Am_0006.pdf

PDF 1 MB Posted

Attached to
FRONT GATES FORCE PROTECTION, PN XQPZ094013 Federal contract opportunity
Solicitation number
W9128F-16-R-0090
Issued by
Department of the Army Corps of Engineers Engineering District Omaha

About this file

Amendment 0006

View the file

Other files for this federal contract opportunity

Other files attached to FRONT GATES FORCE PROTECTION, PN XQPZ094013, newest first.
File Type Posted
Am_0008.pdf PDF
Am_0007.pdf PDF
Am_0005.pdf PDF
Am_0004.pdf PDF
RFP_CAD_files-revit-s-gate.7z 7Z file
RFP_CAD_files-revit-n-gate.7z 7Z file
RFP_CAD_files.7z 7Z file
Am_0003.pdf PDF
Am_0002.pdf PDF
Am_0001.pdf PDF
W9128F-16-R-0090_DRAWINGS_NORTH_GATE.PDF PDF
W9128F-16-R-0090_DRAWINGS_SOUTH_GATE.PDF PDF
W9128F-16-R-0090_USAFA_Front_Gate-Specs.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICIATION NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPIRATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION ( Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

Amendment No. 0006 Aug 16, 2016

U.S ARMY CORPS OF ENGINEERS, OMAHA DISTRICT

CONTRACTING OFFICE

1616 CAPITOL AVE.

OMAHA, NE 68102-4901

See Item 6

W9128F-16-R-0090

Jul 8, 2016

FRONT GATES FORCE PROTECTION, XQPZ 09 4013, USAF ACADEMY, COLORADO

See attached documentation for content of the amendment revisions

Date for receipt of Proposals is 25 AUG 2016 at 1400 hours

Government Point of Contact: Donna Larson(402) 995-2066

8/16/2016

Am #0006 - 1

Am #0006 - 2 (Continuation of SF30)

DEPARTMENT OF THE ARMY

Omaha District, Corps of Engineers

1616 Capitol Avenue Omaha, Nebraska 68102-4901

:NOTICE: Failure to acknowledge : Solicitation No. W9128F-16-R-0090 :all amendments may cause rejec-:

:tion of the offer. See FAR : Date of Issue: 8 JUL 2016 :52.215-1 of Section 00 21 00. : Date of Receiving Proposals:

25 AUG 2016

Amendment No. 0006

16 AUG 2016

SUBJECT: Amendment No. 0006 to Request for Proposal Specifications and Drawings for Design and Construction of Front Gates Force Protection.

TO: Prospective Offerors and Others Concerned

1. The specifications and drawings for subject project are hereby modified as follows (revise all specification indices, attachment lists, and drawing indices accordingly).

a. Specifications. (Descriptive Changes)

None.

b. Specifications (New and/or Revised and Reissued). Delete and substitute or add specification pages as noted below. The substituted pages are revised and reissued with this amendment.

Pages Deleted Pages Substituted or Added

00 10 00 00 10 00

Note: CLIN Pricing Schedule, 00 10 00-3 revised such that Option Item 0006 deleted and Option Item 0007 renumbered to 0006.

c. Drawings (Not Reissued). None

d. Drawings (Reissued). The following drawing(s) are revised with a revision date as indicated in the title block, and reissued with this amendment.

(1) Sheet C-100A, SITE LAYOUT PLAN, NORTH GATE

(2) Sheet C-100A, SITE LAYOUT PLAN, SOUTH GATE

2. This amendment is a part of the proposing papers and its receipt shall be acknowledged on the Standard Form 1442. All other conditions and requirements of the request for proposal remain unchanged. If the proposals have been mailed prior to receiving this amendment, you will notify the office where proposals are received, in the specified manner, immediately of its receipt and of any changes in your proposal thereby occasioned.

Am #0006 - 3 (Continuation of SF30)

a. Hand-Carried Proposals shall be delivered to the U.S. Army Corps of Engineers, Omaha District, Contracting Division, 1616 Capitol Avenue, Omaha, Nebraska 68102-4901.

b. Mailed Proposals shall be addressed as noted in Item 8 on Page 00 10 00-1 of Standard Form 1442.

3. Offers will be received until 2:00 p.m, local time at place of receiving proposals, 25 AUG 2016.

Attachments:

Section 00 10 00 – Standard Form 1442 and CLIN Pricing Schedule Drawings as listed in 1.d. above

U.S. Army Corps of Engineers, Omaha District 1616 Capitol Avenue

16 AUG 2016

NEP/2160

This page was intentionally left blank for duplex printing.

Am #0006 00 10 00 - 1

SOLICITATION, OFFER

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

W9128F-16-R-0090

2. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

3. DATE ISSUED

08 JUL 2016

PAGES OF PAGES

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.

6. PROJECT NO.

7. ISSUED BY CODE CT 8. ADDRESS OFFER TO

U.S.ARMY CORPS OF ENGINEERS, OMAHA

Contracting Division (CENWO-CT) 1616 Capitol Ave

U.S.ARMY CORPS OF ENGINEERS, OMAHA

Attn: CONTRACTING DIVISION (CENWO-CT) 1616 Capitol Ave

9. FOR INFORMATION

CALL:

A. NAME

Donna Larson

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

(402) 995-2066

SOLICITATION

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date):

The offeror hereby agrees to do all work described in the documents entitled:

FRONT GATES FORCE PROTECTION

XQPZ 09 4013

USAF ACADEMY, COLORADO

RETURN WITH OFFER: INFORMATION REQUIRED BY SECTION 00 10 00 (SF1442), SECTION 00 22 00, AND SECTION 00 45 00.

*BLOCK 13A. – REFER TO SECTION 00 22 00 FOR THE NUMBER OF COPIES TO BE SUBMITTED WITH THE ORIGINAL OFFER.

THIS SOLICITATION IS UNRESTRICTED.

11. The Contractor shall begin performance within 10 calendar days and complete it within ** calendar days after receiving award, notice to proceed. This performance period is mandatory, negotiable. (** - See CLIN Pricing Schedule)

12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

YES NO

12B. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and * copies to perform the work required are due at the place specified in Item 8 by 1400 (hour) local time 25 AUG 2016. If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee is is not required.

C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than ___90___ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442(REV. 4-85)

Prescribed by GSA FAR(48 CFR) 53.236-1(e)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

Am #0006 00 10 00 - 2

DUNS Number:

16. REMITTANCE ADDRESS (Include only if different than Item 14)

CODE FACILITY CODE

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ** calendar days after the date offers are due.

AMOUNTS

SEE ATTACHED CLIN PRICING SCHEDULE

Contractor’s Fax No. CAGE CODE Contractor’s E-Mail address

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation - give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER

(Type or print)

20B. SIGNATURE 20C. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) ( ) 41 U.S.C. 253(c) ( )

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

U.S. Army Engineer District, Omaha 1616 Capitol Ave.

Omaha, Nebraska 68102-4901

USAED Omaha c/o USACE Finance Center 5722 Integrity Drive Millington, TN 38054-5005

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

28. NEGOTIATED AGREEMENT (contractor is required to sign this document and return _______ copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work, requisitions identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award,

(b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation, is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED

TO SIGN (Type or print)

31A. NAME OF CONTRACTING OFFICER (Type or print)

30B. SIGNATURE 30C. DATE 31B. UNITED STATES OF AMERICA

BY

31C. AWARD DATE

STANDARD FORM 1442 BACK (REV. 4-85)

Am #0006 00 10 00 – 3

CONTRACT LINE ITEM PRICING SCHEDULE

ITEM NO. DESCRIPTION QUANTITY UNIT AMOUNT

BASIC ITEMS

Entire work complete for Design of the Front Gates Force Protection

Job

Construction of South Gate Canopy and POV Inspection excluding Option Items listed below

Construction of North Gate Canopy and POV Inspection excluding Option Items listed below

Construction of the Passive Force Protection Features and Landscaping

TOTAL AMOUNT $_____________________________

OPTION ITEMS

[Option]

Entire work complete to add drainage pipe under access road at North Gate/Santa Fe Trail parking lot

[Option]

Entire work complete to add infrastructure for CCTV cameras at each existing guard shack

TOTAL AMOUNT (BASIC PLUS OPTIONS) $_________________________________

Am #0006 00 10 00 – 4

OFFEROR'S NAME:____________________________

Performance Duration in Calendar Days After the Notice to Proceed is Received Should Not Exceed 360 Days.

(See Note No. 4)

____________ DAYS

NOTES:

1. See SECTION 00 21 01, INSTRUCTIONS TO OFFERORS for evaluation of options. The Government reserves the right to exercise the options within 90 days after issuance of Notice to Proceed.

2. Prices must be entered for all items of the schedule. Total amounts submitted without prices being entered on individual items will be rejected. Additions will be subject to verification by the Government. In case of variation between the lump-sum prices and the total amount, the lump-sum prices will be considered the price submitted.

3. A modification to a proposal which provides for a single adjustment to the total amount submitted, should state the application of the adjustment to each respective lump-sum price affected.

4. The Offeror shall propose a total integrated contract duration in number of calendar days after the Notice to

Proceed (NTP) is received by the Contractor. The total number of proposed calendar days for design and construction through completion, ready for turnover should not exceed 360 calendar days. The proposed duration shall become the required contract. The Government may issue the NTP via e-mail or Facsimile (FAX) or by other means. Day number 1 is the day after the date of receipt of the NTP. See Section 00 73 00, paragraph 1.1: COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK.

FLAG NOTES

PLACE CULVERT UNDER DRIVE (OPTION)8.

NOT USED.7.

PROPOSED POV SHELTER - DRIVER WAITING AREA.6.

NOT USED.5.

PROPOSED CANOPY AND POV INSPECTION STRUCTURE ROOF LINE.4.

DRAWINGS.

PROPOSED STRUCTURAL CANOPY SUPPORT WALLS. RE: ARCHITECTURAL 3.

PROPOSED CONCRETE VERTICAL CURB AND GUTTER.2.

CONSTRUCT ASPHALT PAVING WHERE SHOWN.1.

GENERAL NOTES

REFER TO THE UTILITY PLAN.

18" CLEARANCE FOR PROPOSED UTILITY CROSSINGS AS REQUIRED.

CONTRACTOR SHALL LOWER EXISTING WATERLINES TO ALLOW MINIMUM

IMPROVEMENT AREAS OR UTILITY CROSSINGS AS REQUIRED.

CONTRACTOR SHALL RELOCATE EXISTING UTILITIES AT PROPOSED 6.

AND CONSTRUCTION.

CONTRACTOR SHALL POT-HOLE EXISTING UTILITIES PRIOR TO DESIGN 5.

DURING CONSTRUCTION.

CONTRACTOR SHALL PROVIDE AND IMPLEMENT A TRAFFIC CONTROL PLAN 4.

VEGETATION.

SEED MIX REQUIREMENTS AND RE-ESTABLISHMENT OF NATIVE

REFER TO THE LANDSCAPE PLANS AND SPECIFICATIONS FOR PLANTINGS, 3.

COMPLETION OF CONSTRUCTION.

CLEARED AREAS AND TO RE-ESTABLISH NATIVE GRASSES AT THE

THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE DUST CONTROL OF

STAGING AREA SHOWN. WITH THE USAFA PRIOR TO CONSTRUCTION. IT IS

THE CONTRACTOR SHALL COORDINATE THE USE OF THE CONTRACTOR 2.

AND REMOVAL INFRASTRUCTURE COORDINATION.

REFER TO THE SITE AND UTILITY PLANS FOR PROPOSED IMPROVEMENTS 1.

UPON IMPACT.

EXCAVATION THAT ARE CAPABLE OF DEFLECTING AN ERRANT VEHICLE

PROVIDE CRASHWORTHY TEMPORARY TRAFFIC BARRIERS AROUND THE

AS PART OF THE TRAFFIC SAFETY MEASURES THE CONTRACTOR SHALL

REQUIREMENT FOR EXCAVATION IN CLOSE PROXIMITY TO TRAVEL LANES,

MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD). DUE TO THE

CONTROL SHALL BE IN ACCORDANCE WITH ALL REQUIREMENTS OF THE

CONTRACTOR SHALL MAINTAIN TRAFFIC SAFETY AT ALL TIMES. TRAFFIC8.

REGARD TO TEMPERATURE, RATE, VOLUME, AND DURATION OF FLOW."

FEASIBLE, THE PREDEVELOPMENT HYDROLOGY OF THE PROPERTY WITH

MUST "MAINTAIN OR RESTORE, TO THE MAXIMUM EXTENT TECHNICALLY

THESE REQUIREMENTS, FEDERAL FACILITY PROJECTS OVER 5,000 SF

FEDERAL DEVELOPMENT AND REDEVELOPMENT PROJECTS. UNDER

SECTION 438 ESTABLISHES INTO LAW NEW STORM WATER DESIGN FOR

OF THE ENERGY INDEPENDENCE AND SECURITY ACT (EISA). EISA

IMPLEMENTATION OF STORM WATER REQUIREMENTS UNDER SECTION 438

THE STORM WATER MANAGEMENT DESIGN SHALL COMPLY WITH THE DoD 7.

CONSTRUCTION LIMITS

CONTRACTOR STAGING AREA

PREBLES MEADOW

JUMPING MOUSE HABITAT

BOUNDARY

CONSTRUCTION LIMITS

NORTH G

ATE

BLVD.

E

T T

EE

W

T

T

FO

E AC

EE

FO

8 1

S O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

SHEET ID

2 3 4 5 6 7 8 9

F

E

D

C

B

A

10 11

G

H

O M

A H

A D

IS

T R

IC

T

O M

A H

A

N E

B R

A S

K A

J U

N E

A R

C

D

U S A

IR

F

O R

C E A

C A

D E

M Y

C O

L O

R A

D O

F R

O N

T G

A T

E S F

O R

C E P

R O

T E

C T

IO

N

C A

N O

P Y D

E S

IG

N

Omaha District of Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

W F -1

-R -0

F

IL

E N

U M

B E

R

N

SCALE: 1"=30'

15 30 60

B

F -5

-0

A A

C -1

A .d w g

/1

/2

E

N E

R A

L R

E V

IS

IO

N S

G E

N E

R A

L R

E V

IS

IO

C-100A

IT

E L

A Y

O U

T P

L A

N

N O

R T

H G

A T

/1

/2

This page was intentionally left blank for duplex printing.

E

E

E

CO

CO

CO

WV

T

WHOUSE

GUARD

E

W

W

CO

CO

CO

COCO

COCO

COCO

CO

CO

CO

CO

CO

CO

CO

CO

CO CO

CO

WV

T

SA

HOUSE

GUARD

T

W

LVIS

LVIS

FLAG NOTES

NOT USED.14.

PROJECT AND WILL BE DESIGNED BY OTHERS.

POV "REJECTION" LANE. THESE IMPROVEMENTS ARE PART OF THE LVIS 13.

REMOVE EXISTING CURB AND GUTTER.12.

SAWCUT EXISTING ASPHALT.11.

IMPROVEMENTS.

REFER TO LANDSCAPE PLANS FOR PLANTING AND STONE WALL 10.

NOT USED.9.

PROPOSED POV SHELTER CANOPY ROOF LINE.8.

PROPOSED CONCRETE SIDEWALK.7.

PROPOSED VEHICLE SECURITY GATE. 6.

PROPOSED POV SHELTER - DRIVER WAITING AREA.5.

PROPOSED CONCRETE VERTICAL CURB AND GUTTER.4.

PROPOSED ASPHALT PAVEMENT AS SHOWN.3.

CANOPY ROOF LINE. RE: ARCHITECTURAL DRAWINGS.2.

DRAWINGS.

PROPOSED STRUCTURAL CANOPY SUPPORT WALLS. RE: ARCHITECTURAL 1.

GENERAL NOTES

DURATION OF FLOW."

PROPERTY WITH REGARD TO TEMPERATURE, RATE, VOLUME, AND

TECHNICALLY FEASIBLE, THE PREDEVELOPMENT HYDROLOGY OF THE

OVER 5,000 SF MUST "MAINTAIN OR RESTORE, TO THE MAXIMUM EXTENT

PROJECTS. UNDER THESE REQUIREMENTS, FEDERAL FACILITY PROJECTS

REQUIREMENTS FOR FEDERAL DEVELOPMENT AND REDEVELOPMENT

SECTION 438 ESTABLISHES INTO LAW NEW STORM WATER DESIGN

OF THE ENERGY INDEPENDENCE AND SECURITY ACT (EISA). EISA

IMPLEMENTATION OF STORM WATER REQUIREMENTS UNDER SECTION 438

THE STORM WATER MANAGEMENT DESIGN SHALL COMPLY WITH THE DoD 8.

REMOVAL OF UTILITIES WITHIN THE CONSTRUCTION LIMITS.

REFER TO THE DEMOLITION AND UTILITY PLANS FOR RELOCATION AND 7.

AREA WITH THE CONTRACTING OFFICER.

THE CONTRACTOR SHALL COORDINATE THE LOCATION OF THE STORAGE 6.

REFER TO THE UTILITY PLAN.

18" CLEARANCE FOR PROPOSED UTILITY CROSSINGS AS REQUIRED.

CONTRACTOR SHALL LOWER EXISTING WATERLINES TO ALLOW MINIMUM

IMPROVEMENT AREAS OR UTILITY CROSSINGS AS REQUIRED.

CONTRACTOR SHALL RELOCATE EXISTING UTILITIES AT PROPOSED 5.

AND VERTICAL DESIGN INFORMATION.

UTILITIES PRIOR TO DESIGN AND CONSTRUCTION TO VERIFY HORIZONTAL

IT IS THE CONTRACTORS RESPONSIBILITY TO POT-HOLE ALL EXISTING 4.

DEFLECTING AN ERRANT VEHICLE UPON IMPACT.

TEMPORARY TRAFFIC BARRIERS AROUND THE EXCAVATION, CAPABLE OF

MEASURES THE CONTRACTOR SHALL PROVIDED CRASHWORTHY

CLOSE PROXIMITY TO TRAVEL LANES, AS PART OF THE TRAFFIC SAFETY

DEVICES (MUTCD). DUE TO THE REQUIREMENT FOR EXCAVATION IN

REQUIREMENTS OF THE MANUAL ON UNIFORM TRAFFIC CONTROL

AT ALL TIMES. TRAFFIC CONTROL SHALL BE IN ACCORDANCE WITH ALL

DURING CONSTRUCTION. CONTRACTOR SHALL MAINTAIN TRAFFIC SAFETY

CONTRACTOR SHALL PROVIDE AND IMPLEMENT A TRAFFIC CONTROL PLAN 3.

REQUIREMENTS AND RE-ESTABLISHMENT OF NATIVE VEGETATION.

REFER TO THE LANDSCAPE PLANS AND SPECIFICATIONS FOR SEED MIX 2.

COMPLETION OF CONSTRUCTION.

CLEARED AREAS AND TO RE-ESTABLISH NATIVE GRASSES AT THE

CONTRACTOR'S RESPONSIBILITY TO PROVIDE DUST CONTROL OF

BE COMPLETED PRIOR TO REMOVAL OF EXISTING FACILITIES. IT IS THE

THROUGHOUT CONSTRUCTION. ANY NEW COMMUNICATION LINES SHALL

ALL COMMUNICATION UTILITIES SHALL REMAIN FUNCTIONAL 1.

OVERALL SITE PLAN

CANOPY AREA SITE PLAN

CONSTRUCTION LIMITS

SOUTH GATE BLVD.

CONSTRUCTION LIMITS

SOUTH GATE BLVD.

CONSTRUCTION LIMITS

(INCLUDING LANDSCAPE IMPROVEMENTS)

S O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

SHEET ID

2 3 4 5 6 7 8 9

F

E

D

C

B

A

10 11

O

A H

A D

IS

T R

IC

T

O M

A H

A

N E

B R

A S

K A

J U

N E

R

C

U

A

IR

F

O R

C E A

C A

D E

M Y

C O

L O

R A

D O

F R

O N

T G

A T

E S F

O R

C E P

R O

T E

C T

IO

N

C A

N O

P Y D

E S

IG

Omaha District of Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

W F -1

-R -0

F

IL

E N

U M

B E

R

SCALE: 1"=30'

15 30 60

N

SCALE: 1"=100'

50 100 200

B

F -5

-0

A A

C -1

B .d w g

/1

/2

N E

R A

L R

E V

IS

IO

C-100B

IT

E L

A Y

O U

T P

L A

N

S O

U T

H G

A T

Standard_Form_30
Am_0006_Narrative
Attachments
00 10 00
00 10 00-SF1442
00 10 00-3
Drawings (re-issued)
AA39C-100A
AA39C-100B

File details come from the government source that posted it. Updated .