KC46A Depot System Integration Electronics/Software Laboratory, Tinker AFB, OK
Award Notice Posted
- Solicitation number
- W912BV-16-R-0141
- Agency
-
ENDIST Tulsa
US Army Corps of Engineers, Department of Defense
- Awarded
- to Southwind Construction Services, LLC
- Set-aside
- Total Small Business
Opportunity facts
- Contract number
- W912BV17C0007 Federal contract award
- NAICS code
- 236220 Commercial and Institutional Building Construction
- PSC
- Not on record
- Place of performance
- Tinker Air Force Base Oklahoma City, Oklahoma 73145, United States
Notice details come from SAM.gov. Updated .
Notice text
Added: Aug 04, 2016 9:54 am
This is a design build project utilizing a two phase selection process. The first phase will be a request for qualifications and experience only that will focus on specialized experience related to this project.
The proposed project will be a competitive, firm-fixed price, design-build contract procured in accordance with FAR 15, Negotiated Procurement utilizing the Best Value Trade-Off process. The North American Industry Classification System (NAICS) code for this program is 236220, Commercial and Institutional building construction. The solicitation will be posted on or about 19 August 2016.
The magnitude of this requirement is between $10,000,000 and $25,000,000.
Description- Construct an approximate 49,600 SF 2 story System Integration Laboratory facility. Facility will be built inside Building 9001 at Tinker AFB and include drilled piers. The facility program includes lab space to house engineering development workstations and an integration and test environment with computer rooms with raised flooring, high bay area, and special power and cooling requirements. The lab areas are comprised of several standalone benches and multiple integration labs with sufficient capacity for all KC-46A software sustainment and modernization. The facility requires a classified security system, wiring, and communication lines. The facility must also comply with DoD minimum force protection construction standards. All external doors need to be secured. Work includes communications support, administration and support area, all necessary utilities and HVAC.
Files
| File | Type | Posted |
|---|---|---|
| W912BV-16-R-0141-AM01.doc | DOC document | |
| W912BV-16-R-0141.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity