Jefferson County EWPP-FPE Construction Project

Awarded Award Notice Posted

Solicitation number
AG-5F48-S-10-0013
Agency
National Resources Conservation Service Department of Agriculture
Awarded
to Orion Contruction Group, LLC
Set-aside
Emerging Small Business

Opportunity facts

Contract number
AG-5F48-P-10-0023 Federal contract award
NAICS code
237990 Other Heavy and Civil Engineering Construction
PSC
Not on record
Place of performance
Jefferson County, Wisconsin, United States

Notice details come from SAM.gov. Updated .

Notice text

2 versions

Update #2 · Latest ·

Added: Aug 03, 2010 5:34 pm Modified: Aug 13, 2010 12:05 pmTrack Changes This action is funded with American Recovery and Reinvestment Act (ARRA) funds. Reporting to www.FederalReporting.gov is mandatory during the first 10 days following the end of each quarter (Jan-Mar, Apr-Jun, Jul-Sep, Oct-Dec) of the project. Construction of the Jefferson County Emergency Watershed Protection Program-Floodplain Easement Program (EWPP-EWP) Construction Project, Jefferson County, Wisconsin. The work consists of the following: • Installation of required erosion control measures • Tile exploration • Tile removal and replacement with non-perforated tile • Tree clearing • Filling of drainage ditch • Excavation of material from scrape and borrow areas, and pushing of material to fill ditches • Seeding of disturbed areas A site visit is scheduled for 10 am on Tuesday, 8/10/10. Participants will meet onsite, at County Hwy G, approximately 1 mile south of Highway 19, in Milford Township (T 8N, R 14E, Section 7) in Jefferson County.

Update #1 ·

Added: Aug 03, 2010 5:34 pm This action is funded with American Recovery and Reinvestment Act (ARRA) funds. Reporting to www.FederalReporting.gov is mandatory during the first 10 days following the end of each quarter (Jan-Mar, Apr-Jun, Jul-Sep, Oct-Dec) of the project.



Construction of the Jefferson County Emergency Watershed Protection Program-Floodplain Easement Program (EWPP-EWP) Construction Project, Jefferson County, Wisconsin. The work consists of the following:



Installation of required erosion control measures

Tile exploration

Tile removal and replacement with non-perforated tile

Tree clearing

Filling of drainage ditch

Excavation of material from scrape and borrow areas, and pushing of material to fill ditches

Seeding of disturbed areas



A site visit is scheduled for 10 am on Tuesday, 8/10/10. Participants will meet onsite, at County Hwy G, approximately 1 mile south of Highway 19, in Milford Township (T 8N, R 14E, Section 7) in Jefferson County.







Attachments

Files attached to this notice, newest first
File Type Posted
Amendment 1 8-13-10.pdf PDF
Price Schedule Section B.xlsx XLSX spreadsheet
Specifications.pdf PDF
Drawings.pdf PDF
Solicitation Sections C through M.docx DOCX document
Solicitation Offer and Award-Standard Form 1442 Section A —
General Decision Number WI100019 07-02-2010 WI19.docx DOCX document