Middle Bugs Road Decommisioning
Awarded Award Notice Posted
- Solicitation number
- AG-02RC-S-15-0048
- Agency
- Region 1 - Northern Region Forest Service, Department of Agriculture
- Awarded
- to Mark Agee Excavation LLC
- Set-aside
- HUBZone
Opportunity facts
- Contract number
- AG02RCP150155 Federal contract award
- NAICS code
- 115310 Support Activities for Forestry
- PSC
- Not on record
- Place of performance
- The project area is located east of Weippe and Pierce, Idaho in the Middle Creek watershed in Idaho County. Access to project roads is by Usfs Road 103. From U.S. Highway 12, head north on State Highway 11, at Greer Junction. Travel north on State Highway 11 to Weippe, ID. When State Hwy 11 turns a hard left to the north in Weippe, continue straight (east) on the Musselshell Road. Take the Musselshell Road for approximately 8 miles to the junction with Usfs Rd. 100 at Petersons Corner. Head straight (east) at the junction onto Usfs Rd. 100 and travel towards Kamiah for approximately 5.8 miles to the junction of Usfs Road 103. Turn left (north/northeast) onto Usfs Rd. 103 and travel over Beaver Dam Saddle at junction with Usfs Rd. 104 (milepost 15 on Rd. 103). Continue straight (north) on Rd. 103 over Beaver Dam Saddle and travel 3.5 miles to access the southernmost project roads (Rd. 3100 and associated roads). Access to individual project roads is described on attached map. Orofino, Idaho 83544, United States
Notice details come from SAM.gov. Updated .
Notice text
2 versions
Update #2 · Latest ·
Added: May 29, 2015 4:45 pm
Pre-bid Tour:
Date: 11 June 2015
Time: 11:00 AM Local
Location: Beaver Dam Saddle. Contractors will meet with USFS and then tour will begin at Site.
RSVP to: Darren Zychek (208) 476-8224
Update #1 ·
Added: May 11, 2015 7:22 pm MIDDLE BUGS ROAD DECOMMISSIONING:The Middle Bugs Road Decommissioning project consists of decommissioning approximately 3.4 miles of road using Roadway Obliteration Method 1 and placing approximately 11.2 miles of road into long-term storage using Roadway Obliteration Method 2. Additional decommissioning and road maintenance may be determined and would be directed by the C.O. Road decommissioning treatments include drainage structure removal, decompaction, recontouring, strong outsloping and seeding of disturbed areas. All fill material and culverts in stream channel crossings and dry swales will be removed. Stream channels will be restored to natural grade and dimensions and grade control structures installed. Native vegetation, slash and duff material available on site will be transplanted to the decompacted and recontoured or outsloped roadway. A temporary bridge across Middle Creek will be required for access to the work on Road 3100 and associated spur roads. Middle Creek is approximately 25 foot bankfull width. Old bridge abutments still exist.
Attachments
| File | Type | Posted |
|---|---|---|
| Amendment_002_to_AG-02RC-S-15-0048_Middle_Bugs_Prebid_Tour_Notes.pdf | ||
| Amedment_001_to_AG-02RC-S-15-0048.pdf | ||
| Updated_Middle_Bugs_Rd_Decomm_Drawings_(AG-02RC-S-15-0048).pdf | ||
| Middle_Bugs_Rd_Decomm_Drawings_(AG-02RC-S-15-0048).pdf | ||
| Middle_Bugs_Rd_Decomm_Work_List_(AG-02RC-S-15-0048).docx | DOCX document | |
| Middle_Bugs_Rd_Decomm_Specifications_(AG-02RC-S-15-0048).docx | DOCX document | |
| Nez_Perce-Clearwater_NF_-_Middle_Bugs_Rd_Decomm_(AG-02RC-S-15-0048).doc | DOC document | |
| MidBugsDecom_ProjLocMap2015.pdf |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity