Modification Kit, TR Pre-Solicitation Synopsis
Closed Pre-Solicitation Posted
Not the latest version. See the latest solicitation from .
- Solicitation number
- EH0C0396EH
- Agency
-
TACOM Life Cycle Management Command
Army Materiel Command, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 336390 Other Motor Vehicle Parts Manufacturing
Notice details come from SAM.gov. Updated .
About this opportunity
The Army Contracting Command-Detroit Arsenal intends to issue a sole-sourced firm-fixed price RFP for 21 Modification Kits, TR (NSN 2541-01-675-3031, Part Number 6110356) to serve as an interim solution until the GMV/ISV is fielded. The kit consists of a lightweight roll cage, weapons station turret, cargo area side boards, and four additional rear seats with restraints. The RFP will be issued within two to three weeks, with proposals due by April 30. No technical data package or first article testing is required.
There is no set-aside designation. The NAICS code is 336390. AM General LLC is the sole manufacturer. Production lead time is 53 days for the initial 5 kits and 88 days for the remaining 16, with inspection and acceptance at origin. No option quantities are available, and the total base quantity is 21 kits valued at an undisclosed amount from the Army Contracting Command-Detroit Arsenal and TACOM Life Cycle Management Command.
Notice text
The Army Contracting Command- Detroit Arsenal intends to issue a Firm-Fixed Price Request for Proposal (RFP) in the next two to three weeks for the Modification Kit, TR; NSN: 2541-01-675-3031, Part Number: 6110356; NAICS Code: 336390. The RFP will be sole-sourced to AM General LLC. The base quantity is 21 each without an option available. The Modification Kit TR, is meant as an interim solution until the GMV/ISV is fielded. The Modification Kit, TR consists of a lightweight roll cage, weapons station turret, cargo area side boards, and four additional rear seats with restraints.
There is not a Technical Data Package (TDP) for this procurement—it is a Manufacturers’ Part. First Article Test (FAT) is not required for this procurement. Production Lead Time (PLT) without FAT is 53 days after award for 5 each and the remaining 16 each 88 days after award.
Inspection and Acceptance points are Origin. FOB is Origin.
Notice history
| Notice | Type | Posted |
|---|---|---|
| W56HZV-20-R-0151 Modification Kit, TR Solicitation | Solicitation | |
| This notice | Pre-Solicitation | |
| Enhanced Tactical Mobility Kit Sources Sought | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Modification kit, vehic | Land and Maritime | No set-aside | |
| Modification kit, AI | Aviation | No set-aside | |
| Installation kit, vehicular equipment COM | Land and Maritime | No set-aside | |
| Equipment kit, vehicula | Land and Maritime | No set-aside | |
| Request for Proposal for Project Manager Mounted Armored Vehicle Logistic Fielding Support Services | Department of the Army | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity