Koma kulshan guard station water distribution lines replacement

Award Notice Posted

Solicitation number
AG-05M6-S-15-0056
Agency
Awarded
to WM Welch Corp
Set-aside
No set-aside

Opportunity facts

Contract number
AG-05M6-C-15-0012 Federal contract award
NAICS code
238220 Plumbing, Heating, and Air-Conditioning Contractors
PSC
Not on record
Place of performance
47260 Baker Lake Road Concrete, Washington 98237, United States

Notice details come from SAM.gov. Updated .

Notice text

3 versions

Update #3 · Latest ·

Awarded.

Update #2 ·

The purpose of this Solicitation is to replace existing waterline with new waterline; The work includes but is not limited to: Abandonment, removal, disposal of an existing waterlines, and valves within the compound. Installation of new waterline, valves, trenching, backfilling, frost-proof hydrants, excavation, driveway restoration, and any miscellaneous fittings incidental to the cost. All materials to be furnished by contractors.

This project is located at The Koma Kulshan guard Station on the Mt. Baker Ranger District of the Mt. Baker- Snoqualmie National Forest, Section 5&8, Township 18 North, Range 10 East, Whatcom County, Washington. Project may be reached from Sedro-Woolley, Washington by traveling east on Highway 20 follow the road for 15 miles then turn left onto County road #68 by following County road approximately 15 miles Koma Kulshan in the right. This project is 100% set aside for Small Business. Construction activity will not be allowed until after October 3, 2015

The Government's estimate is between $25,000 and $100,000. A Payment Bond will be required.

Technical point contact for this project is Thomas Warter at (425) 783-6082 or e-mail twarter@fs.fed.us


POC
Jorge Somoza, Contract Specialist, Phone (425) 783-6053, fax (425) 783-0129. Email jsomoza@fs.fed.us

Update #1 ·

The purpose of this Solicitation is to replace existing waterline with new waterline; The work includes but is not limited to: Abandonment, removal, disposal of an existing waterlines, and valves within the compound. Installation of new waterline, valves, trenching, backfilling, frost-proof hydrants, excavation, driveway restoration, and any miscellaneous fittings incidental to the cost. All materials to be furnished by contractors.

This project is located at The Koma Kulshan guard Station on the Mt. Baker Ranger District of the Mt. Baker- Snoqualmie National Forest, Section 5&8, Township 18 North, Range 10 East, Whatcom County, Washington. Project may be reached from Sedro-Woolley, Washington by traveling east on Highway 20 follow the road for 15 miles then turn left onto County road #68 by following County road approximately 15 miles Koma Kulshan in the right. This project is 100% set aside for Small Business. The solicitation will be posted around August 3rd 2015. Construction activity will not be allowed until after October 3, 2015

The Government's estimate is between $25,000 and $100,000. A Payment Bond will be required.

Technical point contact for this project is Thomas Warter at (425) 783-6082 or e-mail twarter@fs.fed.us


POC
Jorge Somoza, Contract Specialist, Phone (425) 783-6053, fax (425) 783-0129. Email jsomoza@fs.fed.us