solicitations that are considered restricted.

3. Once you have located your project, click on link to solicitation to view the project. Files may be
downloaded from the column on the left side reading ‘Attachments/Links’.


Please wait for the Solicitation to be posted, which will have instructions on where to answer questions.

Update #2 ·

***AMENDMENT 0001 - PLEASE REVIEW THE CHANGES AND UPDATES IN THE ATTACHMENT OF AM0001. SECOND SITE VISIT IS SCHEDULED FOR 10 MARCH 2021 AT 2:00 PM CT. CONTACT INFORMATION IS LISTED IN THE AMENDMENT. ***

===================================================================================================

Project Description:

This project is for the implementation of bank stabilization measures in Sully County, SD adjacent to Lake Oahe/Oahe Dam Project.

The work will consist of bank and slope protection of approximately 5,800 linear feet and 13,000 tons of rip rap on Lake Oahe on the site herein referred to as the “Little Bend” in Sully County, South Dakota. The work will consist of cutting, regrading, and compacting the existing bank to provide the proper slope for the placement geotextile fabric and rip rap stone. The contractor will be limited to the designated areas for operations.

The work is located on Lake Oahe approximately 30 miles upstream from Pierre, SD and 40 miles southwest of Oneida, SD in the Little Bend Recreation Area. The exact location of the work will be provided by the Contracting Officer's Representative at the time of the solicitation. The Contractor will be required to commence work upon receipt of contract award and completed 365 days after receipt of Notice to Proceed, this is subject to change after solicitation issuance.

Obtaining Solicitation Documents:

Solicitation documents will be posted to the web via via Beta SAM.gov (beta.sam.gov).
Find solicitation announcement in Beta SAM.gov (beta.sam.gov).

1. Use the ‘All Award Data' to locate the project (by entering the solicitation number.

2. By using the ‘login' feature, it allows additional search features and allows you to keep your searches.Login might be required on some solicitations that are considered restricted.

3. Once you have located your project, click on link to solicitation to view the project. Files may be
downloaded from the column on the left side reading ‘Attachments/Links’.


Please wait for the Solicitation to be posted, which will have instructions on where to answer questions.

Update #1 ·

Project Description:

This project is for the implementation of bank stabilization measures in Sully County, SD adjacent to Lake Oahe/Oahe Dam Project.

The work will consist of bank and slope protection of approximately 5,800 linear feet and 13,000 tons of rip rap on Lake Oahe on the site herein referred to as the “Little Bend” in Sully County, South Dakota. The work will consist of cutting, regrading, and compacting the existing bank to provide the proper slope for the placement geotextile fabric and rip rap stone. The contractor will be limited to the designated areas for operations.

The work is located on Lake Oahe approximately 30 miles upstream from Pierre, SD and 40 miles southwest of Oneida, SD in the Little Bend Recreation Area. The exact location of the work will be provided by the Contracting Officer's Representative at the time of the solicitation. The Contractor will be required to commence work upon receipt of contract award and completed 365 days after receipt of Notice to Proceed, this is subject to change after solicitation issuance.

Obtaining Solicitation Documents:

Solicitation documents will be posted to the web via via Beta SAM.gov (beta.sam.gov).
Find solicitation announcement in Beta SAM.gov (beta.sam.gov).

1. Use the ‘All Award Data' to locate the project (by entering the solicitation number.

2. By using the ‘login' feature, it allows additional search features and allows you to keep your searches.Login might be required on some solicitations that are considered restricted.

3. Once you have located your project, click on link to solicitation to view the project. Files may be
downloaded from the column on the left side reading ‘Attachments/Links’.


Please wait for the Solicitation to be posted, which will have instructions on where to answer questions.

Attachments

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
Oahe Little Bend Bank Stabilization This notice · Latest solicitation Solicitation
Oahe Little Bend Bank Stabilization Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity