LHA-7 Long Lead Time Material, Advanced Engineering and Planning Services and Special Studies

Award Notice Posted

Solicitation number
N0002410R2229
Agency
Awarded
to Huntington Ingalls Incorporated
Set-aside
No set-aside

Opportunity facts

Contract number
N0002410C2229 Federal contract award
NAICS code
336611 Ship Building and Repairing
PSC
Not on record
Place of performance
1000 Access Road, Pascagoula, MS 39567 USA

Notice details come from SAM.gov. Updated .

Notice text

The Naval Sea Systems Command intends to issue Request for Proposal N00024-10-R-2229 on a sole source basis to Northrop Grumman Shipbuilding, Inc. (NGSB), P.O. Box 149, Pascagoula, MS 39568-0149, for the advance procurement of long-lead-time material and design engineering services for the LHA 7 Amphibious Assault Ship and associated special studies. The Naval Sea Systems Command intends to issue subsequent Request for Proposal N00024-10-R-2230 on a sole source basis to Northrop Grumman Shipbuilding, Inc. (NGSB), P.O. Box 149, Pascagoula, MS 39568-0149, for the construction of the LHA 7 Amphibious Assault Ship. The LHA 7 will be the second ship of the LHA(R) Flight 0 class. The LHA(R) is a modified variant of the LHD 1 Class Amphibious Assault Ships. NGSB has designed and constructed all LHA and LHD Class Amphibious Assault Ships, including LHA 6 which is currently under construction. Therefore, NGSB is the only source with the requisite knowledge and experience required to complete construction of the second ship of the LHA(R) Flight 0 class (LHA 7). This notification is issued for subcontracting purposes only.

Files

File Type Posted
N0002410C2229_N00024_20698_NECO.PDF PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity