FY20 Medium Voltage Switchgear, Saint Marys River, MI
Closed Pre-Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- W911XK20R0002
- Agency
-
ENDIST Detroit
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 238210 Electrical Contractors and Other Wiring Installation Contractors
- PSC
- Not on record
- Place of performance
- Sault Sainte Marie MI 49783 USA
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Army Corps of Engineers Detroit District seeks firms capable of providing construction services to replace aging medium voltage switchgear and transformers at the Main Powerhouse in Sault Sainte Marie, Michigan. The agency contemplates a best value tradeoff competition to evaluate past performance, experience with similar work, and proposed schedule. Interested parties were asked to provide company and bonding information as well as descriptions of relevant past projects by December 3, 2019 via email.
The opportunity is set aside for small businesses under NAICS code 238210, Electrical Contractors and Other Wiring Installation Contractors. The contract value is estimated between $1 million to $5 million and will have a period of performance of 300 calendar days starting in June 2020. The replacement of the 15kV and 5kV switchgears and dry type transformers located in the remotely accessed Main Powerhouse is critical to maintaining the 18.4 megawatts of power generated for the local community.
Notice text
This Sources Sought announcement is for planning and market research purposes only and is NOT a Request for Proposal (RFP), or Invitation for Bid (IFB).
No basis for claim against the Government shall arise as a result of a response to this Sources Sought Notice. The Government will not pay for information or comments provided and will not recognize any cost associated with the submission of responses or comments.
The U.S. Army Corps of Engineers Detroit District is seeking firms that have the capability to provide construction services for providing medium voltage switchgear at the Main Powerhouse in Sault Sainte Marie, MI.
The hydroelectric generating facilities at the Soo consist of two powerhouses with a total installed capacity of 18.4 megawatts (MW), rated at a flow of 12,700 CFS. The Main Powerhouse located at the foot of the rapids has three generating units each of 4.8 MW capacity installed in 1951-52 and one generating unit of 2.0 MW capacity installed in 1954.
The hydroelectric plant provides power to the local community and plant shutdowns will be limited or phased to reduce the impact on the community.
The Main Powerhouse is remotely located north of the Soo Locks and is water-bound. As land access does not exist, all mobilization of materials and equipment must be via floating plant provided by the offeror. Floating plant access is generally limited to the tailrace side of the plant (refer to the provided image). A crane barge will be needed to place equipment and materials to the available bay door.
The medium voltage switchgear in the Main Powerhouse is original equipment and is causing increased reliability and operational risks due to obsolete parts and age. This project replaces the existing 15 kV switchgear and the 5 kV switchgear and dry type transformer. Both switchgears and transformers are located in the Main Powerhouse.
The complete medium voltage switchgear system includes cabling, all generator instrumentation transformers, benchboard modifications including new metering, control switches and internal wiring, new protective relaying for new feeders as required, revisions to existing protective relaying settings as required, surge arrestors, interface wiring for alarm, communication, and control. This project will increase the reliability of the power distribution with the replacement of outdated obsolete equipment.
The U.S. Army Corps of Engineers Detroit District contemplating to solicit this requirement as a Trade Off Best Value Source Selection. The Government will evaluate the potential offerors based on past performance, experience with similar work, and proposed schedule. However, the result of the market research will contribute to determining the method of procurement and feasible set-aside opportunities.
Qualified companies are encouraged to respond.
The contractor will have an estimated 300 calendar days to complete this requirement.
The contract is expected to be awarded around June 2020.
The estimated cost of construction is between $1,000,000 and $5,000,000.
The North American Industrial Classification System (NAICS) code is 238210, which has a small business size standard of $16.5 million.
The responses submitted to this notice shall be in summary format and shall not exceed five (5) pages, including the Sources Sought Information Form..
In order for the Government to determine the extent of industry interest and experience in the project, interested contractors shall complete the fillable form located at the bottom of this sources sought.
Information to be included in the fillable is as follows:
1. Company Information
Company Name: _______________________________________________________
Company Address:____________________________________________ _________
Unique Entity Identifier: __________________________________________________
CAGE Code: _____________________________
(Formerly called DUNS Number)
Contact Name: ________________________________
Contact Phone: _____________________________
Company Email:
2. Socio‐economic status for NAICS Code 238210 (Check all that apply):
_____ Large Business
_____ Small Business
_____ Small Disadvantaged Business
_____ 8(a) Small Business
_____ Veteran‐Owned Small Business
_____ Service‐Disabled Veteran‐Owned Small Business
_____ HUBZone Small Business
_____ Woman‐Owned Small Business
3. A letter from the firm's bonding company verifying bonding capability
Individual Contract Capacity: $________________________
Aggregate Contract Capacity: $________________________
4. Past Project Examples
Provide descriptions of two projects that are substantially complete or completed within the last ten years which are similar to this project in size, scope, and dollar value.
5. Company Capability
Provide a descriptive statement of the company's capacity to perform this work at
this location, addressing the ability to mobilize, subcontract as necessary, schedule, supervise, supply, and execute such work. Include a statement indicating how much of the work would be self‐performed by the potential prime contractor.
Companies that are interested may submit their information via Email Only to Contracting Branch at LRE-Quotes@usace.army.mil and provide a copy to the Contract Specialist at derek.s.gibson@usace.army.mil.
Please reference in the subject line "SOURCE SOUGHT FY20 Medium Voltage Switchgear, Saint Marys River, MI ".
Respondents will not be contacted regarding their submission or information gathered as a result of the Sources Sought.
Place of Contract Performance:
Sault Sainte Marie, MI United States
Files
| File | Type | Posted |
|---|---|---|
| Powerhouse Location.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Medium Voltage Switchgear, Saint Marys River, MI | Award Notice | |
| Medium Voltage Switchgear, Saint Marys River, MI | Solicitation | |
| Medium Voltage Switchgear, Saint Marys River, MI | Pre-Solicitation | |
| This notice | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Dike B Generator Installation, Mansfield Hollow Dam, Mansfield Center, CT | ENDIST New England | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity