Net Zero Planner Enhancements

Award Notice Posted

Solicitation number
W9132T15T0023
Agency
Awarded
to Big Ladder Software LLC
Set-aside
Total Small Business

Opportunity facts

Contract number
W9132T15P0023 Federal contract award
NAICS code
541511 Custom Computer Programming Services
PSC
Not on record

Notice details come from SAM.gov. Updated .

Notice text

2 versions

Update #2 · Latest ·

THIS IS A RE-POSTING OF PRESOLICITATION NOTICE #W81EWF-5009-1950
Defense installations are required by law - in particular, by the Energy Policy Act of 2005 (EPACT 2005), and the Energy Independence and Security Act of 2007 (EISA 2007) - to eliminate fossil fuel use in new and renovated facilities by 2030 and to reduce overall facility energy usage by 30% by 2015. Army policy is to achieve five (5) Net Zero Energy (NZE) installations by 2020 and twenty-five (25) by 2030. Design of Net Zero Energy installations is a complex undertaking however, that requires an optimal mix of demand reduction, system integration on a community scale, use of renewable sources, and storage technologies. Installation planners lack the ability to analyze and optimize performance of complex non-linear dynamically coupled systems needed to achieve NZE goals in a timely and cost-effective manner.
Prior work developed early versions of a Net Zero planning tool (Net Zero Planner) which assists installation planners to develop an optimized path towards a Net Zero Energy installation. This tool needs further development and enhancement to incorporate additional capabilities.
This is not a request for proposal and in no way obligates the Government to award any contract.
The associated North American Industry Classification System (NAICS) code is 541511 which has a size standard of $27.50M. This is a small business set a-side.
Major Requirements: The Contractor shall provide necessary manpower and equipment to accomplish the following six tasks:
Task 1: Implement full HVAC system coverage across all models.
Task 2: Add four (4) new residential housing facility types.
Task 3: Upgrade to most recent version of EnergyPlus.
Task 4: Implement comprehensive ASHRAE 90.1-2004 modeling for calculating the EPAct baseline energy consumption.
Task 5: Generate EISA baseline source energy use intensity (EUI) reference values for each facility type and climate zone.
Task 6: Update documentation and User Guide for Params.
Period of Service: All work to be performed under this contract shall be completed not later than three hundred (300) days from contract award.
Estimate of when solicitation will be issued: April 22, 2015
Point of Contact (POC): Wanda Huber, Wanda.L.Huber@usace.army.mil, (217) 373-6730
Alternate POC: Andrea Thomas, (217) 373-6746, Andrea.J.Thomas@usace.army.mil.
.

Update #1 ·

Added: Apr 22, 2015 9:52 am THIS IS A RE-POSTING OF PRESOLICITATION NOTICE #W81EWF-5009-1950

Defense installations are required by law - in particular, by the Energy Policy Act of 2005 (EPACT 2005), and the Energy Independence and Security Act of 2007 (EISA 2007) - to eliminate fossil fuel use in new and renovated facilities by 2030 and to reduce overall facility energy usage by 30% by 2015. Army policy is to achieve five (5) Net Zero Energy (NZE) installations by 2020 and twenty-five (25) by 2030. Design of Net Zero Energy installations is a complex undertaking however, that requires an optimal mix of demand reduction, system integration on a community scale, use of renewable sources, and storage technologies. Installation planners lack the ability to analyze and optimize performance of complex non-linear dynamically coupled systems needed to achieve NZE goals in a timely and cost-effective manner.

Prior work developed early versions of a Net Zero planning tool (Net Zero Planner) which assists installation planners to develop an optimized path towards a Net Zero Energy installation. This tool needs further development and enhancement to incorporate additional capabilities.

This is not a request for proposal and in no way obligates the Government to award any contract.

The associated North American Industry Classification System (NAICS) code is 541511 which has a size standard of $27.50M. This is a small business set a-side.

Major Requirements: The Contractor shall provide necessary manpower and equipment to accomplish the following six tasks:

Task 1: Implement full HVAC system coverage across all models.

Task 2: Add four (4) new residential housing facility types.

Task 3: Upgrade to most recent version of EnergyPlus.

Task 4: Implement comprehensive ASHRAE 90.1-2004 modeling for calculating the EPAct baseline energy consumption.

Task 5: Generate EISA baseline source energy use intensity (EUI) reference values for each facility type and climate zone.

Task 6: Update documentation and User Guide for Params.

Period of Service: All work to be performed under this contract shall be completed not later than three hundred (300) days from contract award.

Estimate of when solicitation will be issued: April 22, 2015

Point of Contact (POC): Wanda Huber, Wanda.L.Huber@usace.army.mil, (217) 373-6730

Alternate POC: Andrea Thomas, (217) 373-6746, Andrea.J.Thomas@usace.army.mil.