About this opportunity

The US Army Corps of Engineers Rock Island District intends to solicit competitive quotations under Revolutionary FAR Overhaul (RFO) Part 12 for fabricated steel components, with a response deadline of August 18, 2026. This procurement is set aside for Total Small Business.

Delivery is FOB Destination to USACE Illinois Waterway Project Office, Peoria, Illinois. The requirement encompasses fabrication and supply of steel components including four Gudgeon Pins, eight Keepers, two Bushings, eight 9-inch Anchorage Pins with eight Keepers (Dog Bone configuration), and two Pintle Shoes. All work must conform to specifications and drawings in the forthcoming solicitation, with mandatory requirements for ASTM-rated materials, 100% Non-Destructive Testing (UT & MT) with certified reports, specified paint systems per UFGS 09 97 02, and strict packaging and delivery protocols. Delivery of all items is required within 37 weeks after receipt of order.

NAICS 332999 (All Other Miscellaneous Fabricated Metal Product Manufacturing) applies. This is a pre-solicitation notice; responses received will not be evaluated or compensated.

Notice text

The US Army Corps of Engineers - Rock Island District intends to solicit for competitive quotations under Revolutionary FAR Overhaul (RFO) Part 12 for the following requirement.

DISCLAIMER: THIS IS A PRE-SOLICITATION NOTICE. ANY INFORMATION OR SUBMITTALS RECEIVED IN RESPONSE TO THIS NOTICE WILL NOT BE EVALUATED AND WILL NOT BE CONSTRUED AS QUOTES. NO COMPENSATION FOR SUCH RESPONSES WILL BE MADE.

DELIVERY LOCATION

All items are to be delivered FOB Destination to the U.S. Army Corps of Engineers (USACE) Illinois Waterway Project Office, with a physical address of 257 Grant Street, Peoria, IL 61603.

SUMMARY OF WORK

The requirement is for the fabrication and supply of various steel components. The work includes, but is not limited to:

  • Fabrication and supply of (4) Gudgeon Pins, (8) Keepers, and (2) Bushings.

  • Fabrication and supply of (8) 9-inch Anchorage Pins with (8) Keepers (Dog Bone).

  • Fabrication and supply of (2) Pintle Shoes.

The contractor will be required to adhere to all specifications and drawings provided in the forthcoming solicitation, including requirements for specific ASTM-rated materials, 100% Non-Destructive Testing (UT & MT) with certified reports, specified paint systems (UFGS 09 97 02), and strict packaging and delivery protocols. The required delivery for all items is within 37 weeks after receipt of order (ARO).

Similar open opportunities

Opportunity Agency Set-aside Responses due
Illinois River Basin, Brandon Road L and D, Joliet, Illinois, Flushing Lock and Dam Gates Fabrication NAICS 326199 ENDIST Rock Island Total Small Business
NG SEW-electrical components Rock Island, Illinois 61299, United States · NAICS 335999 ACC Rock Island Total Small Business
New Lock Stoplogs Sault Sainte Marie, Michigan, United States · NAICS 332312 ENDIST Detroit Total Small Business
Temporary Perimeter Flood Barriers 61299 · NAICS 314910 ENDIST Rock Island No set-aside
Steel and other Materials for the Marietta Repair Station: Stamford Barrier Gate Material PH 2 Middleport, Ohio, United States · NAICS 332312 ENDIST Huntington No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity