Am_0006.pdf
PDF 1 MB Posted
- Attached to
- FRONT GATES FORCE PROTECTION, PN XQPZ094013 Federal contract opportunity
- Solicitation number
- W9128F-16-R-0090
About this file
Amendment 0006
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Am_0008.pdf | ||
| Am_0007.pdf | ||
| Am_0005.pdf | ||
| Am_0004.pdf | ||
| RFP_CAD_files-revit-s-gate.7z | 7Z file | |
| RFP_CAD_files-revit-n-gate.7z | 7Z file | |
| RFP_CAD_files.7z | 7Z file | |
| Am_0003.pdf | ||
| Am_0002.pdf | ||
| Am_0001.pdf | ||
| W9128F-16-R-0090_DRAWINGS_NORTH_GATE.PDF | ||
| W9128F-16-R-0090_DRAWINGS_SOUTH_GATE.PDF | ||
| W9128F-16-R-0090_USAFA_Front_Gate-Specs.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICIATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPIRATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION ( Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
Amendment No. 0006 Aug 16, 2016
U.S ARMY CORPS OF ENGINEERS, OMAHA DISTRICT
CONTRACTING OFFICE
1616 CAPITOL AVE.
OMAHA, NE 68102-4901
See Item 6
W9128F-16-R-0090
Jul 8, 2016
FRONT GATES FORCE PROTECTION, XQPZ 09 4013, USAF ACADEMY, COLORADO
See attached documentation for content of the amendment revisions
Date for receipt of Proposals is 25 AUG 2016 at 1400 hours
Government Point of Contact: Donna Larson(402) 995-2066
8/16/2016
Am #0006 - 1
Am #0006 - 2 (Continuation of SF30)
DEPARTMENT OF THE ARMY
Omaha District, Corps of Engineers
1616 Capitol Avenue Omaha, Nebraska 68102-4901
:NOTICE: Failure to acknowledge : Solicitation No. W9128F-16-R-0090 :all amendments may cause rejec-:
:tion of the offer. See FAR : Date of Issue: 8 JUL 2016 :52.215-1 of Section 00 21 00. : Date of Receiving Proposals:
25 AUG 2016
Amendment No. 0006
16 AUG 2016
SUBJECT: Amendment No. 0006 to Request for Proposal Specifications and Drawings for Design and Construction of Front Gates Force Protection.
TO: Prospective Offerors and Others Concerned
1. The specifications and drawings for subject project are hereby modified as follows (revise all specification indices, attachment lists, and drawing indices accordingly).
a. Specifications. (Descriptive Changes)
None.
b. Specifications (New and/or Revised and Reissued). Delete and substitute or add specification pages as noted below. The substituted pages are revised and reissued with this amendment.
Pages Deleted Pages Substituted or Added
00 10 00 00 10 00
Note: CLIN Pricing Schedule, 00 10 00-3 revised such that Option Item 0006 deleted and Option Item 0007 renumbered to 0006.
c. Drawings (Not Reissued). None
d. Drawings (Reissued). The following drawing(s) are revised with a revision date as indicated in the title block, and reissued with this amendment.
(1) Sheet C-100A, SITE LAYOUT PLAN, NORTH GATE
(2) Sheet C-100A, SITE LAYOUT PLAN, SOUTH GATE
2. This amendment is a part of the proposing papers and its receipt shall be acknowledged on the Standard Form 1442. All other conditions and requirements of the request for proposal remain unchanged. If the proposals have been mailed prior to receiving this amendment, you will notify the office where proposals are received, in the specified manner, immediately of its receipt and of any changes in your proposal thereby occasioned.
Am #0006 - 3 (Continuation of SF30)
a. Hand-Carried Proposals shall be delivered to the U.S. Army Corps of Engineers, Omaha District, Contracting Division, 1616 Capitol Avenue, Omaha, Nebraska 68102-4901.
b. Mailed Proposals shall be addressed as noted in Item 8 on Page 00 10 00-1 of Standard Form 1442.
3. Offers will be received until 2:00 p.m, local time at place of receiving proposals, 25 AUG 2016.
Attachments:
Section 00 10 00 – Standard Form 1442 and CLIN Pricing Schedule Drawings as listed in 1.d. above
U.S. Army Corps of Engineers, Omaha District 1616 Capitol Avenue
16 AUG 2016
NEP/2160
This page was intentionally left blank for duplex printing.
Am #0006 00 10 00 - 1
SOLICITATION, OFFER
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
W9128F-16-R-0090
2. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
3. DATE ISSUED
08 JUL 2016
PAGES OF PAGES
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
6. PROJECT NO.
7. ISSUED BY CODE CT 8. ADDRESS OFFER TO
U.S.ARMY CORPS OF ENGINEERS, OMAHA
Contracting Division (CENWO-CT) 1616 Capitol Ave
U.S.ARMY CORPS OF ENGINEERS, OMAHA
Attn: CONTRACTING DIVISION (CENWO-CT) 1616 Capitol Ave
9. FOR INFORMATION
CALL:
A. NAME
Donna Larson
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
(402) 995-2066
SOLICITATION
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date):
The offeror hereby agrees to do all work described in the documents entitled:
FRONT GATES FORCE PROTECTION
XQPZ 09 4013
USAF ACADEMY, COLORADO
RETURN WITH OFFER: INFORMATION REQUIRED BY SECTION 00 10 00 (SF1442), SECTION 00 22 00, AND SECTION 00 45 00.
*BLOCK 13A. – REFER TO SECTION 00 22 00 FOR THE NUMBER OF COPIES TO BE SUBMITTED WITH THE ORIGINAL OFFER.
THIS SOLICITATION IS UNRESTRICTED.
11. The Contractor shall begin performance within 10 calendar days and complete it within ** calendar days after receiving award, notice to proceed. This performance period is mandatory, negotiable. (** - See CLIN Pricing Schedule)
12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
YES NO
12B. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and * copies to perform the work required are due at the place specified in Item 8 by 1400 (hour) local time 25 AUG 2016. If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is is not required.
C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than ___90___ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442(REV. 4-85)
Prescribed by GSA FAR(48 CFR) 53.236-1(e)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
Am #0006 00 10 00 - 2
DUNS Number:
16. REMITTANCE ADDRESS (Include only if different than Item 14)
CODE FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ** calendar days after the date offers are due.
AMOUNTS
SEE ATTACHED CLIN PRICING SCHEDULE
Contractor’s Fax No. CAGE CODE Contractor’s E-Mail address
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation - give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER
(Type or print)
20B. SIGNATURE 20C. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) ( ) 41 U.S.C. 253(c) ( )
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
U.S. Army Engineer District, Omaha 1616 Capitol Ave.
Omaha, Nebraska 68102-4901
USAED Omaha c/o USACE Finance Center 5722 Integrity Drive Millington, TN 38054-5005
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
28. NEGOTIATED AGREEMENT (contractor is required to sign this document and return _______ copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work, requisitions identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award,
(b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation, is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED
TO SIGN (Type or print)
31A. NAME OF CONTRACTING OFFICER (Type or print)
30B. SIGNATURE 30C. DATE 31B. UNITED STATES OF AMERICA
BY
31C. AWARD DATE
STANDARD FORM 1442 BACK (REV. 4-85)
Am #0006 00 10 00 – 3
CONTRACT LINE ITEM PRICING SCHEDULE
ITEM NO. DESCRIPTION QUANTITY UNIT AMOUNT
BASIC ITEMS
Entire work complete for Design of the Front Gates Force Protection
Job
Construction of South Gate Canopy and POV Inspection excluding Option Items listed below
Construction of North Gate Canopy and POV Inspection excluding Option Items listed below
Construction of the Passive Force Protection Features and Landscaping
TOTAL AMOUNT $_____________________________
OPTION ITEMS
[Option]
Entire work complete to add drainage pipe under access road at North Gate/Santa Fe Trail parking lot
[Option]
Entire work complete to add infrastructure for CCTV cameras at each existing guard shack
TOTAL AMOUNT (BASIC PLUS OPTIONS) $_________________________________
Am #0006 00 10 00 – 4
OFFEROR'S NAME:____________________________
Performance Duration in Calendar Days After the Notice to Proceed is Received Should Not Exceed 360 Days.
(See Note No. 4)
____________ DAYS
NOTES:
1. See SECTION 00 21 01, INSTRUCTIONS TO OFFERORS for evaluation of options. The Government reserves the right to exercise the options within 90 days after issuance of Notice to Proceed.
2. Prices must be entered for all items of the schedule. Total amounts submitted without prices being entered on individual items will be rejected. Additions will be subject to verification by the Government. In case of variation between the lump-sum prices and the total amount, the lump-sum prices will be considered the price submitted.
3. A modification to a proposal which provides for a single adjustment to the total amount submitted, should state the application of the adjustment to each respective lump-sum price affected.
4. The Offeror shall propose a total integrated contract duration in number of calendar days after the Notice to
Proceed (NTP) is received by the Contractor. The total number of proposed calendar days for design and construction through completion, ready for turnover should not exceed 360 calendar days. The proposed duration shall become the required contract. The Government may issue the NTP via e-mail or Facsimile (FAX) or by other means. Day number 1 is the day after the date of receipt of the NTP. See Section 00 73 00, paragraph 1.1: COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK.
FLAG NOTES
PLACE CULVERT UNDER DRIVE (OPTION)8.
NOT USED.7.
PROPOSED POV SHELTER - DRIVER WAITING AREA.6.
NOT USED.5.
PROPOSED CANOPY AND POV INSPECTION STRUCTURE ROOF LINE.4.
DRAWINGS.
PROPOSED STRUCTURAL CANOPY SUPPORT WALLS. RE: ARCHITECTURAL 3.
PROPOSED CONCRETE VERTICAL CURB AND GUTTER.2.
CONSTRUCT ASPHALT PAVING WHERE SHOWN.1.
GENERAL NOTES
REFER TO THE UTILITY PLAN.
18" CLEARANCE FOR PROPOSED UTILITY CROSSINGS AS REQUIRED.
CONTRACTOR SHALL LOWER EXISTING WATERLINES TO ALLOW MINIMUM
IMPROVEMENT AREAS OR UTILITY CROSSINGS AS REQUIRED.
CONTRACTOR SHALL RELOCATE EXISTING UTILITIES AT PROPOSED 6.
AND CONSTRUCTION.
CONTRACTOR SHALL POT-HOLE EXISTING UTILITIES PRIOR TO DESIGN 5.
DURING CONSTRUCTION.
CONTRACTOR SHALL PROVIDE AND IMPLEMENT A TRAFFIC CONTROL PLAN 4.
VEGETATION.
SEED MIX REQUIREMENTS AND RE-ESTABLISHMENT OF NATIVE
REFER TO THE LANDSCAPE PLANS AND SPECIFICATIONS FOR PLANTINGS, 3.
COMPLETION OF CONSTRUCTION.
CLEARED AREAS AND TO RE-ESTABLISH NATIVE GRASSES AT THE
THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE DUST CONTROL OF
STAGING AREA SHOWN. WITH THE USAFA PRIOR TO CONSTRUCTION. IT IS
THE CONTRACTOR SHALL COORDINATE THE USE OF THE CONTRACTOR 2.
AND REMOVAL INFRASTRUCTURE COORDINATION.
REFER TO THE SITE AND UTILITY PLANS FOR PROPOSED IMPROVEMENTS 1.
UPON IMPACT.
EXCAVATION THAT ARE CAPABLE OF DEFLECTING AN ERRANT VEHICLE
PROVIDE CRASHWORTHY TEMPORARY TRAFFIC BARRIERS AROUND THE
AS PART OF THE TRAFFIC SAFETY MEASURES THE CONTRACTOR SHALL
REQUIREMENT FOR EXCAVATION IN CLOSE PROXIMITY TO TRAVEL LANES,
MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD). DUE TO THE
CONTROL SHALL BE IN ACCORDANCE WITH ALL REQUIREMENTS OF THE
CONTRACTOR SHALL MAINTAIN TRAFFIC SAFETY AT ALL TIMES. TRAFFIC8.
REGARD TO TEMPERATURE, RATE, VOLUME, AND DURATION OF FLOW."
FEASIBLE, THE PREDEVELOPMENT HYDROLOGY OF THE PROPERTY WITH
MUST "MAINTAIN OR RESTORE, TO THE MAXIMUM EXTENT TECHNICALLY
THESE REQUIREMENTS, FEDERAL FACILITY PROJECTS OVER 5,000 SF
FEDERAL DEVELOPMENT AND REDEVELOPMENT PROJECTS. UNDER
SECTION 438 ESTABLISHES INTO LAW NEW STORM WATER DESIGN FOR
OF THE ENERGY INDEPENDENCE AND SECURITY ACT (EISA). EISA
IMPLEMENTATION OF STORM WATER REQUIREMENTS UNDER SECTION 438
THE STORM WATER MANAGEMENT DESIGN SHALL COMPLY WITH THE DoD 7.
CONSTRUCTION LIMITS
CONTRACTOR STAGING AREA
PREBLES MEADOW
JUMPING MOUSE HABITAT
BOUNDARY
CONSTRUCTION LIMITS
NORTH G
ATE
BLVD.
E
T T
EE
W
T
T
FO
E AC
EE
FO
8 1
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
SHEET ID
2 3 4 5 6 7 8 9
F
E
D
C
B
A
10 11
G
H
O M
A H
A D
IS
T R
IC
T
O M
A H
A
N E
B R
A S
K A
J U
N E
A R
C
D
U S A
IR
F
O R
C E A
C A
D E
M Y
C O
L O
R A
D O
F R
O N
T G
A T
E S F
O R
C E P
R O
T E
C T
IO
N
C A
N O
P Y D
E S
IG
N
Omaha District of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
W F -1
-R -0
F
IL
E N
U M
B E
R
N
SCALE: 1"=30'
15 30 60
B
F -5
-0
A A
C -1
A .d w g
/1
/2
E
N E
R A
L R
E V
IS
IO
N S
G E
N E
R A
L R
E V
IS
IO
C-100A
IT
E L
A Y
O U
T P
L A
N
N O
R T
H G
A T
/1
/2
This page was intentionally left blank for duplex printing.
E
E
E
CO
CO
CO
WV
T
WHOUSE
GUARD
E
W
W
CO
CO
CO
COCO
COCO
COCO
CO
CO
CO
CO
CO
CO
CO
CO
CO CO
CO
WV
T
SA
HOUSE
GUARD
T
W
LVIS
LVIS
FLAG NOTES
NOT USED.14.
PROJECT AND WILL BE DESIGNED BY OTHERS.
POV "REJECTION" LANE. THESE IMPROVEMENTS ARE PART OF THE LVIS 13.
REMOVE EXISTING CURB AND GUTTER.12.
SAWCUT EXISTING ASPHALT.11.
IMPROVEMENTS.
REFER TO LANDSCAPE PLANS FOR PLANTING AND STONE WALL 10.
NOT USED.9.
PROPOSED POV SHELTER CANOPY ROOF LINE.8.
PROPOSED CONCRETE SIDEWALK.7.
PROPOSED VEHICLE SECURITY GATE. 6.
PROPOSED POV SHELTER - DRIVER WAITING AREA.5.
PROPOSED CONCRETE VERTICAL CURB AND GUTTER.4.
PROPOSED ASPHALT PAVEMENT AS SHOWN.3.
CANOPY ROOF LINE. RE: ARCHITECTURAL DRAWINGS.2.
DRAWINGS.
PROPOSED STRUCTURAL CANOPY SUPPORT WALLS. RE: ARCHITECTURAL 1.
GENERAL NOTES
DURATION OF FLOW."
PROPERTY WITH REGARD TO TEMPERATURE, RATE, VOLUME, AND
TECHNICALLY FEASIBLE, THE PREDEVELOPMENT HYDROLOGY OF THE
OVER 5,000 SF MUST "MAINTAIN OR RESTORE, TO THE MAXIMUM EXTENT
PROJECTS. UNDER THESE REQUIREMENTS, FEDERAL FACILITY PROJECTS
REQUIREMENTS FOR FEDERAL DEVELOPMENT AND REDEVELOPMENT
SECTION 438 ESTABLISHES INTO LAW NEW STORM WATER DESIGN
OF THE ENERGY INDEPENDENCE AND SECURITY ACT (EISA). EISA
IMPLEMENTATION OF STORM WATER REQUIREMENTS UNDER SECTION 438
THE STORM WATER MANAGEMENT DESIGN SHALL COMPLY WITH THE DoD 8.
REMOVAL OF UTILITIES WITHIN THE CONSTRUCTION LIMITS.
REFER TO THE DEMOLITION AND UTILITY PLANS FOR RELOCATION AND 7.
AREA WITH THE CONTRACTING OFFICER.
THE CONTRACTOR SHALL COORDINATE THE LOCATION OF THE STORAGE 6.
REFER TO THE UTILITY PLAN.
18" CLEARANCE FOR PROPOSED UTILITY CROSSINGS AS REQUIRED.
CONTRACTOR SHALL LOWER EXISTING WATERLINES TO ALLOW MINIMUM
IMPROVEMENT AREAS OR UTILITY CROSSINGS AS REQUIRED.
CONTRACTOR SHALL RELOCATE EXISTING UTILITIES AT PROPOSED 5.
AND VERTICAL DESIGN INFORMATION.
UTILITIES PRIOR TO DESIGN AND CONSTRUCTION TO VERIFY HORIZONTAL
IT IS THE CONTRACTORS RESPONSIBILITY TO POT-HOLE ALL EXISTING 4.
DEFLECTING AN ERRANT VEHICLE UPON IMPACT.
TEMPORARY TRAFFIC BARRIERS AROUND THE EXCAVATION, CAPABLE OF
MEASURES THE CONTRACTOR SHALL PROVIDED CRASHWORTHY
CLOSE PROXIMITY TO TRAVEL LANES, AS PART OF THE TRAFFIC SAFETY
DEVICES (MUTCD). DUE TO THE REQUIREMENT FOR EXCAVATION IN
REQUIREMENTS OF THE MANUAL ON UNIFORM TRAFFIC CONTROL
AT ALL TIMES. TRAFFIC CONTROL SHALL BE IN ACCORDANCE WITH ALL
DURING CONSTRUCTION. CONTRACTOR SHALL MAINTAIN TRAFFIC SAFETY
CONTRACTOR SHALL PROVIDE AND IMPLEMENT A TRAFFIC CONTROL PLAN 3.
REQUIREMENTS AND RE-ESTABLISHMENT OF NATIVE VEGETATION.
REFER TO THE LANDSCAPE PLANS AND SPECIFICATIONS FOR SEED MIX 2.
COMPLETION OF CONSTRUCTION.
CLEARED AREAS AND TO RE-ESTABLISH NATIVE GRASSES AT THE
CONTRACTOR'S RESPONSIBILITY TO PROVIDE DUST CONTROL OF
BE COMPLETED PRIOR TO REMOVAL OF EXISTING FACILITIES. IT IS THE
THROUGHOUT CONSTRUCTION. ANY NEW COMMUNICATION LINES SHALL
ALL COMMUNICATION UTILITIES SHALL REMAIN FUNCTIONAL 1.
OVERALL SITE PLAN
CANOPY AREA SITE PLAN
CONSTRUCTION LIMITS
SOUTH GATE BLVD.
CONSTRUCTION LIMITS
SOUTH GATE BLVD.
CONSTRUCTION LIMITS
(INCLUDING LANDSCAPE IMPROVEMENTS)
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
SHEET ID
2 3 4 5 6 7 8 9
F
E
D
C
B
A
10 11
O
A H
A D
IS
T R
IC
T
O M
A H
A
N E
B R
A S
K A
J U
N E
R
C
U
A
IR
F
O R
C E A
C A
D E
M Y
C O
L O
R A
D O
F R
O N
T G
A T
E S F
O R
C E P
R O
T E
C T
IO
N
C A
N O
P Y D
E S
IG
Omaha District of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
W F -1
-R -0
F
IL
E N
U M
B E
R
SCALE: 1"=30'
15 30 60
N
SCALE: 1"=100'
50 100 200
B
F -5
-0
A A
C -1
B .d w g
/1
/2
N E
R A
L R
E V
IS
IO
C-100B
IT
E L
A Y
O U
T P
L A
N
S O
U T
H G
A T
| Standard_Form_30 |
| Am_0006_Narrative |
| Attachments |
| 00 10 00 |
| 00 10 00-SF1442 |
| 00 10 00-3 |
| Drawings (re-issued) |
| AA39C-100A |
| AA39C-100B |
File details come from the government source that posted it. Updated .