FR188, FR390, and FR604 Stabilization

Awarded Award Notice Posted

Solicitation number
AG-569R-S-16-0046
Agency
Region 9 - Eastern Region Forest Service, Department of Agriculture
Awarded
to M Jolma Inc.
Set-aside
Total Small Business

Opportunity facts

Contract number
AG569RC160057 Federal contract award
NAICS code
237310 Highway, Street, and Bridge Construction
PSC
Not on record
Place of performance
Ashland County, Wisconsin, United States

Notice details come from SAM.gov. Updated .

Notice text

2 versions

Update #2 · Latest ·

Added: Sep 12, 2016 9:49 am Solicitation Amendment 01 corrects the seeding rate description in Attachments B, C, and D, to read 30.49lbs/acre.  Offerors shall acknowledge this amendment by following the procedures identified in section 11 of the amendment (SF-30).  Solicitation response time remains at 2:30 Central on 9/22/2016.

Update #1 ·

Added: Sep 08, 2016 3:07 pm The Chequamegon-Nicolet National Forest announces an opportunity for the FR188, FR390, and FR604 Stabilization project. In accordance with FAR Part 36.204(b), the estimated magnitude of construction is between $100,000 and $150,000. The applicable North American Industry Classification System (NAICS) Code is 237310. The Small Business Administration size standard is $36.5 million. Contractors are required to be actively registered with the System for Award Management (SAM). No hard copies of the solicitation, supporting documents and applicable amendments, if any will be provided. To receive the entire solicitation package and any applicable amendments, prospective offerors must download them from the FedBizOpps website. The contractor shall provide all management and project administration services, quality control, logistical support, vehicles, labor, equipment and materials to complete the project on time and on schedule. The intent of this contract is to provide for the stabilization of Forest Roads 188, 390, and 604. This will include but is not limited to road grading, filling in washouts, seeding, fertilizing, removing sediment from wetlands and stream banks, and soil stabilization. A synopsis was not issued in advance of this solicitation, in accordance with FAR 5.202(a)(2), because of the urgency to perform the solicited repair work. Considering the urgency of this requirement, the solicitation response time was established in accordance with FAR 5.203(b).

Attachments

Files attached to this notice, newest first
File Type Posted
Amendment_01.pdf PDF
Attachment_E_-_Davis_Bacon_Wage_Determination.docx DOCX document
Attachment_C_-_FR390_Survey_Data.docx DOCX document
AG-569R-S-16-0046.rtf RTF text file
Attachment_B_-_FR188_Survey_Data.docx DOCX document
Attachment_D_-_FR604_Survey_Data.docx DOCX document
Attachment_A_-_Specifications.docx DOCX document

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
FR188, FR390, and FR604 Stabilization Latest Award Notice
FR188, FR390, and FR604 Stabilization This notice · Original Award Notice

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity