Front gates force protection, PN XQPZ094013
Awarded Award Notice Posted
- Solicitation number
- W9128F-16-R-0090
- Agency
- ENDIST Omaha US Army Corps of Engineers, Department of Defense
- Awarded
- to Federal Contracting Inc.
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- W9128F-17-C-0004 Federal contract award
- NAICS code
- 236220 Commercial and Institutional Building Construction
- PSC
- Not on record
- Place of performance
- U.S. Air Force Academy, Colorado U.S. Air Force Academy, Colorado 80840, United States
Notice details come from SAM.gov. Updated .
Notice text
3 versions
Update #3 · Latest ·
Added: Nov 08, 2016 6:20 pm Design and Construct canopies at the existing north and south gates traffic lanes (inbound and outbound) utilizing conventional design and construction methods to accommodate the mission of the facility. Enhance the entry roads with passive anti-terrorism/force protection (AT/FP) measures, roadway delineation, roadway pull-off/search areas, signage, POV inspection facilities, POV inspection bays and occupant shelters, site improvements, landscaping, and all other supporting facilities. This project will comply with DoD antiterrorism/force protection requirements per UFC 4-010-01.
Update #2 ·
Added: May 27, 2016 5:53 pm
Modified: Aug 23, 2016 9:50 amTrack Changes
****AMENDMENT 0008 IS FORTHCOMING EXTENDING THE DUE TO FRI, AUGUST 26, 2016****
Design and Construct canopies at the existing north and south gates traffic lanes (inbound and outbound) utilizing conventional design and construction methods to accommodate the mission of the facility. Enhance the entry roads with passive anti-terrorism/force protection (AT/FP) measures, roadway delineation, roadway pull-off/search areas, signage, POV inspection facilities, POV inspection bays and occupant shelters, site improvements, landscaping, and all other supporting facilities. This project will comply with DoD antiterrorism/force protection requirements per UFC 4-010-01.
The estimated construction cost of this project is between $7,500,000 and $8,500,000.
Update #1 ·
Added: May 27, 2016 5:53 pm
Design and Construct canopies at the existing north and south gates traffic lanes (inbound and outbound) utilizing conventional design and construction methods to accommodate the mission of the facility. Enhance the entry roads with passive anti-terrorism/force protection (AT/FP) measures, roadway delineation, roadway pull-off/search areas, signage, POV inspection facilities, POV inspection bays and occupant shelters, site improvements, landscaping, and all other supporting facilities. This project will comply with DoD antiterrorism/force protection requirements per UFC 4-010-01.
The estimated construction cost of this project is between $7,500,000 and $8,500,000.
Attachments
| File | Type | Posted |
|---|---|---|
| Am_0008.pdf | ||
| Am_0007.pdf | ||
| Am_0006.pdf | ||
| Am_0005.pdf | ||
| Am_0004.pdf | ||
| RFP_CAD_files-revit-s-gate.7z | 7Z file | |
| RFP_CAD_files-revit-n-gate.7z | 7Z file | |
| RFP_CAD_files.7z | 7Z file | |
| Am_0003.pdf | ||
| Am_0002.pdf | ||
| Am_0001.pdf | ||
| W9128F-16-R-0090_DRAWINGS_NORTH_GATE.PDF | ||
| W9128F-16-R-0090_DRAWINGS_SOUTH_GATE.PDF | ||
| W9128F-16-R-0090_USAFA_Front_Gate-Specs.pdf |
Show all 14
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity