Attachment_D_-_FR604_Survey_Data.docx

DOCX document 168 KB Posted

Attached to
FR188, FR390, and FR604 Stabilization Federal contract opportunity
Solicitation number
AG-569R-S-16-0046
Issued by
Department of Agriculture Forest Service R9-Eastern Region

About this file

Attachment D - FR604 Survey Data

View the file

Other files for this federal contract opportunity

Other files attached to FR188, FR390, and FR604 Stabilization, newest first.
File Type Posted
Amendment_01.pdf PDF
Attachment_A_-_Specifications.docx DOCX document
Attachment_E_-_Davis_Bacon_Wage_Determination.docx DOCX document
Attachment_C_-_FR390_Survey_Data.docx DOCX document
AG-569R-S-16-0046.rtf RTF text file
Attachment_B_-_FR188_Survey_Data.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment D – FR604 Survey Data

AG-569R-S-16-0046

FR 604 ROAD STABLIZATION

CHEQUAMEGON-NICOLET NATIONAL FOREST

GREAT DIVIDE RANGER DISTRICT, ASHLAND COUNTY, WI

End of Project Beginning of Project

General Notes

1) CONSTRUCTION SPECIFICATIONS: Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-03 U.S. Customary Units, shall apply to this contract.

2) Minor amounts of clearing and grubbing are required at some culvert locations. Limbs, logs, & stumps may be scattered outside the clearing limits.

3) Maintenance for traffic will be the responsibility of the Contractor. Road closures will be accompanied by road detours in accordance with the Manual of Uniform Traffic Control Devices (2003) guidelines. This work shall be considered incidental to Pay Item 15101-Mobilization.

4) Contractor shall not perform wetland removal on these projects during abnormally high flows or abnormally wet periods.

5) All suitable structure excavation shall be used as backfill material for the culverts and washouts. Culverts shall be bedded using suitable material from the excavation.

6) All areas of excavation shall match the existing road template on either side of the crossing being replaced.

7) Erosion control mat shall be placed on slopes, ditches, and shoulders where called for.

8) All disturbed slopes shall be seeded with the seed mix listed below and mulched with straw.

9) Seed mixture: Big Bluestern, 10%; Sideoats Grama, 20%; Canada Wild Rye, 35%; Annual Rye, 10%; Little Bluestern, 10%; Indiangrass, 10%, Purple Prairie Clover, 4%; Black-eyed Susan, 1%. Seeding rate: 30.49 lbs/

Schedule of Items

Item Number
Description
Method of Meas.
Unit
Quantity
15101
Mobilization
DQ
LS
1
20418
Drainage Excavation
DQ
CY
60
30326
Road Reconditioning
DQ
Mile
0.15
32211
Agg. Surf., Comp. A, Truck Volume
DQ
CY
204
62503
Seeding, Dry Method
DQ
LS
1
62901
Erosion Control Mat, Type ENS-2
DQ
SY
100
63501
Temporary Traffic Control
DQ
LS
1

Station (Miles) Notes

0.0 Intersection with County Road GG.

1.06-1.09 Washout on RT. Place 24 C.Y. gravel. Place erosion control mat. Grade.

1.10-1.17 Ditching RT, excavate 60 C.Y. Place 60 C.Y. of Gravel. Place erosion control mat.

1.22 Place and spread 30 C.Y. of gravel at existing culvert.

1.27 Place and spread 30 C.Y. of gravel at existing culvert.

1.38-1.42 Place 60 C.Y. Gravel.

1.81 P.O.E intersection with FR 390.

image1.PNG image2.emf

TYPICAL ROAD SECTION

CL

0.02 FT/FT 0.02 FT/FT

2:1

2:1 2:1

20.00'

6" (COMPACTED DEPTH)

3/4" MINUS SURFACE

COURSE

File details come from the government source that posted it. Updated .