Install incinerator & storage tank
Award Notice Posted
- Solicitation number
- G13PS00204
- Agency
-
US Geological Survey
Department of the Interior
- Awarded
- to Shawleys Superior LP Gas-So-Fine Inc.
- Set-aside
- Total Small Business
Opportunity facts
- Contract number
- ING13PX00739 Federal contract award
- NAICS code
- 238290 Other Building Equipment Contractors
- PSC
- Not on record
Notice details come from SAM.gov. Updated .
Notice text
3 versions
Update #3 · Latest ·
The Leetown Science Center located in Leetown, WV uses an incinerator for elimination of biological waste generated in connection with its research. The current incinerator is in poor condition. The Center requires replacement a new incinerator and stack in the same building as the current unit. A dedicated fuel tank sufficient to operate the unit shall be provided with the unit. Removal and proper disposal of the old unit is also required.
The contractor shall submit costs for labor, materials, travel, and any other category that is part of the total cost as part of the bid. Prices shall be itemized to show specific materials / products, and labor for the project.
Update #2 ·
The Leetown Science Center located in Leetown, WV uses an incinerator for elimination of biological waste generated in connection with its research. The current incinerator is in poor condition. The Center requires replacement a new incinerator and stack in the same building as the current unit. A dedicated fuel tank sufficient to operate the unit shall be provided with the unit. Removal and proper disposal of the old unit is also required.
The contractor shall submit costs for labor, materials, travel, and any other category that is part of the total cost as part of the bid. Prices shall be itemized to show specific materials / products, and labor for the project.
Update #1 ·
The Leetown Science Center located in Leetown, WV uses an incinerator for elimination of biological waste generated in connection with its research. The current incinerator is in poor condition. The Center requires replacement a new incinerator and stack in the same building as the current unit. A dedicated fuel tank sufficient to operate the unit shall be provided with the unit. Removal and proper disposal of the old unit is also required.
The contractor shall submit costs for labor, materials, travel, and any other category that is part of the total cost as part of the bid. Prices shall be itemized to show specific materials / products, and labor for the project.
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity