NV FLAP 200(1), Beaver Dam Road
Awarded Award Notice Posted
- Solicitation number
- 6982AF19B00007
- Agency
- Federal Highway Administration Department of Transportation
- Awarded
- to Trade West Construction, Inc.
- Set-aside
- Total Small Business
Opportunity facts
- Contract number
- 6982AF19C000017 Federal contract award
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- PSC
- Not on record
- Place of performance
- Beaver Dam State Park Lincoln County, Nevada 89008, United States
Notice details come from SAM.gov. Updated .
Notice text
2 versions
Update #2 · Latest ·
Awarded Vendors: Trade West Construction, Inc.. Contract Award Dollar Amount: 1827176.85. Contract Award Date: 2019-05-02.
Update #1 ·
The proposed project is to rehabilitate a 2.2-mile segment of Beaver Dam Road within Beaver Dam State Park. The project is located approximately 33 miles east of Caliente in Lincoln County, Nevada 89008. The roadway will be resurfaced with 6 inches of compacted gravel base course on top of the existing gravel roadway with minor widening to establish a 14-foot roadway width. Drainage improvements will include culvert replacements and low water crossing structures. The roadway may be closed to the public during construction. Coordination with the property owner, located at the south end of Beaver Dam Road will be necessary to provide access as needed. There are environmental restrictions on tree and brush removal.
Lincoln County Road Department maintains Beaver Dam Road under a road maintenance agreement with Bureau of Land Management (BLM). BLM land has been transferred to Nevada State parks under Lincoln County Land Bill.
Principal work activities include Surveying & Staking, Erosion Control Items, Roadway Aggregate (27,574 Sq. Yds.), Asphalt Paving (315 tons), Corrugated Metal Pipe Culverts (140 Lin Ft), Precast Concrete Box Culverts (87 Lin Ft), Concrete Low Water Crossing, and Temporary Traffic control.
It is anticipated this project will be advertised in early 2019 and be under construction in the Summer of 2019. The project has an estimated completion date of October 2019.
The estimated cost for the project is between $1 - 2 million.
.
Attachments
| File | Type | Posted |
|---|---|---|
| Beaver_Dam_Road_bid_tabs.pdf | ||
| Beaver_Dam_Bid_Opening_Summary.pdf | ||
| NV_FLAP_200(1)_Q&A.pdf | ||
| 6982AF19B000007.pdf | ||
| Beaver_Dam_Road_Hydraulics_Report_100__Stamped.pdf | ||
| FP14.pdf | ||
| Plans_Beaver_Dam_Road_100_Percent_1.pdf | ||
| Beaver_Dam_Road_Geotechnical_Report_-_Final.pdf |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity